Welsh Elementary School

School · Grades PK–5

Weather at Welsh Elementary School

Loading the weather… Full forecast, radar & wind

Powered by WeatherDVR.com

Notices & days off

Days off come from the district's school-year calendar. Closures, early dismissals and announcements for this school appear here once they are published by the district or the school and checked. Every notice for Welsh Elementary · All district notices

Facts

Address
222 East Bourgeois Street, Welsh 70591
Principal
Erica Arabie
Front office
(337) 734-2351
Grades served
PK–5
Type
Not published
LDOE site code
027013
NCES school ID
220081000573
Map
Show on the school map
School Board district
School Board District 11 or District 12 (not yet confirmed)
The campus is in voting precinct 21, which the district plan divides; the dividing line is still awaiting review.
A board member represents the residents of an election district; it does not mean the member oversees this school alone. Source: district plan adopted May 12, 2022; map.

Principal: LDOE School Directory

Front-office phone: NCES school characteristics 2021-22 (phone numbers)

Board items mentioning this school

Total enrollmentBack to top

How many students were enrolled at this school on the count day. Counts are taken twice a year; the October count is the one most reports use.

495 students latest published value, 2025-26 Feb 1 · Source: Feb 2026 Multi Stats (Total by Site and School System)

Total enrollment by period

Chart loads with JavaScript; the table has every value.

Total enrollment by period with source
PeriodTotal enrollmentSource
2025-26 Feb 1 495 students Feb 2026 Multi Stats (Total by Site and School System)
2025-26 Oct 1 495 students Oct 2025 Multi Stats (Total by Site and School System) web
2024-25 Feb 1 509 students Feb 2025 Multi Stats (Total by Site and School System)
2024-25 Oct 1 505 students Oct 2024 Multi Stats (Total by Site and School System)
2023-24 Feb 1 486 students Feb 2024 Multi Stats (Total by Site and School System)
2023-24 Oct 1 486 students Oct 2023 Multi Stats (Total by Site and School System)
2022-23 Feb 1 485 students Feb 2023 Multi Stats (Total by Site and School System)
2022-23 Oct 1 488 students Oct 2022 Multi Stats (Total by Site and School System)
2021-22 Feb 1 450 students Feb 2022 Multi stats (Total by Site and School System)
2021-22 Oct 1 456 students Oct 2021 Multi stats (Total by Site and School System)
2020-21 Feb 1 485 students Feb 2021 Multi stats (Total by Site and School System)
2020-21 Oct 1 493 students Oct 2020 Multi stats (Total by Site and School System)
2019-20 Feb 1 519 students Feb 2020 Multi stats (Total by Site and School System)
2019-20 Oct 1 523 students Oct 2019 Multi stats (Total by Site and School System)
2018-19 Feb 1 517 students Feb 2019 Multi stats (Total by Site and School System)
2018-19 Oct 1 504 students Oct 2018 Multi stats (Total by Site and School System)
2017-18 Feb 1 511 students Feb 2018 Multi stats (Total by Site and School System)
2017-18 Oct 1 507 students Oct 2017 Multi stats (Total by Site and School System)

School Performance ScoreBack to top

The state's overall score for the school. Higher is better. The scale changed over time, so compare only within an era. 2013-2025 use the 150-point formula; 2026 onward use the Grow. Achieve. Thrive. formula. No score was issued for 2020.

Letter grades and School Performance Scores are assigned and published by the Louisiana Department of Education. JeffDavisEdu.com shows them as published; it does not calculate or issue them.

80 points latest published value, 2025 · Source: 2025 School Performance Scores

School Performance Score by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
School Performance Score by period with source
PeriodSchool Performance ScoreSource
2025 80 points 2025 School Performance Scores
2024 73.1 points 2024 School Performance Scores
2023 78.3 points 2023 School Performance Scores
2022 75.9 points 2022 School Performance Scores
2021 79.4 points LDOE published a simulated score for 2021 (COVID-19 year, marked C19 in the state file); no letter grades were issued 2021 School Performance Scores
2020 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2019 81.6 points 2019 School Performance Scores
2018 76.9 points 2018 School Performance Scores
2017 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2016 98.7 points 2016 School Performance Scores
2015 93 points 2015 School Performance Scores
2014 103.5 points 2014 School Performance Scores
2013 Not published No file for this year on the LDOE performance-scores page LDOE page: performance

150-point accountability formula (2013–2025): Scores from 2013 through 2025 are on the 150-point scale. 2025 is the final year on this formula. Details

No scores issued (2020–2020): LDOE did not issue School Performance Scores for 2019-20 because of COVID-19 testing waivers. Details

Grow. Achieve. Thrive. formula (2026–present): New accountability system adopted by BESE in June 2024; first official scores released in 2026. Not comparable with earlier years. Details

2013: No file for this year on the LDOE performance-scores page

2017: No file for this year on the LDOE performance-scores page

2020: No file for this year on the LDOE performance-scores page

School letter gradeBack to top

The state's A-F grade for the school that year. Grade cut points differ between formula eras.

Letter grades and School Performance Scores are assigned and published by the Louisiana Department of Education. JeffDavisEdu.com shows them as published; it does not calculate or issue them.

B latest published value, 2025 · Source: 2025 School Performance Scores

School letter grade by period

Chart loads with JavaScript; the table has every value.

School letter grade by period with source
PeriodSchool letter gradeSource
2025 B 2025 School Performance Scores
2024 C 2024 School Performance Scores
2023 B 2023 School Performance Scores
2022 B 2022 School Performance Scores
2020 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2019 B 2019 School Performance Scores
2018 B 2018 School Performance Scores
2017 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2016 B 2016 School Performance Scores
2015 B 2015 School Performance Scores
2014 A 2014 School Performance Scores
2013 Not published No file for this year on the LDOE performance-scores page LDOE page: performance

150-point accountability formula (2013–2025): Scores from 2013 through 2025 are on the 150-point scale. 2025 is the final year on this formula. Details

No scores issued (2020–2020): LDOE did not issue School Performance Scores for 2019-20 because of COVID-19 testing waivers. Details

Grow. Achieve. Thrive. formula (2026–present): New accountability system adopted by BESE in June 2024; first official scores released in 2026. Not comparable with earlier years. Details

2013: No file for this year on the LDOE performance-scores page

2017: No file for this year on the LDOE performance-scores page

2020: No file for this year on the LDOE performance-scores page

LEAP: percent Mastery or aboveBack to top

The share of students who scored at grade level or better (Mastery or Advanced) on the state LEAP tests. No LEAP tests were given in spring 2020. Small groups are suppressed by the state.

