Jennings Elementary School

School · Grades PK–6

Weather at Jennings Elementary School

Loading the weather… Full forecast, radar & wind

Powered by WeatherDVR.com

Notices & days off

Days off come from the district's school-year calendar. Closures, early dismissals and announcements for this school appear here once they are published by the district or the school and checked. Every notice for Jennings Elementary · All district notices

Facts

Address
1603 South Lake Arthur Ave., Jennings 70546-5444
Principal
David Reed
Front office
(337) 824-4972
Grades served
PK–6
Type
Not published
LDOE site code
027009
NCES school ID
220081000569
Map
Show on the school map
School Board district
School Board District 4 or District 5 (not yet confirmed)
The campus is in voting precinct 6, which the district plan divides; the dividing line is still awaiting review.
A board member represents the residents of an election district; it does not mean the member oversees this school alone. Source: district plan adopted May 12, 2022; map.

Principal: LDOE School Directory

Front-office phone: NCES school characteristics 2021-22 (phone numbers)

Board items mentioning this school

Total enrollmentBack to top

How many students were enrolled at this school on the count day. Counts are taken twice a year; the October count is the one most reports use.

985 students latest published value, 2025-26 Feb 1 · Source: Feb 2026 Multi Stats (Total by Site and School System)

Total enrollment by period

Chart loads with JavaScript; the table has every value.

Total enrollment by period with source
PeriodTotal enrollmentSource
2025-26 Feb 1 985 students Feb 2026 Multi Stats (Total by Site and School System)
2025-26 Oct 1 976 students Oct 2025 Multi Stats (Total by Site and School System) web
2024-25 Feb 1 991 students Feb 2025 Multi Stats (Total by Site and School System)
2024-25 Oct 1 995 students Oct 2024 Multi Stats (Total by Site and School System)
2023-24 Feb 1 999 students Feb 2024 Multi Stats (Total by Site and School System)
2023-24 Oct 1 999 students Oct 2023 Multi Stats (Total by Site and School System)
2022-23 Feb 1 1,000 students Feb 2023 Multi Stats (Total by Site and School System)
2022-23 Oct 1 997 students Oct 2022 Multi Stats (Total by Site and School System)
2021-22 Feb 1 502 students Feb 2022 Multi stats (Total by Site and School System)
2021-22 Oct 1 495 students Oct 2021 Multi stats (Total by Site and School System)
2020-21 Feb 1 507 students Feb 2021 Multi stats (Total by Site and School System)
2020-21 Oct 1 505 students Oct 2020 Multi stats (Total by Site and School System)
2019-20 Feb 1 526 students Feb 2020 Multi stats (Total by Site and School System)
2019-20 Oct 1 524 students Oct 2019 Multi stats (Total by Site and School System)
2018-19 Feb 1 543 students Feb 2019 Multi stats (Total by Site and School System)
2018-19 Oct 1 531 students Oct 2018 Multi stats (Total by Site and School System)
2017-18 Feb 1 568 students Feb 2018 Multi stats (Total by Site and School System)
2017-18 Oct 1 565 students Oct 2017 Multi stats (Total by Site and School System)

School Performance ScoreBack to top

The state's overall score for the school. Higher is better. The scale changed over time, so compare only within an era. 2013-2025 use the 150-point formula; 2026 onward use the Grow. Achieve. Thrive. formula. No score was issued for 2020.

Letter grades and School Performance Scores are assigned and published by the Louisiana Department of Education. JeffDavisEdu.com shows them as published; it does not calculate or issue them.

72.8 points latest published value, 2025 · Source: 2025 School Performance Scores

School Performance Score by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
School Performance Score by period with source
PeriodSchool Performance ScoreSource
2025 72.8 points 2025 School Performance Scores
2024 73 points 2024 School Performance Scores
2023 69.8 points 2023 School Performance Scores
2022 70.6 points 2022 School Performance Scores
2021 58.8 points LDOE published a simulated score for 2021 (COVID-19 year, marked C19 in the state file); no letter grades were issued 2021 School Performance Scores
2020 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2019 65.9 points 2019 School Performance Scores
2018 65.4 points 2018 School Performance Scores
2017 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2016 69.5 points 2016 School Performance Scores
2015 69.6 points 2015 School Performance Scores
2014 79.7 points 2014 School Performance Scores
2013 Not published No file for this year on the LDOE performance-scores page LDOE page: performance

150-point accountability formula (2013–2025): Scores from 2013 through 2025 are on the 150-point scale. 2025 is the final year on this formula. Details

No scores issued (2020–2020): LDOE did not issue School Performance Scores for 2019-20 because of COVID-19 testing waivers. Details

Grow. Achieve. Thrive. formula (2026–present): New accountability system adopted by BESE in June 2024; first official scores released in 2026. Not comparable with earlier years. Details

2013: No file for this year on the LDOE performance-scores page

2017: No file for this year on the LDOE performance-scores page

2020: No file for this year on the LDOE performance-scores page

School letter gradeBack to top

The state's A-F grade for the school that year. Grade cut points differ between formula eras.

Letter grades and School Performance Scores are assigned and published by the Louisiana Department of Education. JeffDavisEdu.com shows them as published; it does not calculate or issue them.

C latest published value, 2025 · Source: 2025 School Performance Scores

School letter grade by period

Chart loads with JavaScript; the table has every value.

School letter grade by period with source
PeriodSchool letter gradeSource
2025 C 2025 School Performance Scores
2024 C 2024 School Performance Scores
2023 C 2023 School Performance Scores
2022 C 2022 School Performance Scores
2020 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2019 C 2019 School Performance Scores
2018 C 2018 School Performance Scores
2017 Not published No file for this year on the LDOE performance-scores page LDOE page: performance
2016 C 2016 School Performance Scores
2015 C 2015 School Performance Scores
2014 C 2014 School Performance Scores
2013 Not published No file for this year on the LDOE performance-scores page LDOE page: performance

150-point accountability formula (2013–2025): Scores from 2013 through 2025 are on the 150-point scale. 2025 is the final year on this formula. Details

No scores issued (2020–2020): LDOE did not issue School Performance Scores for 2019-20 because of COVID-19 testing waivers. Details

Grow. Achieve. Thrive. formula (2026–present): New accountability system adopted by BESE in June 2024; first official scores released in 2026. Not comparable with earlier years. Details

2013: No file for this year on the LDOE performance-scores page

2017: No file for this year on the LDOE performance-scores page

2020: No file for this year on the LDOE performance-scores page

LEAP: percent Mastery or aboveBack to top

The share of students who scored at grade level or better (Mastery or Advanced) on the state LEAP tests. No LEAP tests were given in spring 2020. Small groups are suppressed by the state.

29% latest published value, 2025-26 · Source: 2026 School LEAP Mastery Summary

LEAP: percent Mastery or above by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
LEAP: percent Mastery or above by period with source
PeriodLEAP: percent Mastery or aboveSource
2025-26 29% 2026 School LEAP Mastery Summary
2024-25 32% 2025 School LEAP 2025 Mastery Summary
2023-24 34% 2024 School LEAP 2025 Mastery Summary
2022-23 27% 2023 School LEAP 2025 Mastery Summary
2021-22 27% 2022 School LEAP 2025 Mastery Summary
2020-21 22% 2021 School LEAP 2025 Mastery Summary
2018-19 30% subjects: ELA, Math and Social Studies 2019 School LEAP 2025 Mastery Summary
2017-18 30% from the 2019 file's prior-year column; subjects: ELA, Math and Social Studies 2019 School LEAP 2025 Mastery Summary

Attendance rateBack to top

Of all the days students were enrolled, the share on which they were present. It counts days, not students. A high attendance rate can still hide students who miss many days each; chronic absenteeism counts those students. Values the state prints as a range (for example >95.0) are shown as suppressed.

92.9% latest published value, 2025-26 · Source: 2025-2026 School-District-State Student Attendance Rates

Chronic absenteeismBack to top

The share of students who missed 10% or more of the days they were enrolled (about 18 days in a full year), for any reason, excused or not. It counts students, not days. The state notes a change in how it counts chronic absenteeism to match federal reporting; each year's file states the definition it used, so compare years with care.

22.2% latest published value, 2025-26 · Source: 2025-2026 Chronic Absenteeism Rate Overall & by Subgroup

Chronic absenteeism by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Truancy rateBack to top

The share of students the school reported as truant under Louisiana law, which counts a student as truant after five unexcused absences or tardies in a semester. Counts students, not days. Truancy is reported by each school, so practices can differ between schools and years.

33.5% latest published value, 2025-26 · Source: 2025-2026 State District School Student Truancy Rates

Truancy rate by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Truancy rate by period with source
PeriodTruancy rateSource
2025-26 33.5% 324 students counted as truant 2025-2026 State District School Student Truancy Rates
2024-25 31.9% 315 students counted as truant 2024-2025 State District School Student Truancy Rates
2023-24 31.0% 300 students counted as truant 2023-2024 School District State Student Truancy Rates
2022-23 36.7% 366 students counted as truant 2022-2023 School District State Student Truancy Rates
2021-22 38% 206 students counted as truant 2021-2022 School-District-State Student Truancy Rates
2020-21 29.6% 172 students counted as truant 2020-2021 School-District-State Student Truancy Rates
2019-20 28.3% 166 students counted as truant 2019-2020 School-District-State Student Truancy Rates
2018-19 31.1% 188 students counted as truant 2018-2019 School-District-State Student Truancy Rates
2017-18 49.7% 307 students counted as truant 2017-2018 School-District-State Student Truancy Rates
2016-17 31.8% 201 students counted as truant 2016-2017 School-District-State Student Truancy Rates
2015-16 18.5% 117 students counted as truant 2015-2016 School-District-State Student Truancy Rates
2014-15 17.1% 106 students counted as truant 2013-2015 School-District-State Student Truancy Rates
2013-14 18.5% 114 students counted as truant 2013-2015 School-District-State Student Truancy Rates

In-school suspensionsBack to top

The share of the school's students who received an in-school suspension during the year. The state counts students, not incidents; the number of students is shown with each value. The state suppresses small counts (shown as suppressed, never as zero). A student suspended several times counts once.