42% latest published value, 2025-26 · Source: 2026 School LEAP Mastery Summary

LEAP: percent Mastery or above by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
LEAP: percent Mastery or above by period with source
PeriodLEAP: percent Mastery or aboveSource
2025-26 42% 2026 School LEAP Mastery Summary
2024-25 42% 2025 School LEAP 2025 Mastery Summary
2023-24 35% 2024 School LEAP 2025 Mastery Summary
2022-23 39% 2023 School LEAP 2025 Mastery Summary
2021-22 41% 2022 School LEAP 2025 Mastery Summary
2020-21 39% 2021 School LEAP 2025 Mastery Summary
2018-19 43% subjects: ELA, Math and Social Studies 2019 School LEAP 2025 Mastery Summary
2017-18 41% from the 2019 file's prior-year column; subjects: ELA, Math and Social Studies 2019 School LEAP 2025 Mastery Summary

Attendance rateBack to top

Of all the days students were enrolled, the share on which they were present. It counts days, not students. A high attendance rate can still hide students who miss many days each; chronic absenteeism counts those students. Values the state prints as a range (for example >95.0) are shown as suppressed.

92.9% latest published value, 2025-26 · Source: 2025-2026 School-District-State Student Attendance Rates

Chronic absenteeismBack to top

The share of students who missed 10% or more of the days they were enrolled (about 18 days in a full year), for any reason, excused or not. It counts students, not days. The state notes a change in how it counts chronic absenteeism to match federal reporting; each year's file states the definition it used, so compare years with care.

23.7% latest published value, 2025-26 · Source: 2025-2026 Chronic Absenteeism Rate Overall & by Subgroup

Chronic absenteeism by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Truancy rateBack to top

The share of students the school reported as truant under Louisiana law, which counts a student as truant after five unexcused absences or tardies in a semester. Counts students, not days. Truancy is reported by each school, so practices can differ between schools and years.

15.3% latest published value, 2025-26 · Source: 2025-2026 State District School Student Truancy Rates

Truancy rate by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Truancy rate by period with source
PeriodTruancy rateSource
2025-26 15.3% 70 students counted as truant 2025-2026 State District School Student Truancy Rates
2024-25 16.5% 77 students counted as truant 2024-2025 State District School Student Truancy Rates
2023-24 17.3% 78 students counted as truant 2023-2024 School District State Student Truancy Rates
2022-23 19.6% 88 students counted as truant 2022-2023 School District State Student Truancy Rates
2021-22 31.6% 139 students counted as truant 2021-2022 School-District-State Student Truancy Rates
2020-21 23.9% 111 students counted as truant 2020-2021 School-District-State Student Truancy Rates
2019-20 17.6% 83 students counted as truant 2019-2020 School-District-State Student Truancy Rates
2018-19 29.5% 145 students counted as truant 2018-2019 School-District-State Student Truancy Rates
2017-18 53.1% 268 students counted as truant 2017-2018 School-District-State Student Truancy Rates
2016-17 27.6% 136 students counted as truant 2016-2017 School-District-State Student Truancy Rates
2015-16 18.5% 92 students counted as truant 2015-2016 School-District-State Student Truancy Rates
2014-15 16.7% 79 students counted as truant 2013-2015 School-District-State Student Truancy Rates
2013-14 13.7% 68 students counted as truant 2013-2015 School-District-State Student Truancy Rates

In-school suspensionsBack to top

The share of the school's students who received an in-school suspension during the year. The state counts students, not incidents; the number of students is shown with each value. The state suppresses small counts (shown as suppressed, never as zero). A student suspended several times counts once.

0.7% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

In-school suspensions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
In-school suspensions by period with source
PeriodIn-school suspensionsSource
2024-25 0.7% 4 students of 538 enrolled 2024-2025 School District State Discipline Rates
2023-24 1.1% 6 students of 523 enrolled 2023-2024 School District State Discipline Rates
2022-23 0.2% 1 students of 528 enrolled 2022-2023 School District State Discipline Rates
2021-22 0.6% 3 students of 491 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 0.2% 1 students of 532 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 1.1% 6 students of 541 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 0.5% 3 students of 572 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 2.3% 13 students of 556 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 1.6% 9 students of 578 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 2.7% 15 students of 562 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as <5%; count reported as ≥10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as <5%; count reported as ≥10 2013-2014 School-District-State Discipline Rates

Out-of-school suspensionsBack to top

The share of the school's students who received an out-of-school suspension during the year. Students, not incidents. The state suppresses small counts (shown as suppressed, never as zero). A student suspended several times counts once.

2.8% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

Out-of-school suspensions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Out-of-school suspensions by period with source
PeriodOut-of-school suspensionsSource
2024-25 2.8% 15 students of 538 enrolled 2024-2025 School District State Discipline Rates
2023-24 2.9% 15 students of 523 enrolled 2023-2024 School District State Discipline Rates
2022-23 2.8% 15 students of 528 enrolled 2022-2023 School District State Discipline Rates
2021-22 3.3% 16 students of 491 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 1.3% 7 students of 532 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 1.9% 10 students of 541 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 1.6% 9 students of 572 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 2.0% 11 students of 556 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 1.9% 11 students of 578 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 4.3% 24 students of 562 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 5.2% count reported as ≥20 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as <5%; count reported as ≥20 2013-2014 School-District-State Discipline Rates

In-school expulsionsBack to top

The share of the school's students expelled to an in-school setting during the year. Students, not incidents. Small counts are suppressed by the state. Most schools report zero or very few.

0% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

In-school expulsions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
In-school expulsions by period with source
PeriodIn-school expulsionsSource
2024-25 0% 0 students of 538 enrolled 2024-2025 School District State Discipline Rates
2023-24 0% 0 students of 523 enrolled 2023-2024 School District State Discipline Rates
2022-23 0% 0 students of 528 enrolled 2022-2023 School District State Discipline Rates
2021-22 0% 0 students of 491 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 0% 0 students of 532 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 0% 0 students of 541 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 0% 0 students of 572 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 0% 0 students of 556 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 0% 0 students of 578 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 0% 0 students of 562 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as ~; count reported as <10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as ~; count reported as <10 2013-2014 School-District-State Discipline Rates

2013-14: Reported by the state as ~; count reported as <10

2014-15: Reported by the state as ~; count reported as <10

Out-of-school expulsionsBack to top

The share of the school's students expelled from school during the year. Students, not incidents. Small counts are suppressed by the state. Most schools report zero or very few.

0% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

Out-of-school expulsions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Out-of-school expulsions by period with source
PeriodOut-of-school expulsionsSource
2024-25 0% 0 students of 538 enrolled 2024-2025 School District State Discipline Rates
2023-24 0% 0 students of 523 enrolled 2023-2024 School District State Discipline Rates
2022-23 0% 0 students of 528 enrolled 2022-2023 School District State Discipline Rates
2021-22 0% 0 students of 491 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 0% 0 students of 532 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 0% 0 students of 541 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 0% 0 students of 572 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 0% 0 students of 556 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 0% 0 students of 578 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 0% 0 students of 562 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as ~; count reported as <10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as ~; count reported as <10 2013-2014 School-District-State Discipline Rates

2013-14: Reported by the state as ~; count reported as <10

2014-15: Reported by the state as ~; count reported as <10

Classes with 20 or fewer studentsBack to top

Of all the classes the school reported, the share with 20 students or fewer. This is about actual classrooms, which a student-to-teacher ratio does not show. The state counts class sections of every kind, so small electives and large lectures weigh the same.

54.5% latest published value, 2025-26 · Source: 2025-2026 School-District-State Class Size Summary

Classes with 20 or fewer students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Classes with 20 or fewer students by period with source
PeriodClasses with 20 or fewer studentsSource
2025-26 54.5% 91 classes of 167 classes 2025-2026 School-District-State Class Size Summary
2024-25 50.9% 86 classes of 169 classes 2024-2025 School-District-State Class Size Summary
2023-24 63.0% 97 classes of 154 classes 2023-2024 School-District-State Class Size Summary
2022-23 75% 114 classes of 152 classes 2022-2023 School-District-State Class Size Summary
2021-22 87.2% 122 classes of 140 classes 2021-2022 School-District-State Class Size Summary
2020-21 94.2% 227 classes of 241 classes 2020-2021 School-District-State Class Size Summary
2019-20 43.5% 60 classes of 138 classes 2019-2020 School-District-State Class Size Summary
2018-19 46.9% 61 classes of 130 classes 2018-2019 School-District-State Class Size Summary
2017-18 55.9% 81 classes of 145 classes 2007-2017 School-District-State Class Size Summary
2016-17 77.3% 129 classes of 167 classes 2007-2017 School-District-State Class Size Summary
2015-16 74.5% 123 classes of 165 classes 2007-2017 School-District-State Class Size Summary
2014-15 72.8% 118 classes of 162 classes 2007-2017 School-District-State Class Size Summary
2013-14 71.5% 123 classes of 172 classes 2007-2017 School-District-State Class Size Summary

Classes with 27 or more studentsBack to top

Of all the classes the school reported, the share with 27 students or more (the state's 27-33 and 34-plus ranges added together). The state counts class sections of every kind. Louisiana sets class-size limits by grade, so a large class is not always out of line.

3.6% latest published value, 2024-25 · Source: 2024-2025 School-District-State Class Size Summary

Classes with 27 or more students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Classes with 27 or more students by period with source
PeriodClasses with 27 or more studentsSource
2024-25 3.6% 6 classes of 169 classes 2024-2025 School-District-State Class Size Summary
2023-24 3.3% 5 classes of 154 classes 2023-2024 School-District-State Class Size Summary
2022-23 2.6% 4 classes of 152 classes 2022-2023 School-District-State Class Size Summary
2019-20 1.5% 2 classes of 138 classes 2019-2020 School-District-State Class Size Summary
2018-19 1.5% 2 classes of 130 classes 2018-2019 School-District-State Class Size Summary
2017-18 4.1% 6 classes of 145 classes 2007-2017 School-District-State Class Size Summary
2016-17 4.2% 7 classes of 167 classes 2007-2017 School-District-State Class Size Summary
2015-16 4.2% 7 classes of 165 classes 2007-2017 School-District-State Class Size Summary
2014-15 3.7% 6 classes of 162 classes 2007-2017 School-District-State Class Size Summary
2013-14 2.9% 5 classes of 172 classes 2007-2017 School-District-State Class Size Summary

Teachers (full-time equivalent)Back to top

How many teachers the school had, counted in full-time equivalents: two half-time teachers count as one. Teachers only; principals, aides and other staff are not counted. The state added this column in later files, so earlier years have no count.

30.1 teachers latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Teachers (full-time equivalent) by period

Chart loads with JavaScript; the table has every value.

Teachers (full-time equivalent) by period with source
PeriodTeachers (full-time equivalent)Source
2022-23 30.1 teachers Full-time equivalent (FTE) teachers as reported by the state 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2021-22 28 teachers Full-time equivalent (FTE) teachers as reported by the state 2021-2022 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2020-21 27.6 teachers Full-time equivalent (FTE) teachers as reported by the state 2020-2021 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2019-20 27.4 teachers Full-time equivalent (FTE) teachers as reported by the state 2019-2020 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Students per teacher (calculated)Back to top

How many students the school had for each full-time teacher. Both numbers it is worked out from are shown with each value. This is not average class size: teachers of special education, intervention, electives and other small groups count as teachers, so actual classes are usually larger. See the class size measures for actual classrooms.

16.2 students per teacher latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Students per teacher (calculated) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
Students per teacher (calculated) by period with source
PeriodStudents per teacher (calculated)Source
2022-23 16.2 students per teacher Calculated: 488 students (October 1 count) ÷ 30.1 teacher FTE. This is not average class size. 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2021-22 16.3 students per teacher Calculated: 456 students (October 1 count) ÷ 28.0 teacher FTE. This is not average class size. 2021-2022 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2020-21 17.9 students per teacher Calculated: 493 students (October 1 count) ÷ 27.6 teacher FTE. This is not average class size. 2020-2021 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2019-20 19.1 students per teacher Calculated: 523 students (October 1 count) ÷ 27.4 teacher FTE. This is not average class size. 2019-2020 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Inexperienced teachersBack to top

The share of the school's teaching staff the state counts as inexperienced (in their first years of teaching). Defined by the state under federal reporting rules. Shown only for years whose file gives a total teacher count.