5.7% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

In-school suspensions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
In-school suspensions by period with source
PeriodIn-school suspensionsSource
2024-25 5.7% 62 students of 1,095 enrolled 2024-2025 School District State Discipline Rates
2023-24 6% 66 students of 1,094 enrolled 2023-2024 School District State Discipline Rates
2022-23 6.9% 76 students of 1,108 enrolled 2022-2023 School District State Discipline Rates
2021-22 16.1% 87 students of 542 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 1.9% 11 students of 582 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 2.2% 13 students of 587 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 5.0% 30 students of 604 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 1.8% 11 students of 612 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 1.4% 9 students of 633 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 1.7% 11 students of 631 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as <5%; count reported as ≥10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as <5%; count reported as ≥20 2013-2014 School-District-State Discipline Rates

Out-of-school suspensionsBack to top

The share of the school's students who received an out-of-school suspension during the year. Students, not incidents. The state suppresses small counts (shown as suppressed, never as zero). A student suspended several times counts once.

5.6% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

Out-of-school suspensions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Out-of-school suspensions by period with source
PeriodOut-of-school suspensionsSource
2024-25 5.6% 61 students of 1,095 enrolled 2024-2025 School District State Discipline Rates
2023-24 6.6% 72 students of 1,094 enrolled 2023-2024 School District State Discipline Rates
2022-23 7.1% 79 students of 1,108 enrolled 2022-2023 School District State Discipline Rates
2021-22 12.4% 67 students of 542 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 2.4% 14 students of 582 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 4.4% 26 students of 587 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 6.6% 40 students of 604 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 13.4% 82 students of 612 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 12.5% 79 students of 633 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 18.5% 117 students of 631 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 16.5% count reported as ≥100 2014-2015 School-District-State Discipline Rates
2013-14 13.9% count reported as ≥80 2013-2014 School-District-State Discipline Rates

In-school expulsionsBack to top

The share of the school's students expelled to an in-school setting during the year. Students, not incidents. Small counts are suppressed by the state. Most schools report zero or very few.

0.2% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

In-school expulsions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
In-school expulsions by period with source
PeriodIn-school expulsionsSource
2024-25 0.2% 2 students of 1,095 enrolled 2024-2025 School District State Discipline Rates
2023-24 0.1% 1 students of 1,094 enrolled 2023-2024 School District State Discipline Rates
2022-23 0.1% 1 students of 1,108 enrolled 2022-2023 School District State Discipline Rates
2021-22 0.2% 1 students of 542 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 0% 0 students of 582 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 0.3% 2 students of 587 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 0.5% 3 students of 604 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 0.3% 2 students of 612 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 0.5% 3 students of 633 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 0.3% 2 students of 631 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as ~; count reported as <10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as ~; count reported as <10 2013-2014 School-District-State Discipline Rates

2013-14: Reported by the state as ~; count reported as <10

2014-15: Reported by the state as ~; count reported as <10

Out-of-school expulsionsBack to top

The share of the school's students expelled from school during the year. Students, not incidents. Small counts are suppressed by the state. Most schools report zero or very few.

0% latest published value, 2024-25 · Source: 2024-2025 School District State Discipline Rates

Out-of-school expulsions by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Out-of-school expulsions by period with source
PeriodOut-of-school expulsionsSource
2024-25 0% 0 students of 1,095 enrolled 2024-2025 School District State Discipline Rates
2023-24 0% 0 students of 1,094 enrolled 2023-2024 School District State Discipline Rates
2022-23 0% 0 students of 1,108 enrolled 2022-2023 School District State Discipline Rates
2021-22 0% 0 students of 542 enrolled 2021-2022 School-District-State Discipline Rates
2020-21 0% 0 students of 582 enrolled 2020-2021 School-District-State Discipline Rates
2019-20 0% 0 students of 587 enrolled 2019-2020 School-District-State Discipline Rates
2018-19 0% 0 students of 604 enrolled 2018-2019 School-District-State Discipline Rates
2017-18 0% 0 students of 612 enrolled 2017-2018 School-District-State Discipline Rates
2016-17 0% 0 students of 633 enrolled 2016-2017 School-District-State Discipline Rates
2015-16 0% 0 students of 631 enrolled 2015-2016 School-District-State Discipline Rates
2014-15 Suppressed Reported by the state as ~; count reported as <10 2014-2015 School-District-State Discipline Rates
2013-14 Suppressed Reported by the state as ~; count reported as <10 2013-2014 School-District-State Discipline Rates

2013-14: Reported by the state as ~; count reported as <10

2014-15: Reported by the state as ~; count reported as <10

Classes with 20 or fewer studentsBack to top

Of all the classes the school reported, the share with 20 students or fewer. This is about actual classrooms, which a student-to-teacher ratio does not show. The state counts class sections of every kind, so small electives and large lectures weigh the same.

61.6% latest published value, 2025-26 · Source: 2025-2026 School-District-State Class Size Summary

Classes with 20 or fewer students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Classes with 20 or fewer students by period with source
PeriodClasses with 20 or fewer studentsSource
2025-26 61.6% 236 classes of 383 classes 2025-2026 School-District-State Class Size Summary
2024-25 80.6% 299 classes of 371 classes 2024-2025 School-District-State Class Size Summary
2023-24 77.8% 291 classes of 374 classes 2023-2024 School-District-State Class Size Summary
2022-23 78.3% 296 classes of 378 classes 2022-2023 School-District-State Class Size Summary
2021-22 67.4% 159 classes of 236 classes 2021-2022 School-District-State Class Size Summary
2020-21 93.6% 335 classes of 358 classes 2020-2021 School-District-State Class Size Summary
2019-20 50.3% 97 classes of 193 classes 2019-2020 School-District-State Class Size Summary
2018-19 52.6% 120 classes of 228 classes 2018-2019 School-District-State Class Size Summary
2017-18 43.3% 77 classes of 178 classes 2007-2017 School-District-State Class Size Summary
2016-17 45.2% 104 classes of 230 classes 2007-2017 School-District-State Class Size Summary
2015-16 41.3% 100 classes of 242 classes 2007-2017 School-District-State Class Size Summary
2014-15 38.3% 98 classes of 256 classes 2007-2017 School-District-State Class Size Summary
2013-14 44.0% 113 classes of 257 classes 2007-2017 School-District-State Class Size Summary

Classes with 27 or more studentsBack to top

Of all the classes the school reported, the share with 27 students or more (the state's 27-33 and 34-plus ranges added together). The state counts class sections of every kind. Louisiana sets class-size limits by grade, so a large class is not always out of line.

1.0% latest published value, 2025-26 · Source: 2025-2026 School-District-State Class Size Summary

Classes with 27 or more students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Classes with 27 or more students by period with source
PeriodClasses with 27 or more studentsSource
2025-26 1.0% 4 classes of 383 classes 2025-2026 School-District-State Class Size Summary
2024-25 0.3% 1 classes of 371 classes 2024-2025 School-District-State Class Size Summary
2023-24 0.3% 1 classes of 374 classes 2023-2024 School-District-State Class Size Summary
2022-23 3.2% 12 classes of 378 classes 2022-2023 School-District-State Class Size Summary
2021-22 0.8% 2 classes of 236 classes 2021-2022 School-District-State Class Size Summary
2020-21 2.5% 9 classes of 358 classes 2020-2021 School-District-State Class Size Summary
2019-20 6.2% 12 classes of 193 classes 2019-2020 School-District-State Class Size Summary
2018-19 3.5% 8 classes of 228 classes 2018-2019 School-District-State Class Size Summary
2017-18 30.3% 54 classes of 178 classes 2007-2017 School-District-State Class Size Summary
2016-17 4.4% 10 classes of 230 classes 2007-2017 School-District-State Class Size Summary
2015-16 1.6% 4 classes of 242 classes 2007-2017 School-District-State Class Size Summary
2014-15 1.2% 3 classes of 256 classes 2007-2017 School-District-State Class Size Summary
2013-14 10.9% 28 classes of 257 classes 2007-2017 School-District-State Class Size Summary

Teachers (full-time equivalent)Back to top

How many teachers the school had, counted in full-time equivalents: two half-time teachers count as one. Teachers only; principals, aides and other staff are not counted. The state added this column in later files, so earlier years have no count.

66.9 teachers latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Teachers (full-time equivalent) by period

Chart loads with JavaScript; the table has every value.

Teachers (full-time equivalent) by period with source
PeriodTeachers (full-time equivalent)Source
2022-23 66.9 teachers Full-time equivalent (FTE) teachers as reported by the state 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2021-22 31.1 teachers Full-time equivalent (FTE) teachers as reported by the state 2021-2022 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2020-21 31.3 teachers Full-time equivalent (FTE) teachers as reported by the state 2020-2021 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2019-20 30.9 teachers Full-time equivalent (FTE) teachers as reported by the state 2019-2020 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Students per teacher (calculated)Back to top

How many students the school had for each full-time teacher. Both numbers it is worked out from are shown with each value. This is not average class size: teachers of special education, intervention, electives and other small groups count as teachers, so actual classes are usually larger. See the class size measures for actual classrooms.