14.9% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Inexperienced teachers by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Out-of-field teachersBack to top

The share of the school's teaching that is done by teachers not certified in the subject or grade they teach. Defined by the state under federal reporting rules. A teacher can be out of field for one class and in field for the rest.

23.2% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Out-of-field teachers by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Teachers on emergency or provisional credentialsBack to top

The share of the school's teaching staff working on a temporary emergency or provisional credential rather than a full certificate. Defined by the state under federal reporting rules. Shown only for years whose file gives a total teacher count.

5.4% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Teachers on emergency or provisional credentials by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Economically disadvantaged studentsBack to top

The share of the school's students the state counts as economically disadvantaged (for example, eligible for free meals or other aid programs). As published by the state for the October 1 count.

54.7% latest published value, 2025-26 · Source: Oct 2025 Multi Stats (Total by Site and School System) web

Economically disadvantaged students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

English learnersBack to top

The share of the school's students still learning English. As published by the state for the October 1 count.

0.6% latest published value, 2025-26 · Source: Oct 2025 Multi Stats (Total by Site and School System) web

English learners by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

2014-15: Reported by the state as <5%

2015-16: Reported by the state as <5%

Students with disabilitiesBack to top

The share of the school's students who have an Individualized Education Program (IEP) for a disability. Gifted and talented students are not included. Rates above 95% or very small counts are printed by the state as a range and shown as suppressed.

14.5% latest published value, 2025-26 · Source: 2025 Oct SWD Rates by LEA & Site_PUBLIC

Students with disabilities by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

2018-19: Not published

2019-20: Not published

2020-21: Not published

K–3 reading on grade level (start of year)Back to top

Of the kindergarten to 3rd-grade students screened at the start of the school year, the share reading on or above grade level. Start-of-year and end-of-year results are separate measures and should not be compared with each other. The state's school-level files begin with fall 2022; earlier years are only in PDF reports.

42.4% latest published value, 2025-26 · Source: 2025-2026 EOY K-3 Literacy Regular Screener Results

K–3 reading on grade level (start of year) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
K–3 reading on grade level (start of year) by period with source
PeriodK–3 reading on grade level (start of year)Source
2025-26 42.4% 2025-2026 EOY K-3 Literacy Regular Screener Results
2024-25 46% 2025 Spring K-3 Literacy Screener Results
2022-23 53% 2022-2023 Fall Literacy Report, by State, LEA, Site and Subgroup

K–3 reading on grade level (end of year)Back to top

Of the kindergarten to 3rd-grade students screened at the end of the school year, the share reading on or above grade level. Start-of-year and end-of-year results are separate measures and should not be compared with each other.

69.1% latest published value, 2025-26 · Source: 2025-2026 EOY K-3 Literacy Regular Screener Results

K–3 reading on grade level (end of year) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
K–3 reading on grade level (end of year) by period with source
PeriodK–3 reading on grade level (end of year)Source
2025-26 69.1% 2025-2026 EOY K-3 Literacy Regular Screener Results
2024-25 67.6% 2025 Spring K-3 Literacy Screener Results
2023-24 50.7% 2024 Spring k-3 Literacy Screener Results

Spending per studentBack to top

How much was spent per student at this school in the fiscal year, including a share of central-office costs. Fiscal years run July 1 to June 30. Schools differ in size, grade levels and special programs, so compare with care.

$14,125 latest published value, 2023-24 · Source: 2023-2024 Per Pupil Expenditure Data

Spending per student by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
Spending per student by period with source
PeriodSpending per studentSource
2023-24 $14,125 2023-2024 Per Pupil Expenditure Data
2022-23 $13,826 2022-2023 Per Pupil Expenditure Data
2021-22 $13,095 2021-2022 Per Pupil Expenditure Data
2020-21 $11,843 2020-2021 Per Pupil Expenditure Data
2019-20 $10,381 2019-2020 Per Pupil Expenditure Data
2018-19 $10,270 2018-2019 Per Pupil Expenditure Data
2017-18 $9,742 2017-2018 Per Pupil Expenditure Data
2016-17 $10,266 2016-2017 Per Pupil Expenditure Data

Students by grade, 2025-26Back to top

The state's October 1 count for the latest year on file. Grades the school does not serve are left out. · Source: Oct 2025 Multi Stats (Total by Site and School System) web

Students by grade, 2025-26
GradeStudents
Pre-school (special ed.) 8
Pre-K 57
Kindergarten 90
Grade 1 75
Grade 2 77
Grade 3 59
Grade 4 61
Grade 5 68

Facilities, maintenance & improvementsBack to top

Repairs, replacements, service contracts and purchases for this school that the school board approved, from its own agendas and minutes. Each line shows the amount as the board printed it, the vendor, the account it was to be paid from, and the board's decision, with a link to the document.

Board-approved amounts by year

Board-approved facility amounts by fiscal year
Fiscal yearItemsMaintenance, repairs & purchasesConstruction
2026-272 $17,425
1 not added (change orders, ceilings, updates)
—
2025-263 $91,168
1 not added (change orders, ceilings, updates)
—
2024-252 $33,530
1 not added (change orders, ceilings, updates)
—
2023-244 $102,469 —
2022-232 $43,976 —
2021-221 $12,355 —
2019-201 $11,984 —
2018-191 $24,360 —

About these figures. These records are extracted automatically from the board's published agendas and minutes, which are PDF documents written for reading, not for data. Each item is matched to a school, an amount, a vendor and an account by fixed text patterns, and some items may be misread, assigned to the wrong school, or missed. Each amount is shown as printed in the source document, which is linked on every line; check the original before relying on a figure. The yearly totals add only the items found and read this way, so they are incomplete and are not a full accounting of spending at any school. If you find an error, please let us know.