14.9 students per teacher latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Students per teacher (calculated) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
Students per teacher (calculated) by period with source
PeriodStudents per teacher (calculated)Source
2022-23 14.9 students per teacher Calculated: 997 students (October 1 count) ÷ 66.9 teacher FTE. This is not average class size. 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2021-22 15.9 students per teacher Calculated: 495 students (October 1 count) ÷ 31.1 teacher FTE. This is not average class size. 2021-2022 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2020-21 16.1 students per teacher Calculated: 505 students (October 1 count) ÷ 31.3 teacher FTE. This is not average class size. 2020-2021 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site
2019-20 17 students per teacher Calculated: 524 students (October 1 count) ÷ 30.9 teacher FTE. This is not average class size. 2019-2020 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Inexperienced teachersBack to top

The share of the school's teaching staff the state counts as inexperienced (in their first years of teaching). Defined by the state under federal reporting rules. Shown only for years whose file gives a total teacher count.

13.1% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Inexperienced teachers by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Out-of-field teachersBack to top

The share of the school's teaching that is done by teachers not certified in the subject or grade they teach. Defined by the state under federal reporting rules. A teacher can be out of field for one class and in field for the rest.

13.3% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Out-of-field teachers by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Teachers on emergency or provisional credentialsBack to top

The share of the school's teaching staff working on a temporary emergency or provisional credential rather than a full certificate. Defined by the state under federal reporting rules. Shown only for years whose file gives a total teacher count.

10.6% latest published value, 2022-23 · Source: 2022-2023 Inexperienced Out of Field and Teachers on Emergency or Provisional Credentials by LEA Site

Teachers on emergency or provisional credentials by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

Economically disadvantaged studentsBack to top

The share of the school's students the state counts as economically disadvantaged (for example, eligible for free meals or other aid programs). As published by the state for the October 1 count.

76.8% latest published value, 2025-26 · Source: Oct 2025 Multi Stats (Total by Site and School System) web

Economically disadvantaged students by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

English learnersBack to top

The share of the school's students still learning English. As published by the state for the October 1 count.

3.3% latest published value, 2025-26 · Source: Oct 2025 Multi Stats (Total by Site and School System) web

English learners by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.

2014-15: Reported by the state as <5%

2015-16: Reported by the state as <5%

Students with disabilitiesBack to top

The share of the school's students who have an Individualized Education Program (IEP) for a disability. Gifted and talented students are not included. Rates above 95% or very small counts are printed by the state as a range and shown as suppressed.

18.8% latest published value, 2025-26 · Source: 2025 Oct SWD Rates by LEA & Site_PUBLIC

Students with disabilities by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
Students with disabilities by period with source
PeriodStudents with disabilitiesSource
2025-26 18.8% 2025 Oct SWD Rates by LEA & Site_PUBLIC
2024-25 18.9% 2024 Oct SWD Rates by LEA & Site_PUBLIC
2023-24 18.7% 2023 Oct SWD Rates by LEA & Site_PUBLIC
2022-23 18.1% 2022 Oct SWD Rates by LEA & Site_PUBLIC
2021-22 16.6% 2021 Oct SWD Rates by LEA & Site_PUBLIC
2020-21 Not published 2020 Oct SWD Rates by LEA & Site_PUBLIC
2019-20 Not published 2019 Oct SWD Rates by LEA & Site_PUBLIC
2018-19 Not published 2018 Oct SWD Rates by LEA & Site_PUBLIC
2017-18 14.3% 2017 Oct SWD Rates by LEA & Site_PUBLIC
2016-17 14.5% 2016 Oct SWD Rates by LEA & Site_PUBLIC

2018-19: Not published

2019-20: Not published

2020-21: Not published

K–3 reading on grade level (start of year)Back to top

Of the kindergarten to 3rd-grade students screened at the start of the school year, the share reading on or above grade level. Start-of-year and end-of-year results are separate measures and should not be compared with each other. The state's school-level files begin with fall 2022; earlier years are only in PDF reports.

52.7% latest published value, 2025-26 · Source: 2025-2026 EOY K-3 Literacy Regular Screener Results

K–3 reading on grade level (start of year) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
K–3 reading on grade level (start of year) by period with source
PeriodK–3 reading on grade level (start of year)Source
2025-26 52.7% 2025-2026 EOY K-3 Literacy Regular Screener Results
2024-25 47.6% 2025 Spring K-3 Literacy Screener Results
2022-23 49% 2022-2023 Fall Literacy Report, by State, LEA, Site and Subgroup

K–3 reading on grade level (end of year)Back to top

Of the kindergarten to 3rd-grade students screened at the end of the school year, the share reading on or above grade level. Start-of-year and end-of-year results are separate measures and should not be compared with each other.

62.7% latest published value, 2025-26 · Source: 2025-2026 EOY K-3 Literacy Regular Screener Results

K–3 reading on grade level (end of year) by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Dotted: Louisiana statewide. Tap a point for the values.
K–3 reading on grade level (end of year) by period with source
PeriodK–3 reading on grade level (end of year)Source
2025-26 62.7% 2025-2026 EOY K-3 Literacy Regular Screener Results
2024-25 72.6% 2025 Spring K-3 Literacy Screener Results
2023-24 60.4% 2024 Spring k-3 Literacy Screener Results

Spending per studentBack to top

How much was spent per student at this school in the fiscal year, including a share of central-office costs. Fiscal years run July 1 to June 30. Schools differ in size, grade levels and special programs, so compare with care.

$14,597 latest published value, 2023-24 · Source: 2023-2024 Per Pupil Expenditure Data

Spending per student by period

Chart loads with JavaScript; the table has every value.

Solid line: this school. Dashed: the district. Tap a point for the values.
Spending per student by period with source
PeriodSpending per studentSource
2023-24 $14,597 2023-2024 Per Pupil Expenditure Data
2022-23 $14,723 2022-2023 Per Pupil Expenditure Data
2021-22 $12,313 2021-2022 Per Pupil Expenditure Data
2020-21 $11,011 2020-2021 Per Pupil Expenditure Data
2019-20 $10,018 2019-2020 Per Pupil Expenditure Data
2018-19 $10,425 2018-2019 Per Pupil Expenditure Data
2017-18 $9,728 2017-2018 Per Pupil Expenditure Data
2016-17 $9,939 2016-2017 Per Pupil Expenditure Data

Students by grade, 2025-26Back to top

The state's October 1 count for the latest year on file. Grades the school does not serve are left out. · Source: Oct 2025 Multi Stats (Total by Site and School System) web

Students by grade, 2025-26
GradeStudents
Pre-school (special ed.) 10
Pre-K 82
Kindergarten 112
Grade 1 144
Grade 2 122
Grade 3 134
Grade 4 132
Grade 5 113
Grade 6 127

Facilities, maintenance & improvementsBack to top

Repairs, replacements, service contracts and purchases for this school that the school board approved, from its own agendas and minutes. Each line shows the amount as the board printed it, the vendor, the account it was to be paid from, and the board's decision, with a link to the document.

Board-approved amounts by year

Board-approved facility amounts by fiscal year
Fiscal yearItemsMaintenance, repairs & purchasesConstruction
2026-271 $22,943 —
2025-263 $58,069 —
2024-254 $66,531
1 not added (change orders, ceilings, updates)
—
2023-248 $12,472 $320,840
2022-239 $38,677
5 not added (change orders, ceilings, updates)
$37,508
2021-2214 $1,707,336
3 not added (change orders, ceilings, updates)
$566,269
2020-213 $47,670
1 not added (change orders, ceilings, updates)
$22,085,000
2018-193 $22,411 —

About these figures. These records are extracted automatically from the board's published agendas and minutes, which are PDF documents written for reading, not for data. Each item is matched to a school, an amount, a vendor and an account by fixed text patterns, and some items may be misread, assigned to the wrong school, or missed. Each amount is shown as printed in the source document, which is linked on every line; check the original before relying on a figure. The yearly totals add only the items found and read this way, so they are incomplete and are not a full accounting of spending at any school. If you find an error, please let us know.

Board-approved amounts are not actual spending. Routine custodial work, utilities and small repairs never come to the board, and an approved quote is not proof of what was finally paid. Change orders, not-to-exceed ceilings and updates are listed below but not added.

Not published by school

School-specific maintenance expenditures have not been identified in the publicly available records reviewed. Some maintenance expenses may be reported at the district level.

  • LDOE Annual Financial Reports, 2017-18 to 2024-25: maintenance for the whole school system only.
  • LDOE per-pupil expenditure files, 2016-17 to 2023-24: by school, but with no maintenance category.
  • Act 310 school expenditure reports: by school, no maintenance line.
  • The board's adopted budget: one district-wide "Plant Maintenance & Operations" line; the ward maintenance accounts the items below draw on are budgeted by ward, not by school.

District-wide, not this school's 2024-25: $10,442,619 for all buildings, $1,975 per student (Louisiana $1,881). Year by year

Board actions naming this school

Facility actions approved by the school board
Meeting WhatWorkAmountPaid fromDecision
Jul 16, 2026
Regular meeting · FY 2026-27
also on Jul 14, 2026
JES - Purchase of four 98 inch Newline Smart TV's
Vendor: Camcor, Inc
Full text

1.G. JES - Purchase of four 98 inch Newline Smart TV's e Grant permission to JES to purchase and install four 98 inch Newline Smart TV's with Screen|Beam Bundle & Hardware with a 3-year subscription to admin tools with all cabling and installation at a total cost of $22,943.00 from Camcor, Inc. on TIPS contract # 230901 to be paid from Ward 2 Maintenance. MOTION BY: . SECONDED BY: * PUBLIC COMMENT DISCUSSION VOTE i

Source: July 2026 BOARD AGENDA.pdf · item V.1.G
Equipment & technology bought from maintenance funds
Purchase
$22,943
Board-approved amount
Ward 2 Maintenance
Ward maintenance district funds
Approved
unanimously approved
Jul 16, 2026
Regular meeting · FY 2026-27
District-wide item
Fortification of School Entrances at JHS, JES, JWCE, HHS, EHS, EES, FES and LHS
Vendor: Barrier USA
Full text

1.J. Fortification of School Entrances at JHS, JES, JWCE, HHS, EHS, EES, FES and LHS e Consideration to approve the quote from Eversafe in the amount of $ 109,663.27 for fortification of school entrances at JHS, JES, JWCE, HHS, EHS, EES, FES and LHS. Other quote received from Barrier USA ($121,560.73). To be paid from each School Maintenance funds and the Louisiana Safe Schools Safety Grant.

Source: July 2026 BOARD AGENDA.pdf · item V.1.J
Other facility work
Quote accepted
$109,663.27
Accepted quote
Also named: $121,560.73
Not stated in the item Approved
unanimously approved
Mar 19, 2026
Regular meeting · FY 2025-26
also on Mar 17, 2026
Consideration of granting permission to JES to purchase 100 Chromebooks from CDW-G (on state contract #4400028088) with Google Chrome Education upgrades at a cost of $29,600.00.
Vendor: CDW-G
Full text

Consideration of granting permission to JES to purchase 100 Chromebooks from CDW-G (on state contract #4400028088) with Google Chrome Education upgrades at a cost of $29,600.00. To be paid from Ward II Maintenance.

Source: Agenda March 26.pdf · item VI.A.4
Equipment & technology bought from maintenance funds
Purchase
$29,600
Board-approved amount
Ward II Maintenance
Ward maintenance district funds
Not recorded
Feb 10, 2026
Finance/Salary committee · FY 2025-26
Consideration for JES to enter into a service contract with Schindler Elevator
Vendor: Schindler Elevator Corporation Company
Full text

4. Consideration for JES to enter into a service contract with Schindler Elevator Corporation Company for service and maintenance on the two elevators for an annual cost of $13,261.14 Annual contract from February 1, 2026 to January 31, 2027. To be paid from Ward II Maintenance. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: Finance February 26.pdf · item III.4
Service contracts & custodial
Service contract
$13,261.14
Annual contract amount
Ward II Maintenance
Ward maintenance district funds
Committee item
Sep 16, 2025
Finance/Salary committee · FY 2025-26
Grant permission to JES to renew the annual site license with IXL (3-6 grades) at a cost of $15,207.50 for 550 student licenses for Math, ELA, Science and Social Studies.
Vendor: IXL
Full text

Grant permission to JES to renew the annual site license with IXL (3-6 grades) at a cost of $15,207.50 for 550 student licenses for Math, ELA, Science and Social Studies. This is used to support additional support of standards, provides interventions for skill gaps and will be used to target growth goals with the lower 25% for Math, ELA, Science and Social Studies. T. To be paid from JES Maintenance.

Source: Finance September 25.pdf · item V.5.3
Other facility work
Approval
$15,207.50
Board-approved amount
JES Maintenance
Ward maintenance district funds
Committee item
Mar 20, 2025
Regular meeting · FY 2024-25
Grant permission to JES to enter into a service contract with Schindler Elevator Corporation Company for service and maintenance on the two elevators for an annual cost of $12,630.00.
Vendor: Schindler Elevator Corporation Company
Full text

Grant permission to JES to enter into a service contract with Schindler Elevator Corporation Company for service and maintenance on the two elevators for an annual cost of $12,630.00. Annual contract from February 1, 2025 to January 31, 2026. To be paid from Ward II Maintenance.

Source: March Board Agenda addendum 2025.pdf · item VI.E.3
Service contracts & custodial
Service contract
$12,630
Annual contract amount
Ward II Maintenance
Ward maintenance district funds
Not recorded
Feb 20, 2025
Regular meeting · FY 2024-25
also on Feb 18, 2025
Grant permission to JES to purchase on state contract (4400025603) from
Full text

D.4. Grant permission to JES to purchase on state contract (4400025603) from Sunshine Quality Solutions in Jennings, LA, a 2025 John Deere Gator HPX615E at a price of $16,750.05. To be paid from JES Maintenance account. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: February Board Agenda addendum 2025.pdf · item VII.D.4
Other facility work
Purchase
$16,750.05
Board-approved amount
JES Maintenance account
Ward maintenance district funds
Not recorded
Oct 17, 2024
Regular meeting · FY 2024-25
Grant permission to JES to accept the quote of $37,150.55 from Big A** Fans for 3, 16 foot fans to be installed in the pavilion area.
Vendor: Macro Air
Full text

Grant permission to JES to accept the quote of $37,150.55 from Big A** Fans for 3, 16 foot fans to be installed in the pavilion area. Other quotes received were from Macro Air for $29,606.98 and Ameriwind for $10,405.59 (for only 2, 16 foot fans - no installation) JES would like to accept the quote from Big A** Fans due to their availability to install, 15 year warranty on both the equipment and labor and guarantee of cost with their onsite visit to provide the quote. Expenses to be covered by SD#2 Maintenance.

Source: Board Agenda Oct 2024 addendum.pdf · item VII.C.3.10
Other facility work
Quote accepted
$37,150.55
Accepted quote
Also named: $29,606.98, $10,405.59
Not stated in the item Not recorded
Jul 18, 2024
Regular meeting · FY 2024-25
also on Jul 16, 2024
Grant permission to accept Change Order No. 1 on the JDPSB – JES Improvements Project.
Full text

Grant permission to accept Change Order No. 1 on the JDPSB – JES Improvements Project. Description: Change Order #1 - Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) * COR #1 – Order additional LVT floor tile. * COR #2 – Remove outlets in multipurpose, add outlets at stairwells. * COR #3 – Replace cut/damaged LVT floor tile at multipurpose and library * COR #4 – Paint stair handrails * COR #5 – Install wall protection in administration corridor * COR #6 – Provide and install locksets with occupancy indicators at Faculty RR * COR #7 – Fabricate and install painted steel gates w/latch under each Stairwell * COR #8 – Provide pad for nurse’s waiting bench * COR #9 – Provide additional cabinets in nurse’s office * COR #10 – Remove and replace doorstops at 25 locations Details: Change Order #1 for $51,253.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $241,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $241,000.00 The Contract Sum will be increased by $ 51,253.00 The new Contract Sum including this Change Order will be $292,253.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be July 23, 2024

Source: July 2024 Board Agenda addendum.pdf · item VII.A.2.2
Construction & change orders
Change order
$51,253
Increase to the contract sum
Also named: $241,000, $0, $292,253
Not stated in the item Not recorded
Jun 13, 2024
Regular meeting · FY 2023-24
A.19. Approve the change of funding source to JES contingency for the purchase of 300 Boomerang-Shaped Student Desks with book boxes at a cost of $210.04 each on State Contract from Virco (#4400025969).
Full text

A.19. Approve the change of funding source to JES contingency for the purchase of 300 Boomerang-Shaped Student Desks with book boxes at a cost of $210.04 each on State Contract from Virco (#4400025969). Ward II Construction was initially approved as the funding source at the January meeting.

Source: June 2024 Board Agenda addendum.pdf · item VII.A.19
Construction & change orders
Purchase
$210.04
Board-approved amount
Not stated in the item Not recorded
Jun 11, 2024
Finance/Salary committee · FY 2023-24
Approve the change of funding source to JES contingency for the purchase
Full text

19. Approve the change of funding source to JES contingency for the purchase of 300 Boomerang-Shaped Student Desks with book boxes at a cost of $210.04 each on State Contract from Virco (#4400025969). Ward II Construction was initially approved as the funding source at the January meeting. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: Finance June 24.pdf · item V.19
Construction & change orders
Purchase
$210.04
Board-approved amount
Not stated in the item Committee item
Apr 18, 2024
Regular meeting · FY 2023-24
Accept the lowest bid from Trahan Construction for Jennings
Vendor: Trahan Construction
Full text

C.2. Accept the lowest bid from Trahan Construction for Jennings Elementary Improvements in the amount of $241,000.00. Other bids received from James H. Fontenot Construction ($267,000.00) and K & J Development ($265,000.00). To be paid from Ward II Construction and/or Ward II Contingency. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: April 2024 Board Agenda addendum.pdf · item VII.C.2
Construction & change orders
Bid awarded
$241,000
Accepted bid
Also named: $267,000, $265,000
Ward II Construction and/or Ward II Contingency
Ward maintenance district funds
Not recorded
Feb 20, 2024
Finance/Salary committee · FY 2023-24
Grant permission to JES to enter into a service contract with Schindler Elevator
Vendor: Schindler Elevator Corporation Company
Full text

2. Grant permission to JES to enter into a service contract with Schindler Elevator Corporation Company for service and maintenance on the two elevators for an annual cost of $11,771.99. To be paid from Ward II Maintenance. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: February 24 Finance.pdf · item V.2
Service contracts & custodial
Service contract
$11,771.99
Annual contract amount
Ward II Maintenance
Ward maintenance district funds
Committee item
Jan 23, 2024
Finance/Salary committee · FY 2023-24
Grant permission to JES to purchase 300 Boomerang-Shaped Student
Full text