Board-approved amounts are not actual spending. Routine custodial work, utilities and small repairs never come to the board, and an approved quote is not proof of what was finally paid. Change orders, not-to-exceed ceilings and updates are listed below but not added.

Not published by school

School-specific maintenance expenditures have not been identified in the publicly available records reviewed. Some maintenance expenses may be reported at the district level.

  • LDOE Annual Financial Reports, 2017-18 to 2024-25: maintenance for the whole school system only.
  • LDOE per-pupil expenditure files, 2016-17 to 2023-24: by school, but with no maintenance category.
  • Act 310 school expenditure reports: by school, no maintenance line.
  • The board's adopted budget: one district-wide "Plant Maintenance & Operations" line; the ward maintenance accounts the items below draw on are budgeted by ward, not by school.

District-wide, not this school's 2024-25: $10,442,619 for all buildings, $1,975 per student (Louisiana $1,881). Year by year

Board actions naming this school

Facility actions approved by the school board
Meeting WhatWorkAmountPaid fromDecision
Nov 19, 2026
Regular meeting · FY 2026-27
also on Nov 17, 2026
Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1.1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 — Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41 — Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previous orders was $834,462.00 The Contract Sum prior to this Change Order was $5,533,462.00 The Contract Sum will be increased by $67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

Source: Nov 26 Board Agenda.pdf · item VI.1.1
Construction & change orders
Change order
$67,134
Increase to the contract sum
Also named: $50,744, $0, $16,390
Not stated in the item Not recorded
Sep 17, 2026
Regular meeting · FY 2026-27
also on Sep 15, 2026
WES purchase of AC system for auditorium
Vendor: Acme AC
Full text

A.3. WES purchase of AC system for auditorium e Grant permission to WES to purchase a 15 ton Trane air conditioning system for the auditorium from Acme AC at a cost of $17,425.00 (includes $2,000.00 sheet metal — work). Other quotes receive from Butcher $20,955.00 (no sheet metal work) and Solar 15 $21,261.00/$23,461.00 with sheet metal work. To be paid from CSD #1 Maintenance. Motion: Second: Public Discussion: Board Discussion: Vote:

Source: Sept 26 Board Agenda.pdf · item VI.A.3
HVAC / air conditioning
Quote accepted
$17,425
Accepted quote
Also named: $2,000, $20,955, $21,261
CSD #1 Maintenance
Ward maintenance district funds
Approved
unanimously approved
May 21, 2026
Regular meeting · FY 2025-26
also on May 19, 2026
Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project.
Vendor: Build Back Ramps and Sidewalks
Full text

Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project. Description: Change Order #2 – Trahan Construction will provide labor and equipment required for the following: - COR #10 – Data and Outlet Revisions at Classrooms. $26,35.00 - COR #14 – Additional Exterior Cameras. $13,120.00 - COR #15 – Provide Access Control at WES West Entrance at Circle Drive. $10,069.00 - COR #16 – Provide Wiring to separate existing camera system from overall school network. $6,568.00 - COR #21 – Related to RFP 3 – Demolition of Existing Brown Hall and Associated Build Back including Ramps and Sidewalks. $237,373.00 - COR #22 – Related to RFP 3 – Aluminum Canopy Associated with Build Back Ramps and Sidewalks. $121,893.00 - COR #23 – Related to RFP 3 – Welsh Elementary Secure Vestibule with Access Control & Fortification. $151,221.00 Details: Change Order #2 for $566,596.00 and adding days: 80 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 267,866.00 The Contract Sum prior to this Change Order $4,966,866.00 The Contract Sum will be increased by $ 566,596.00 The new Contract Sum including this Change Order will be $5,533,462.00 The Contract Time will be increased by eighty ( 80 ) days The new date of Substantial Completion will be November 22, 2026

Source: Agenda May 26.pdf · item VI.A.7
Construction & change orders
Change order
$566,596
Increase to the contract sum
Also named: $26, $13,120, $10,069
Not stated in the item Not recorded
Aug 19, 2025
Finance/Salary committee · FY 2025-26
District-wide item
Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish
Full text

12. Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish School Board Hurricane Laura Damages Restoration Program JDPSB- EES, EHS, FES, WES, WHS WRJHS Description: Change Order #3 – Labor Credit for FES Translucent Roofing/Roof Hung Light Fixtures Bid Changes as follows: The Original Contract Sum was $1,799,000.00 The net change by previously orders $- 147,578.00 Contract Sum Prior to this Change Order $1,651,422.00 Contract Sum will be decreased by $ 1,269.00 The new Contract Sum $1,650,153.00 Contract Time will be unchanged Revised Contract Completion Date August 16, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: Finance August 25.pdf · item V.12
Construction & change orders
Change order
$1,269
Decrease to the contract sum
Also named: $1,799,000, $1,651,422, $1,650,153
Not stated in the item Committee item
Jul 15, 2025
Finance/Salary committee · FY 2025-26
Grant permission to repair the roof at WES. Three quotes were received for
Vendor: Bison Coatings & Foams LLC
Full text

7. Grant permission to repair the roof at WES. Three quotes were received for Welsh Elementary main building flat roof coating project which included Louisiana Roof Coatings, Bison Coatings & Foams LLC, and Premier Service Team LLC. All three companies have been on site to gather information for quotes. Louisiana Roof Coating quoted $52,400 with a 10-year manufacturer’s warranty for material and labor. Bison Coatings and Foam LLC quoted $28,045.60 with a 20-year manufacturer’s warranty on material and 2-year labor warranty by contractor. Premier Service Team quoted $59,970 with a 12-year labor and material warranty. Due to the lowest quote and longest warranty, we recommend going with Bison Coatings & Foams LLC. To be paid from the General Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: Finance July 25.pdf · item V.7
Roofing
Quote accepted
$52,400
Accepted quote
Also named: $28,045.60, $59,970
General Fund
General Fund
Committee item
Jul 15, 2025
Finance/Salary committee · FY 2025-26
Grant permission to WES to purchase 2 pieces of playground equipment to
Vendor: Struthers Recreation L.L.C
Full text

9. Grant permission to WES to purchase 2 pieces of playground equipment to replace existing equipment that is damaged and no longer safe to be used from GameTime Playcore Company under state contract # 4400017443. The Deschutes Unit and Discovery Cave will also be installed by Struthers Recreation L.L.C. The total price is $ 38,767.64. To be paid from Welsh CSD Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: Finance July 25.pdf · item V.9
Grounds, fields & pest control
Purchase
$38,767.64
Board-approved amount
Welsh CSD Contingency
Other / as stated
Committee item
Feb 18, 2025
Finance/Salary committee · FY 2024-25
Grant permission to declare an emergency at WES to replace the roof.
Full text

8.5. Grant permission to declare an emergency at WES to replace the roof. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: Finance Feb 25.pdf · item V.8.5
Roofing
Emergency repair
No figure printed Not stated in the item Committee item
Jul 18, 2024
Regular meeting · FY 2024-25
also on Jul 16, 2024
On March 21, 2024, WES was granted permission to purchase
Vendor: Sylvan Special Systems
Full text

A.6. On March 21, 2024, WES was granted permission to purchase on state contract from United Automation replacement and additional security cameras at a cost of $33,529.93 and was to be paid from WES Maintenance funds. WES is asking that this previous approval be rescinded due to the software not being available as originally planned and seeking approval to purchase additional security cameras on state contract (#310082937) from Sylvan Special Systems at a cost of $54,991.00. Other quote from United Automation ($95,735.00 - State contact #4400028681). To be paid from CSD #1 Contingency Funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: July 2024 Board Agenda addendum.pdf · item VII.A.6
Security, cameras & doors
Quote accepted
$33,529.93
Accepted quote
Also named: $54,991, $95,735
WES Maintenance funds
Ward maintenance district funds
Not recorded
Jun 13, 2024
Regular meeting · FY 2023-24
also on Jun 11, 2024
Grant permission to WES to accept the quote of $13,244.00 from
Vendor: Better Home Insulation
Full text

A.11. Grant permission to WES to accept the quote of $13,244.00 from Better Home Insulation to install spray foam on the top half of the gymnasium wall. Other quotes received from Radar’s Insulation ($35,550.00) and Harding Spray Foam ($17,000.00). To be paid from WES Maintenance funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: June 2024 Board Agenda addendum.pdf · item VII.A.11
Building repairs, paint & floors
Quote accepted
$13,244
Accepted quote
Also named: $35,550, $17,000
WES Maintenance funds
Ward maintenance district funds
Not recorded
Mar 21, 2024
Regular meeting · FY 2023-24
also on Mar 19, 2024
Grant permission to Welsh Elementary School to purchase on state contract from United Automation for replacement and additional security cameras at a cost of $33,529.93.
Vendor: United Automation
Full text

Grant permission to Welsh Elementary School to purchase on state contract from United Automation for replacement and additional security cameras at a cost of $33,529.93. To be paid from WES Maintenance funds.

Source: March 2024 Board Agenda addendum.pdf · item VII.G.1.7
Security, cameras & doors
Purchase
$33,529.93
Board-approved amount
WES Maintenance funds
Ward maintenance district funds
Not recorded
Dec 14, 2023
Regular meeting · FY 2023-24
also on Dec 12, 2023
Grant permission to WES to accept the State Contract quote of
Vendor: Insight Incorporated
Full text

A.5. Grant permission to WES to accept the State Contract quote of $29,100.00 from Insight Incorporated to install new bleachers for the gym. To be paid from CSD Contingency Funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: December Board Agenda Addendum 2023.pdf · item VIII.A.5
Building repairs, paint & floors
Quote accepted
$29,100
Accepted quote
CSD Contingency Funds
Other / as stated
Not recorded
Aug 15, 2023
Finance/Salary committee · FY 2023-24
Grant permission to WES to accept the quote of $26,595.00 from Office
Vendor: Office Centre-Teacher’s Pet
Full text

3. Grant permission to WES to accept the quote of $26,595.00 from Office Centre-Teacher’s Pet to purchase and install new 2nd grade playground equipment. Other quotes received from Planet Recess ($39,169.14/$43,466.14) and HAHN Enterprises ($48,158.00). To be paid from CSD Contingency #1 funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: August Finance 2023.pdf · item IV.3
Grounds, fields & pest control
Quote accepted
$26,595
Accepted quote
Also named: $39,169.14, $43,466.14, $48,158
CSD Contingency #1 funds
Other / as stated
Committee item
May 9, 2023
Finance/Salary committee · FY 2022-23
Grant permission to WES to accept the quote of $23,258.00 from Office
Vendor: Office Centre-Teacher’s Pet
Full text

3. Grant permission to WES to accept the quote of $23,258.00 from Office Centre-Teacher’s Pet to install new curtains in the auditorium. Other quote received from Texas Scenic ($32,546.00). Other quote sought from Georgia Stage but they are not able to complete the service required. To be paid from CSD #1 Maintenance. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: May Finance 2023.pdf · item IV.3
Building repairs, paint & floors
Quote accepted
$23,258
Accepted quote
Also named: $32,546
CSD #1 Maintenance
Ward maintenance district funds
Committee item
Jul 21, 2022
Regular meeting · FY 2022-23
also on Jul 19, 2022
Grant permission to WES to add additional security cameras and to accept the quote from Sylvan Systems of $20,718.00.
Vendor: CTI Security Solutions
Full text

Grant permission to WES to add additional security cameras and to accept the quote from Sylvan Systems of $20,718.00. Other quote received from CTI Security Solutions ($24,092.18). Another quote solicited from Louisiana Special Systems, but not submitted. To be paid from CSD Contingency #1.

Source: July 2022 Board Agenda Addendum.pdf · item VII.A.3
Security, cameras & doors
Quote accepted
$20,718
Accepted quote
Also named: $24,092.18
CSD Contingency #1
Other / as stated
Not recorded
Aug 19, 2021
Regular meeting · FY 2021-22
also on Aug 17, 2021
Grant permission to WES to purchase on state contract (3) 75”
Full text

A.1. Grant permission to WES to purchase on state contract (3) 75” Newline TruTouch Panels with wall mounts and software and (1) 65” Newline TruTouch portable panel with stand for a total cost of $12,355.00. To be paid from CSD Maintenance #1. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: August 2021 Board Agenda Addendum.pdf · item VII.A.1
Equipment & technology bought from maintenance funds
Purchase
$12,355
Board-approved amount
CSD Maintenance #1
Ward maintenance district funds
Not recorded
Jan 16, 2020
Regular meeting · FY 2019-20
also on Jan 14, 2020
Grant permission to WES to purchase a new intercom system and accept the $11,984.00 quote from Sylvan Special Systems.
Vendor: Sylvan Special Systems
Full text

Grant permission to WES to purchase a new intercom system and accept the $11,984.00 quote from Sylvan Special Systems. Other quotes received from Louisiana Special Systems $15,915.00 and Dacsis $34,175.00.