9. Grant permission to JES to purchase 300 Boomerang-Shaped Student Desks with book boxes at a cost of $210.04 each on State Contract from Virco (#4400025969). To be paid from Ward II Construction. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: January 24 Finance 2.pdf · item V.9
Construction & change orders
Purchase
$210.04
Board-approved amount
Ward II Construction
Ward maintenance district funds
Committee item
Oct 19, 2023
Regular meeting · FY 2023-24
also on Oct 17, 2023
Grant permission to the Maintenance Supervisor, Mr. Richard, to
Vendor: K&D Lawncare
Full text

A.7. Grant permission to the Maintenance Supervisor, Mr. Richard, to accept the lowest quote from K&D Lawncare for lawn maintenance of the old JES and WEIC locations at a total cost of $700 per cut ($500 for old JES and $200 for WEIC). The total number of cuts shall not exceed 16 cuts during contract unless written consent is given by Superintendent Designee. Other quotes received were from John's Affordable Lawn Care for $1,760 for both locations and from Duhon Lawn Care for $2,000 for both locations. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

Source: October Board Agenda Addendum 2023.pdf · item VI.A.7
Other facility work
Quote accepted
$700
Accepted quote
Also named: $500, $200, $1,760
Not stated in the item Not recorded
Sep 21, 2023
Regular meeting · FY 2023-24
also on Sep 19, 2023
Grant permission to JES to accept the quote of $39,605.00 from Bliss Products for the purchase and installation of Eave Hip Shades in the Pre-K and Kindergarten play areas.
Vendor: Bliss Products
Full text

Grant permission to JES to accept the quote of $39,605.00 from Bliss Products for the purchase and installation of Eave Hip Shades in the Pre-K and Kindergarten play areas. Other quotes received from Hahn, Enterprises, Inc. ($43,196.00) and Office Centre- Teacher’s Pet ($46,900.00). To be paid from Ward II Construction.

Source: September Board Agenda Addendum 2023.pdf · item VII.A.14
Construction & change orders
Quote accepted
$39,605
Accepted quote
Also named: $43,196, $46,900
Ward II Construction
Ward maintenance district funds
Not recorded
Sep 21, 2023
Regular meeting · FY 2023-24
A.14. Grant permission to JES to accept the quote of $39,605.00 from Bliss Products for the purchase and installation of Eave Hip Shades in the Pre-K and Kindergarten play areas.
Vendor: Bliss Products
Full text

A.14. Grant permission to JES to accept the quote of $39,605.00 from Bliss Products for the purchase and installation of Eave Hip Shades in the Pre-K and Kindergarten play areas. Other quotes received from Hahn, Enterprises, Inc. ($43,196.00) and Office Centre- Teacher’s Pet ($46,900.00). To be paid from Ward II Construction.

Source: September Board Agenda Addendum 2023.pdf · item VII.A.14
Construction & change orders
Quote accepted
$39,605
Accepted quote
Also named: $43,196, $46,900
Ward II Construction
Ward maintenance district funds
Not recorded
Feb 16, 2023
Regular meeting · FY 2022-23
also on Feb 14, 2023
Approve the purchase of 2 school zones flashing beacons for
Vendor: Tapco Inc
Full text

A.5. Approve the purchase of 2 school zones flashing beacons for Jennings Elementary from Tapco Inc. in the amount of $11,131.82 ($5,565.91 each). Other quotes received were from Transportation Solutions and Lighting in the amount of $11,294.00 ($5,647.00 each) and Temple Inc. 12,784.40 ($6,392.20 each). To be paid out of Ward 2 construction fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: February 2023 Board Agenda Addendum.pdf · item VII.A.5
Electrical & lighting
Quote accepted
$11,131.82
Accepted quote
Also named: $5,565.91, $11,294, $5,647
Ward 2 construction fund
Ward maintenance district funds
Not recorded
Sep 15, 2022
Regular meeting · FY 2022-23
also on Sep 13, 2022
Approve the addition of a Slimline structure for Staff covering at
Full text

A.9. Approve the addition of a Slimline structure for Staff covering at Jennings Elementary at a cost not to exceed $24,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: September 2022 Board Agenda Addendum.pdf · item VI.A.9
Construction & change orders
Pre-approval
$24,000
Not-to-exceed ceiling
Ward II Construction
Ward maintenance district funds
Not recorded
Sep 15, 2022
Regular meeting · FY 2022-23
also on Sep 13, 2022
Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000.
Full text

Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000. To be paid by Ward II Construction.

Source: September 2022 Board Agenda Addendum.pdf · item VI.A.10
Security, cameras & doors
Pre-approval
$9,000
Not-to-exceed ceiling
Ward II Construction
Ward maintenance district funds
Not recorded
Aug 18, 2022
Regular meeting · FY 2022-23
also on Aug 16, 2022
Grant permission to accept Change Order No. 6 on the Jennings Elementary Construction Project.
Full text

Grant permission to accept Change Order No. 6 on the Jennings Elementary Construction Project. Change Order #6 reflects the following changes: * Item #72 Cellular elevator communications requested by Fire Marshal $ 3,326.00 * Item # 74 Turn Lane revisions made by DOTD After approval $94,691.00 * Item #78 Remove and reinstall drainpipe at turning $13,055.00 * Item #80 Fencing upgrades per JDPSB requirements $25,043.00 * Item #82 Huff core folding partition wall replacement $59,266.00 * Item #84 Hardware modifications for Pre-K and K $ 7,336.00 Classrooms * Item #86 Culvert replacement at Hwy 26 trailer park $ 9,159.00 * Item #88 Sod front entry courtyard $ 3,710.00 * Item #89 Credit for Gojo soap dispensers -$ 1,848.00 * Item #91 Add sidewalk at back administration door $ 5,738.00 * Item #94 New cast bronze plaques to replace original $ 3,600.00 * Item #95 Additional security cameras with audio as required by school system $20,834.00 * Item #96 Additional data drops and electrical at B Wing per school requests $ 1,331.00 * Item #97 Gym Projector $44,902.00 * Item #98 Repaint 80 door frames due to furniture installation $ 3,200.00 * Item #99 Additional mini blinds at resource classroom $ 2,665.00 * Item #100 Stage Curtains $26,289.00 * Item #101 Relocate west perimeter gate to high ground $ 1,300.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,873,941.00 The Contract Sum prior to this Change Order $23,958,941.00 Th

Source: August 2022 Board Agenda Addendum.pdf · item VI.G.1
Construction & change orders
Change order
$330,588
Increase to the contract sum
Also named: $3,326, $94,691, $13,055
Not stated in the item Not recorded
Aug 18, 2022
Regular meeting · FY 2022-23
also on Aug 16, 2022
Grant permission to the Assistant Superintendent to proceed with accepting the lawn care(including mowing, spraying, weed eating, and blowing) quote from Duhon Lawn Care in the amount of $1,000 per cut of the Jennings Elementary Campus on Florence Street.
Vendor: Duhon Lawn Care
Full text

Grant permission to the Assistant Superintendent to proceed with accepting the lawn care(including mowing, spraying, weed eating, and blowing) quote from Duhon Lawn Care in the amount of $1,000 per cut of the Jennings Elementary Campus on Florence Street. Another quote received from Willridge Lawn Service was for $1,600 per cut. Other quotes were solicited but no response received. To be paid from Ward II Maintenance.

Source: August 2022 Board Agenda Addendum.pdf · item VI.G.3
Grounds, fields & pest control
Quote accepted
$1,000
Accepted quote
Also named: $1,600
Ward II Maintenance
Ward maintenance district funds
Not recorded
Aug 16, 2022
Finance/Salary committee · FY 2022-23
Grant permission to JES to purchase from Newell Wholesale Paper Company
Vendor: Newell Wholesale Paper Company Merchants
Full text

7. Grant permission to JES to purchase from Newell Wholesale Paper Company Merchants 2 ride on floor scrubbers at a cost of $26,545.63. To be paid from Ward II New Construction. Other quote received from Cajun Chemical & Janitorial Supply, Inc. ($43,068.80) MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: August 2022 Finance Agenda1.pdf · item IV.7
Building repairs, paint & floors
Quote accepted
$26,545.63
Accepted quote
Also named: $43,068.80
Ward II New Construction
Ward maintenance district funds
Committee item
Jul 21, 2022
Regular meeting · FY 2022-23
also on Jul 19, 2022
Grant permission to accept Change Order No. 5 on the Jennings Elementary Construction Project.
Full text

Grant permission to accept Change Order No. 5 on the Jennings Elementary Construction Project. Change Order #5 reflects the following changes: * 24 additional days, due to flooring manufacturing delays Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,873,941.00 The Contract Sum prior to this Change Order $23,958,941.00 The Contract Sum will be increased by $ .00 The new Contract Sum including this Change Order will be $23,958,941.00 The Contract Time will be increased by twenty four (24) days The new date of Substantial Completion will be August 11, 2022

Source: July 2022 Board Agenda Addendum.pdf · item VII.G.2
Construction & change orders
Change order
$0
No change to the contract sum (time only)
Also named: $22,085,000, $1,873,941, $23,958,941
Not stated in the item Not recorded
Jul 21, 2022
Regular meeting · FY 2022-23
Authorize a purchase for the new Jennings Elementary School of A maximum of 54 shelving units for classrooms at a total not to exceed $37,508.40 through State contract, from Virco, to be paid out of Ward II Construction. Source: July 2022 Board Agenda Addendum.pdf · item VII.G.1 Construction & change orders
Pre-approval
$37,508.40
Not-to-exceed ceiling
Ward II Construction
Ward maintenance district funds
Not recorded
Jul 19, 2022
Ward Ii committee · FY 2022-23
To authorize a purchase for the new Jennings Elementary School of 54 shelving
Full text

1. To authorize a purchase for the new Jennings Elementary School of 54 shelving units for classrooms at a total of $37,508.40 through State contract, from Virco, to be paid out of Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: July 2022 Ward II Agenda 2ND.pdf · item V.1
Construction & change orders
Purchase
$37,508.40
Board-approved amount
Ward II Construction
Ward maintenance district funds
Committee item
Jun 16, 2022
Regular meeting · FY 2021-22
also on Jun 14, 2022
Grant permission to purchase from Home Depot Pro Institutional 3 sets of washers and dryers, 8 microwaves and 4 refrigerators for the New Jennings Elementary School at the approximate total cost of $8,312 to be paid for from Ward II Construction.
Vendor: Home Depot Pro Institutional
Full text

Grant permission to purchase from Home Depot Pro Institutional 3 sets of washers and dryers, 8 microwaves and 4 refrigerators for the New Jennings Elementary School at the approximate total cost of $8,312 to be paid for from Ward II Construction. Other quotes received were $10,164 from Stine and $8,088 from Lowes with not all items being in stock. 13. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the two-year Gasoline & Diesel Off Site Fueling System contract for the two-year period beginning July 1, 2022 and ending June 30, 2024, as recommended by the Director of Finance. Sealed bids were opened on Thursday, June 2, 2022 @ 2:00 p.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. Fuselier Canal provided an Elton only bid of $.7 per gallon margin over the OPIS (LakeCharles) terminal price.