Source: January 2020 Board Agenda Addendum.pdf · item VI.A.4
Security, cameras & doors
Quote accepted
$11,984
Accepted quote
Also named: $15,915, $34,175
Not stated in the item Not recorded
Jun 20, 2019
Regular meeting · FY 2018-19
Grant permission to WES to purchase on state contract (8) 75” Newline Tru
Full text

10. Grant permission to WES to purchase on state contract (8) 75” Newline Tru Touch panels with wall mounts from Troxell at a cost of $24,360.00. These will replace outdated white boards. To be paid from WES 2018-2019 CSD Maintenance #1 funds. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: June 2019 Agenda Addendum.pdf · item VI.10
Equipment & technology bought from maintenance funds
Purchase
$24,360
Board-approved amount
WES 2018-2019 CSD Maintenance #1 funds
Ward maintenance district funds
Not recorded

One record per decision: an item that appeared on a committee agenda and then the board agenda is listed once, from the board meeting. All schools' facility records, with filters.

Construction & capital projects at this schoolBack to top

Bids, contracts, change orders and construction updates that came before the school board and name this school, from the board's own agendas and minutes. Amounts are shown exactly as printed and are not added together; a change order's figure is often a new contract total. Committee items have no outcome because the full board decides.

Other construction and facility items 8 items naming this school (of 151 in the project), Feb 18, 2025 to Nov 19, 2026

Other construction and facility items: board items
MeetingTypeItemAmounts namedOutcome
Nov 19, 2026
Regular meeting
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1.1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 — Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41 — Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previous orders was $834,462.00 The Contract Sum prior to this Change Order was $5,533,462.00 The Contract Sum will be increased by $67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Not recorded
Nov 17, 2026
Finance committee
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 - Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41- Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 834,462.00 The Contract Sum prior to this Change Order $5,533,462.00 The Contract Sum will be increased by $ 67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Committee item
Nov 17, 2026
Finance committee
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1.1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 - Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41- Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 834,462.00 The Contract Sum prior to this Change Order $5,533,462.00 The Contract Sum will be increased by $ 67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: 1 Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Committee item
May 21, 2026
Regular meeting
Change order Consideration to grant permission to accept Change Order No. 2 on
Full text

A.7. Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project. Description: Change Order #2 – Trahan Construction will provide labor and equipment required for the following: - COR #10 – Data and Outlet Revisions at Classrooms. $26,35.00 - COR #14 – Additional Exterior Cameras. $13,120.00 - COR #15 – Provide Access Control at WES West Entrance at Circle Drive. $10,069.00 - COR #16 – Provide Wiring to separate existing camera system from overall school network. $6,568.00 - COR #21 – Related to RFP 3 – Demolition of Existing Brown Hall and Associated Build Back including Ramps and Sidewalks. $237,373.00 - COR #22 – Related to RFP 3 – Aluminum Canopy Associated with Build Back Ramps and Sidewalks. $121,893.00 - COR #23 – Related to RFP 3 – Welsh Elementary Secure Vestibule with Access Control & Fortification. $151,221.00 Details: Change Order #2 for $566,596.00 and adding days: 80 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 267,866.00 The Contract Sum prior to this Change Order $4,966,866.00 The Contract Sum will be increased by $ 566,596.00 The new Contrac

$26
$13,120.00
$10,069.00
$6,568.00
$237,373.00
$121,893.00
Not recorded
May 19, 2026
Finance/Salary committee
Change order Consideration to grant permission to accept Change Order No. 2 on the JDPSB –
Full text

7. Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project. Description: Change Order #2 – Trahan Construction will provide labor and equipment required for the following: - COR #10 – Data and Outlet Revisions at Classrooms. $26,35.00 - COR #14 – Additional Exterior Cameras. $13,120.00 - COR #15 – Provide Access Control at WES West Entrance at Circle Drive. $10,069.00 - COR #16 – Provide Wiring to separate existing camera system from overall school network. $6,568.00 - COR #21 – Related to RFP 3 – Demolition of Existing Brown Hall and Associated Build Back including Ramps and Sidewalks. $237,373.00 - COR #22 – Related to RFP 3 – Aluminum Canopy Associated with Build Back Ramps and Sidewalks. $121,893.00 - COR #23 – Related to RFP 3 – Welsh Elementary Secure Vestibule with Access Control & Fortification. $151,221.00 Details: Change Order #2 for $566,596.00 and adding days: 80 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 267,866.00 The Contract Sum prior to this Change Order $4,966,866.00 The Contract Sum will be increased by $ 566,596.00 The new Contract

$26
$13,120.00
$10,069.00
$6,568.00
$237,373.00
$121,893.00
Committee item
Aug 19, 2025
Finance/Salary committee
Change order Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish
Full text

12. Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish School Board Hurricane Laura Damages Restoration Program JDPSB- EES, EHS, FES, WES, WHS WRJHS Description: Change Order #3 – Labor Credit for FES Translucent Roofing/Roof Hung Light Fixtures Bid Changes as follows: The Original Contract Sum was $1,799,000.00 The net change by previously orders $- 147,578.00 Contract Sum Prior to this Change Order $1,651,422.00 Contract Sum will be decreased by $ 1,269.00 The new Contract Sum $1,650,153.00 Contract Time will be unchanged Revised Contract Completion Date August 16, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$1,799,000.00
$1,651,422.00
$1,269.00
$1,650,153.00
Committee item
Jul 15, 2025
Finance/Salary committee
Quote Grant permission to repair the roof at WES. Three quotes were received for
Full text