Source: June 2022 Board Agenda.pdf · item I.5.12
Construction & change orders
Bid awarded
$8,312
Accepted bid
Also named: $10,164, $8,088
Ward II Construction
Ward maintenance district funds
Not recorded
Jun 16, 2022
Regular meeting · FY 2021-22
Grant permission to the Superintendent to enter into an agreement with the Louisiana Public Service Commission to receive energy efficient LED lighting to be installed at the Jennings Elementary Tennis Courts at no cost to the board.
Full text

Grant permission to the Superintendent to enter into an agreement with the Louisiana Public Service Commission to receive energy efficient LED lighting to be installed at the Jennings Elementary Tennis Courts at no cost to the board. This program is part of the Public Service Commission's Statewide Energy Efficiency Program and will provide an estimated lighting project valued at $51,520.00.

Source: June 2022 Board Agenda.pdf · item I.8.8
Electrical & lighting
Approval
$51,520
Board-approved amount
Not stated in the item Approved
unanimously carried
May 12, 2022
Regular meeting · FY 2021-22
also on May 10, 2022
Authorize a total contract for Professional Fees of $78,075 to be paid to Champeaux, Evans and Hotard for architectural services for the JES Furniture Package - Part A as invoiced.
Full text

Authorize a total contract for Professional Fees of $78,075 to be paid to Champeaux, Evans and Hotard for architectural services for the JES Furniture Package - Part A as invoiced. Current invoice # 1807A-01 in the amount of $70,267.50 and remaining cost to be invoiced at a later date. To be paid from WARD II construction.

Source: May 2022 Board Agenda Addendum.pdf · item VII.L.6
Construction & change orders
Approval
$78,075
Board-approved amount
Also named: $70,267.50
WARD II construction
Ward maintenance district funds
Not recorded
Apr 7, 2022
Regular meeting · FY 2021-22
**** ADDENDUM TO FINANCE 1.
Full text

**** ADDENDUM TO FINANCE 1. Grant permission to accept Change Order No. 4 on the Jennings Elementary Construction Project. Change Order #4 reflects the following changes: Item Cor #59 $163,665.00 Additional grading and drainage at soft surface Areas Item Cor #64 $ 42,320.00 Provide & Install an New Single-sided Pedestal Sign Item Cor #65 $ 29,317.00 Provide & Install a New Monument Sign at Hwy 26 Item Cor #67 $ 21,934.00 Provide Labor & Equipment for Yard Drains Fencing Walk Gates and New Ramp ● add grading & drainage @ soft surface areas ● add additional sidewalks and trench drain covers required for soft surfacing & playground equipment ● enlarge the Trike Tracks ● Adjust fencing and gates for the kickball field ● additional fencing and bollard located near the existing North and South drop off canopies for student safety Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,616,705.00 The Contract Sum prior to this Change Order $23,701,705.00 The Contract Sum will be increased by $ 257,236.00 The new Contract Sum including this Change Order will be $23,958,941.00 The Contract Time will be increased by forty days (40) days The new date of Substantial Completion will be July 18, 2022

Source: April 2022 Board Agenda Addendum.pdf · item VI.A
Construction & change orders
Change order
$257,236
Increase to the contract sum
Also named: $163,665, $42,320, $29,317
Not stated in the item Not recorded
Mar 17, 2022
Regular meeting · FY 2021-22
also on Mar 15, 2022
Grant permission to Laurie Duhon, Technology Supervisor to purchase 14 Samsung 4K TVs and 14 tilting wall mounts for the following areas at the new Jennings Elementary School from 2nd Gear - TIPS contract #200105 for a total price of $17,152.00 to be paid for through Ward 2 Construction.
Full text

Grant permission to Laurie Duhon, Technology Supervisor to purchase 14 Samsung 4K TVs and 14 tilting wall mounts for the following areas at the new Jennings Elementary School from 2nd Gear - TIPS contract #200105 for a total price of $17,152.00 to be paid for through Ward 2 Construction. Quantity/Size/Type/Location: 4 - 85" QBR-B Series Samsung 4K UHD TVs - Open Area (Facing School Entrance)/Gymnasium Area (Facing the Stage) 10-55" BET-H Series 4K UHD - Administrative Offices/Teachers' Lounge/Cafeteria

Source: March 2022 Board Agenda Addendum.pdf · item VII.A.7
Building repairs, paint & floors
Purchase
$17,152
Board-approved amount
Not stated in the item Not recorded
Mar 4, 2022
Special meeting · FY 2021-22
Consider the purchase for the new Jennings Elementary School of 93
Vendor: Dell Technologies
Full text

1. Consider the purchase for the new Jennings Elementary School of 93 Dell Optiplex 5090 desktops with monitors and soundbars at an individual cost of $1,022.98 per station and 18 administrative monitors ($211.81) for a total of $98,949.72, from Dell Technologies, all on state contract to be paid out of Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: March 2022 Special Board Agenda.pdf · item V.1
Construction & change orders
Purchase
$98,949.72
Board-approved amount
Also named: $1,022.98, $211.81
Ward II Construction
Ward maintenance district funds
Not recorded
Mar 4, 2022
Special meeting · FY 2021-22
Consider the purchase for the new Jennings Elementary School of 71 New Line Panels (Interactive Boards) with mobile stands ($2794) and 12 additional mobile stands ($355) for a total of $202,643 on state contract, from Bluum (previously Troxell), to be paid out of Ward II Construction.
Full text

Consider the purchase for the new Jennings Elementary School of 71 New Line Panels (Interactive Boards) with mobile stands ($2794) and 12 additional mobile stands ($355) for a total of $202,643 on state contract, from Bluum (previously Troxell), to be paid out of Ward II Construction. Any newer computers or interactive boards that are currently at Jennings Elementary will be moved to Jennings High to replace aging computers and interactive boards when the school opens.

Source: March 2022 Special Board Agenda.pdf · item V.2.2
Construction & change orders
Purchase
$202,643
Board-approved amount
Also named: $2,794, $355
Ward II Construction
Ward maintenance district funds
Not recorded
Mar 4, 2022
Special meeting · FY 2021-22
Consider the purchase for the new Jennings Elementary School of
Full text

3. Consider the purchase for the new Jennings Elementary School of sofas, ottomans, chairs and a variety of soft seating surfaces and other furniture items for the shared open spaces for a total of $170,623.32 through TIPS contract, from Virco, to be paid out of Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: March 2022 Special Board Agenda.pdf · item V.3
Construction & change orders
Purchase
$170,623.32
Board-approved amount
Ward II Construction
Ward maintenance district funds
Not recorded
Mar 4, 2022
Special meeting · FY 2021-22
Consider the purchase for the new Jennings Elementary School of
Vendor: Dell Technologies
Full text

4. Consider the purchase for the new Jennings Elementary School of seven 5520 Dell Latitude Laptops to be placed in the flex areas, stage and the library at an individual state contract price of $1,094.31 for a total cost of $7,666.17, from Dell Technologies, to be paid from Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: March 2022 Special Board Agenda.pdf · item V.4
Construction & change orders
Purchase
$7,666.17
Board-approved amount
Also named: $1,094.31
Ward II Construction
Ward maintenance district funds
Not recorded
Feb 17, 2022
Regular meeting · FY 2021-22
Authorize the payment of $62,272.30 to Champeaux, Evans and Hotard for architectural services for the JES Playground Equipment Package - Part B. To be paid from WARD II New construction. Source: February 2022 Board Agenda Addendum.pdf · item VII.A.13 Grounds, fields & pest control
Approval
$62,272.30
Board-approved amount
WARD II New construction
Ward maintenance district funds
Not recorded
Feb 17, 2022
Regular meeting · FY 2021-22
WARD II COMMITTEE - REQUEST FROM THE WARD II COMMITTEE
Vendor: Play & Park Structures
Full text

G. WARD II COMMITTEE - REQUEST FROM THE WARD II COMMITTEE CHAIRMAN, PHILLIP ARCENEAUX, CHAIRMAN, THAT THE SCHOOL BOARD: 1. Consider the purchase of playground equipment for the new Jennings Elementary School from Play & Park Structures in the amount of $788,195.92. To be purchased on TIPS contract. To be paid from WARD II New construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: February 2022 Board Agenda.pdf · item VII.G
Grounds, fields & pest control
Purchase
$788,195.92
Board-approved amount
WARD II New construction
Ward maintenance district funds
Not recorded
Feb 8, 2022
Ward meeting · FY 2021-22
Consider the purchase of playground equipment for the new Jennings
Vendor: Play & Park Structures
Full text

1. Consider the purchase of playground equipment for the new Jennings Elementary School from Play & Park Structures in the amount of $788,195.92. To be purchased on TIPS contract. To be paid from WARD II New construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: February 2022 Ward II Agenda.pdf · item V.1
Grounds, fields & pest control
Purchase
$788,195.92
Board-approved amount
WARD II New construction
Ward maintenance district funds
Not recorded
Jan 18, 2022
Finance/Salary committee · FY 2021-22
Grant permission to accept Change Order No. 3 on the Jennings Elementary
Full text

4. Grant permission to accept Change Order No. 3 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 02/04/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #3 reflects the following changes: Item Cor #40 Add Circuits for Additional Microwave Ovens in Teachers Lounge $ 2,880.00 Item Cor #41 Make Improvements to the Adaptive P.E. Rooms $ 22,502.00 Item Cor #42 Furnish & Install Aluminum Rolling Grilles between Kitchen and Dining $ 31,010.00 Item Cor #43 Add Second Hand Wash Station in Dining Area for Second Serving Line $ 4,689.00 Item Cor #46 Add Millwork and Circuits to Accommodate Microwaves at Dining for Staff $ 3,710.00 Item Cor #47 Add Teacher Cubbies in Break Room $ 4,450.00 Item Cor #52 Change the Topcoat Finish Type of Paint $ no cost Item Cor#54 CCTV Manufacturer Change as now Required by Law $ 95,097.00 Item Cor#57 Provide the New Turning Lane now Approved by DOTD $ 250,535.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,201,832.00 The Contract Sum prior to this Change Order $23,286,832.00 The Contract Sum will be increased by $ 414,873.00 The new Contract Sum including this Change Order will be $23,701,705.00 The Contract Time will be increased by forty days (4

Source: January 2022 Finance Agenda.pdf · item IV.4
Construction & change orders
Change order
$414,873
Increase to the contract sum
Also named: $22,085,000, $2,880, $22,502
Not stated in the item Committee item
Aug 19, 2021
Regular meeting · FY 2021-22
Grant permission to accept Change Order No. 2 on the Jennings Elementary Construction Project.
Full text

Grant permission to accept Change Order No. 2 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 08/16/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #1 reflects the following changes: Item Cor #16 Additional Floor Boxes $ 14,530.00 Item Cor #19 Credit for Handsets & Admin Consoles <$ 7,679.00> Item Cor #20 Sound System $ 23,114.00 Item Cor #25 Add Tectum in Shared Space Bldg C & D Both Floors $ 75,393.00 Item Cor #26 Flooring Upgrades $699,111.00 Item Cor #30 Frame Metal Studs, Add New Window Frames (12 days) $ 14,384.00 Item Cor #36 Change LVT to CT at Restroom Vestibules $ 4,490.00 Item Cor #38 Way Finding Sign Changes $ 1,960.00 Item Cor #39 Toilet Accessories Changes $ 5,467.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 371,062.00 The Contract Sum prior to this Change Order $ 22,456.00 The Contract Sum will be increased by $ 830,770.00 The new Contract Sum including this Change Order will be $23,286,832.00 The Contract Time will be increased by twelve (12) days The new date of Substantial Completion will be April 29, 2022

Source: August 2021 Board Agenda Addendum.pdf · item VI.14.A.14
Construction & change orders
Change order
$830,770
Increase to the contract sum
Also named: $22,085,000, $14,530, $7,679
Not stated in the item Not recorded
Feb 25, 2021
Regular meeting · FY 2020-21
also on Feb 23, 2021
Grant permission to accept Change Order No. 1 on the Jennings Elementary Construction Project.
Full text

Grant permission to accept Change Order No. 1 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 02/04/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #1 reflects the following changes: Item Cor #2 Flood Insurance $ 6,500.00 Item Cor #3 Tree removal at North Property Line $ 8,320.00 Item Cor #4 Underground Conduit for Entergy $ 32,591.00 Item Cor #6 Foundation work for storage shed $ 29,172.00 Item Cor #7 Time Hurricane Laura and Delta (8 days) Item Cor #8 Truss Clips $ 34,238.00 Item Cor #10 Maintenance Shop/PE Storage $260,241.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ .00 The Contract Sum prior to this Change Order $22,085,000.00 The Contract Sum will be increased by $ 371,062.00 The new Contract Sum including this Change Order will be $22,456,062.00 The Contract Time will be increased by twenty-two (22) days The new date of Substantial Completion will be April 17, 2022

Source: February 2021 Board Agenda Addendum.pdf · item VI.A.4
Construction & change orders
Change order
$371,062
Increase to the contract sum
Also named: $22,085,000, $6,500, $8,320
Not stated in the item Not recorded
Nov 19, 2020
Regular meeting · FY 2020-21
also on Nov 17, 2020
Grant permission to JES to purchase on state contract from TROX 14 Interactive Panel Boards ($3,045.00 each) plus software (no cost) and fourteen mobile stands ($5,040.00 each) for a total cost of $47,670.00.
Vendor: TROX
Full text

Grant permission to JES to purchase on state contract from TROX 14 Interactive Panel Boards ($3,045.00 each) plus software (no cost) and fourteen mobile stands ($5,040.00 each) for a total cost of $47,670.00. To be paid from Maintenance #2.

Source: November 2020 Board Agenda Addendum.pdf · item VI.A.13
Equipment & technology bought from maintenance funds
Purchase
$47,670
Board-approved amount
Also named: $3,045, $5,040
Maintenance #2
Ward maintenance district funds
Not recorded
Jul 16, 2020
Regular meeting · FY 2020-21
also on Jul 14, 2020
Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary.
Vendor: M.D. Descant
Full text

Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Grant permission to accept the bid of Trahan Construction, LLC of $22,085,000.00. Other bids received from M.D. Descant, LLC $23,758,000.00, Pat Williams Construction, LLC $22,400,000.00, Ratcliff Construction, LLC $23,137,000.00, Rudick Company, Inc. $25,500,000.00 and Southern Constructors, LLC $24,300,000.00

Source: July 2020 Board Agenda Addendum.pdf · item V.A.3
Construction & change orders
Bid awarded
$22,085,000
Accepted bid
Also named: $23,758,000, $22,400,000, $23,137,000
Not stated in the item Not recorded
Jun 20, 2019
Regular meeting · FY 2018-19
Grant permission to JES to purchase at a cost of $7,049.00 a 2019 Bad
Vendor: Hornsby Lawn and Equipment
Full text

12. Grant permission to JES to purchase at a cost of $7,049.00 a 2019 Bad Boy Rebel 61” Kawasaki 27 hp zero turn lawnmower from Kenjabrach. Other quotes received from Hornsby Lawn and Equipment ($10,625.00- Exmark 60” 27 hp) and Thib’s Outdoor Equipment and Trailers ($9,699.00 - Ferris Kawasaki 61” 25.5 hp or $7,996.12 - X One 60” Kawasaki 27 hp) To be paid from 18-19 Ward II Maintenance Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

Source: June 2019 Agenda Addendum.pdf · item VI.12
Grounds, fields & pest control
Quote accepted
$7,049
Accepted quote
Also named: $10,625, $9,699, $7,996.12
18-19 Ward II Maintenance Contingency
Ward maintenance district funds
Not recorded
Oct 18, 2018
Regular meeting · FY 2018-19
Declare an emergency at JES to repair the Boiler Unit as follows: 1.
Full text

Declare an emergency at JES to repair the Boiler Unit as follows: 1. Remove/replace main high limit switch on boiler, Remove/replace water circulation pump and after repairs - start and monitor boiler performance. At a cost of $4,363.20. 2. Remove gas valve and replace with new one, Leak check valve and make sure valve isn’t leaking, watch operations of Boiler #3 and and make sure it meets expectations, follow up with customer. At a cost of $2,488.01. To be paid from Ward 2 Maintenance.

Source: October 2018 Board Agenda.pdf · item V.A.4
HVAC / air conditioning
Emergency repair
$4,363.20
Board-approved amount
Also named: $2,488.01
Ward 2 Maintenance
Ward maintenance district funds
Not recorded
Jul 19, 2018
Regular meeting · FY 2018-19
also on Jul 17, 2018
Grant permission for the Child Nutrition Program to accept the quote of $10,998.60 from Glenn Vanicor Builders, LLC for a Canopy for JES.
Vendor: Glenn Vanicor Builders, LLC
Full text

Grant permission for the Child Nutrition Program to accept the quote of $10,998.60 from Glenn Vanicor Builders, LLC for a Canopy for JES. Other quotes were solicited from 2 other contractors, but no other quotes were received. All funds will be from the Child Nutrition Funds.

Source: July 2018 Board Agenda.pdf · item V.A.13
Roofing
Quote accepted
$10,998.60
Accepted quote
Not stated in the item Not recorded

One record per decision: an item that appeared on a committee agenda and then the board agenda is listed once, from the board meeting. All schools' facility records, with filters.

Construction & capital projects at this schoolBack to top

Bids, contracts, change orders and construction updates that came before the school board and name this school, from the board's own agendas and minutes. Amounts are shown exactly as printed and are not added together; a change order's figure is often a new contract total. Committee items have no outcome because the full board decides.