7. Grant permission to repair the roof at WES. Three quotes were received for Welsh Elementary main building flat roof coating project which included Louisiana Roof Coatings, Bison Coatings & Foams LLC, and Premier Service Team LLC. All three companies have been on site to gather information for quotes. Louisiana Roof Coating quoted $52,400 with a 10-year manufacturer’s warranty for material and labor. Bison Coatings and Foam LLC quoted $28,045.60 with a 20-year manufacturer’s warranty on material and 2-year labor warranty by contractor. Premier Service Team quoted $59,970 with a 12-year labor and material warranty. Due to the lowest quote and longest warranty, we recommend going with Bison Coatings & Foams LLC. To be paid from the General Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$52,400
$28,045.60
$59,970
Committee item
Feb 18, 2025
Finance/Salary committee
Approval Grant permission to declare an emergency at WES to replace the roof.
Full text

8.5. Grant permission to declare an emergency at WES to replace the roof. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
All construction projects

Contracts & vendors

From the district's Act 370 reports to the state Treasury. A contract is listed for this school when the report gives the school's site code or when the contract's own description names the school or its community; contracts with no school or community named are listed as district-wide. Not every district contract may be in these reports.

—in contracts for this school only (0 contracts)
$0.00paid under this school's site code, January-June 2026

Shared and district-level contracts are listed below but are not added to this school's total, because the reports do not say what share belongs to each school.

School-specific contracts (0)

No contract in the published reports is for this school alone.

Shared contracts (4)

  • Agreement between Owner and Contractor Shared
    Trahan Construction

    Contract for wELSh School District Renovation and Additions Phase 1 bond project

    Contract maximum
    $4,966,866.00 Shared contract — each school's share is not reported
    Dates
    Jun 1, 2025 – Jun 30, 2027
    Also covers
    Welsh High School
    Why it is listed here
    The district filed this under its own code; its description names the community, not which schools, so every school there is listed.
    Paid to this vendor
    $2,268,488.67 all work, January-June 2026; the report does not tie payments to a contract
  • Agreement between Owner and Contractor Shared
    K&J Development

    Contract for Welsh School District Renovation and Additions Phase 2 bond project

    Contract maximum
    $2,944,415.00 Shared contract — each school's share is not reported
    Dates
    Jun 23, 2025 – Jun 30, 2027
    Also covers
    Welsh High School
    Why it is listed here
    The district filed this under its own code; its description names the community, not which schools, so every school there is listed.
    Paid to this vendor
    No payments reported (January-June 2026)
  • Standard Form of Agreement Between Owner and Architect Shared
    Champeaux Evans Hotard Architects

    Architectural Services - State Fee Curve - Welsh School District Renovation and Addition Project Phase 1

    Contract maximum
    $389,812.00 Shared contract — each school's share is not reported
    Dates
    Jun 1, 2025 – Jun 30, 2027
    Also covers
    Welsh High School
    Why it is listed here
    The district filed this under its own code; its description names the community, not which schools, so every school there is listed.
    Paid to this vendor
    $432,328.87 all work, January-June 2026; the report does not tie payments to a contract
  • Standard Form of Agreement Between Owner and Architect Shared
    Champeaux Evans Hotard Architects

    Architectural Services - State Fee Curve - Welsh School District Renovation and Addition Project Phase 2

    Contract maximum
    $217,406.00 Shared contract — each school's share is not reported
    Dates
    Jun 23, 2025 – Jun 30, 2027
    Also covers
    Welsh High School
    Why it is listed here
    The district filed this under its own code; its description names the community, not which schools, so every school there is listed.
    Paid to this vendor
    $432,328.87 all work, January-June 2026; the report does not tie payments to a contract

District-wide contracts (64)

Filed for the district as a whole, with no school or community named in the description. The 10 largest are shown.

  • Service Agreement District-wide
    FORECOMM SOLUTIONS

    Summer feeding program food boxes

    Contract maximum
    $1,300,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $1,328,177.70 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement District-wide
    SOUTHSIDE AUTOMOTIVE

    Maintenance and Repairs to Bus Fleet - 90 per hour labor, plus parts

    Contract maximum
    $350,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Standard Form of Agreement Between Owner and Architect District-wide
    Champeaux Evans Hotard Architects

    Architectural Services - State Fee Curve - Food Service Warehouse Project

    Contract maximum
    $253,524.00 District-level contract — individual school allocation not reported
    Dates
    Apr 1, 2026 – Dec 1, 2027
    Paid to this vendor
    $432,328.87 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement/Bid Contract District-wide
    Fleet Ritenet

    Fuel for Fleet under a 3 year agreement

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2024 – Jun 30, 2027
    Paid to this vendor
    $126,311.68 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement District-wide
    SYLVAN SPECIAL SYSTEMS

    Maintenance, Repairs and upgrades to security and fire systems

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Service Contract District-wide
    Young's Appliance

    Repairs and Maintenance on AC's throughout the district

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $63,026.30 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement/Bid Contract District-wide
    the Tree House

    Ink supply bid winner - all printer ink

    Contract maximum
    $175,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • External Auditor Contract District-wide
    Gary Lambert

    Tax Assessment and Auditing Services for Sales Tax Dept - per hour

    Contract maximum
    $150,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $122,474.36 all work, January-June 2026; the report does not tie payments to a contract
  • Service Contract District-wide
    MCNEESE STATE UNIVERSITY

    Dual Enrollment for High School Students $300-$360 per course

    Contract maximum
    $130,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Service Contract District-wide
    BISON COATINGS

    Roof Repairs and Coatings at Multiple Locations across the District

    Contract maximum
    $115,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)

All 64

Source: the district's Act 370 reports to the Louisiana Department of the Treasury (R.S. 17:88.1), reporting periods January-June 2026. Last imported Nov 12, 2026 6:08 PM; Treasury's reporting page last checked Nov 26, 2026 5:53 PM. Treasury's Act 370 page and transparency portal

Contracts & vendors for the whole district

All board items mentioning this schoolBack to top

Agenda items whose text names this school, newest first (the 50 most recent). Each links to its meeting page.

This is not the school board's website

JeffDavisEdu.com is an independent public-information website created, owned and maintained by Brandon Kelley, a candidate for the Jefferson Davis Parish School Board, District 9. It is not operated, funded or endorsed by the Jefferson Davis Parish School Board.

For official school board information, go to www.jeffersondavis.org.

Go to the official website