JES Improvements 1 item, Jul 16, 2024

JES Improvements: board items
MeetingTypeItemAmounts namedOutcome
Jul 16, 2024
Finance/Salary committee
Change order Grant permission to accept Change Order No. 1 on the JDPSB – JES
Full text

2. Grant permission to accept Change Order No. 1 on the JDPSB – JES Improvements Project. Description: Change Order #1 - Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) * COR #1 – Order additional LVT floor tile. * COR #2 – Remove outlets in multipurpose, add outlets at stairwells. * COR #3 – Replace cut/damaged LVT floor tile at multipurpose and library * COR #4 – Paint stair handrails * COR #5 – Install wall protection in administration corridor * COR #6 – Provide and install locksets with occupancy indicators at Faculty RR * COR #7 – Fabricate and install painted steel gates w/latch under each Stairwell * COR #8 – Provide pad for nurse’s waiting bench * COR #9 – Provide additional cabinets in nurse’s office * COR #10 – Remove and replace doorstops at 25 locations Details: Change Order #1 for $51,253.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $241,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $241,000.00 The Contract Sum will be increased by $ 51,253.00 The new Contract Sum including this Change Order will be

$51,253.00
$241,000.00
$0.00
$292,253.00
Committee item

Jennings Ward II Phase 1 1 item, Apr 18, 2023

Jennings Ward II Phase 1: board items
MeetingTypeItemAmounts namedOutcome
Apr 18, 2023
Finance/Salary committee
Bid Accept the lowest bid for Jennings Ward II Phase 1 (JES Parking/JHS
Full text

11. Accept the lowest bid for Jennings Ward II Phase 1 (JES Parking/JHS Concession, vestibule, etc.). MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item

Jennings Elementary Construction 7 items, Feb 23, 2021 to Aug 18, 2022 · Accommodate Microwaves

Jennings Elementary Construction: board items
MeetingTypeItemAmounts namedOutcome
Aug 18, 2022
Regular meeting
Change order Grant permission to accept Change Order No. 6 on the Jennings
Full text

G.1. Grant permission to accept Change Order No. 6 on the Jennings Elementary Construction Project. Change Order #6 reflects the following changes: * Item #72 Cellular elevator communications requested by Fire Marshal $ 3,326.00 * Item # 74 Turn Lane revisions made by DOTD After approval $94,691.00 * Item #78 Remove and reinstall drainpipe at turning $13,055.00 * Item #80 Fencing upgrades per JDPSB requirements $25,043.00 * Item #82 Huff core folding partition wall replacement $59,266.00 * Item #84 Hardware modifications for Pre-K and K $ 7,336.00 Classrooms * Item #86 Culvert replacement at Hwy 26 trailer park $ 9,159.00 * Item #88 Sod front entry courtyard $ 3,710.00 * Item #89 Credit for Gojo soap dispensers -$ 1,848.00 * Item #91 Add sidewalk at back administration door $ 5,738.00 * Item #94 New cast bronze plaques to replace original $ 3,600.00 * Item #95 Additional security cameras with audio as required by school system $20,834.00 * Item #96 Additional data drops and electrical at B Wing per school requests $ 1,331.00 * Item #97 Gym Projector $44,902.00 * Item #98 Repaint 80 door frames due to furniture installation $ 3,200.00 * Item #99 Additional mini blinds at resource cl

$3,326.00
$94,691.00
$13,055.00
$25,043.00
$59,266.00
$7,336.00
Not recorded
Aug 16, 2022
Ward Ii committee
Change order Grant permission to accept Change Order No. 6 on the Jennings Elementary
Full text

1. Grant permission to accept Change Order No. 6 on the Jennings Elementary Construction Project. Change Order #6 reflects the following changes: * Item #72 Cellular elevator communications requested by Fire Marshal $ 3,326.00 * Item # 74 Turn Lane revisions made by DOTD After approval $94,691.00 * Item #78 Remove and reinstall drainpipe at turning $13,055.00 * Item #80 Fencing upgrades per JDPSB requirements $25,043.00 * Item #82 Huff core folding partition wall replacement $59,266.00 * Item #84 Hardware modifications for Pre-K and K $ 7,336.00 Classrooms * Item #86 Culvert replacement at Hwy 26 trailer park $ 9,159.00 * Item #88 Sod front entry courtyard $ 3,710.00 * Item #89 Credit for Gojo soap dispensers -$ 1,848.00 * Item #91 Add sidewalk at back administration door $ 5,738.00 * Item #94 New cast bronze plaques to replace original $ 3,600.00 * Item #95 Additional security cameras with audio as required by school system $20,834.00 * Item #96 Additional data drops and electrical at B Wing per school requests $ 1,331.00 * Item #97 Gym Projector $44,902.00 * Item #98 Repaint 80 door frames due to furniture installation $ 3,200.00 * Item #99 Additional mini blinds at resource clas

$3,326.00
$94,691.00
$13,055.00
$25,043.00
$59,266.00
$7,336.00
Committee item
Jul 21, 2022
Regular meeting
Change order Grant permission to accept Change Order No. 5 on the Jennings
Full text

G.2. Grant permission to accept Change Order No. 5 on the Jennings Elementary Construction Project. Change Order #5 reflects the following changes: * 24 additional days, due to flooring manufacturing delays Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,873,941.00 The Contract Sum prior to this Change Order $23,958,941.00 The Contract Sum will be increased by $ .00 The new Contract Sum including this Change Order will be $23,958,941.00 The Contract Time will be increased by twenty four (24) days The new date of Substantial Completion will be August 11, 2022 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$1,873,941.00
$23,958,941.00
Not recorded
Jul 19, 2022
Ward Ii committee
Change order Grant permission to accept Change Order No. 5 on the Jennings Elementary
Full text

2. Grant permission to accept Change Order No. 5 on the Jennings Elementary Construction Project. Change Order #5 reflects the following changes: * 24 additional days, due to flooring manufacturing delays Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 1,873,941.00 The Contract Sum prior to this Change Order $23,958,941.00 The Contract Sum will be increased by $ .00 The new Contract Sum including this Change Order will be $23,958,941.00 The Contract Time will be increased by twenty four (24) days The new date of Substantial Completion will be August 11, 2022 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$1,873,941.00
$23,958,941.00
Committee item
Jan 18, 2022
Finance/Salary committee
Change order Grant permission to accept Change Order No. 3 on the Jennings Elementary
Full text

4. Grant permission to accept Change Order No. 3 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 02/04/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #3 reflects the following changes: Item Cor #40 Add Circuits for Additional Microwave Ovens in Teachers Lounge $ 2,880.00 Item Cor #41 Make Improvements to the Adaptive P.E. Rooms $ 22,502.00 Item Cor #42 Furnish & Install Aluminum Rolling Grilles between Kitchen and Dining $ 31,010.00 Item Cor #43 Add Second Hand Wash Station in Dining Area for Second Serving Line $ 4,689.00 Item Cor #46 Add Millwork and Circuits to Accommodate Microwaves at Dining for Staff $ 3,710.00 Item Cor #47 Add Teacher Cubbies in Break Room $ 4,450.00 Item Cor #52 Change the Topcoat Finish Type of Paint $ no cost Item Cor#54 CCTV Manufacturer Change as now Required by Law $ 95,097.00 Item Cor#57 Provide the New Turning Lane now Approved by DOTD $ 250,535.00 Bid Changes as follows: The Original Contract Sum was

$22,085,000.00
$2,880.00
$22,502.00
$31,010.00
$4,689.00
$3,710.00
Committee item
Aug 19, 2021
Regular meeting
Change order Grant permission to accept Change Order No. 2 on the
Full text

A.14. Grant permission to accept Change Order No. 2 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 08/16/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #1 reflects the following changes: Item Cor #16 Additional Floor Boxes $ 14,530.00 Item Cor #19 Credit for Handsets & Admin Consoles <$ 7,679.00> Item Cor #20 Sound System $ 23,114.00 Item Cor #25 Add Tectum in Shared Space Bldg C & D Both Floors $ 75,393.00 Item Cor #26 Flooring Upgrades $699,111.00 Item Cor #30 Frame Metal Studs, Add New Window Frames (12 days) $ 14,384.00 Item Cor #36 Change LVT to CT at Restroom Vestibules $ 4,490.00 Item Cor #38 Way Finding Sign Changes $ 1,960.00 Item Cor #39 Toilet Accessories Changes $ 5,467.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ 371,062.00 The Contract Sum prior to this Change Order $ 22,456.00 The Contract Sum will be increased by $ 830,770.00 The new Contract Sum includ

$22,085,000.00
$14,530.00
$7,679.00
$23,114.00
$75,393.00
$699,111.00
Not recorded
Feb 23, 2021
Finance/Salary committee
Change order Grant permission to accept Change Order No. 1 on the Jennings Elementary
Full text

4. Grant permission to accept Change Order No. 1 on the Jennings Elementary Construction Project. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Permission was granted to accept the bid of Trahan Construction, LLC of $22,085,000.00. On 02/04/21, there was a change order made in the contract price due to changes made in the contract specifications. Change Order #1 reflects the following changes: Item Cor #2 Flood Insurance $ 6,500.00 Item Cor #3 Tree removal at North Property Line $ 8,320.00 Item Cor #4 Underground Conduit for Entergy $ 32,591.00 Item Cor #6 Foundation work for storage shed $ 29,172.00 Item Cor #7 Time Hurricane Laura and Delta (8 days) Item Cor #8 Truss Clips $ 34,238.00 Item Cor #10 Maintenance Shop/PE Storage $260,241.00 Bid Changes as follows: The Original Contract Sum was $22,085,000.00 The net change by previously orders $ .00 The Contract Sum prior to this Change Order $22,085,000.00 The Contract Sum will be increased by $ 371,062.00 The new Contract Sum including this Change Order will be $22,456,062.00 The Contract Time will be increased by twenty-two (22) days The new date of Substantial Completion will be April 17,

$22,085,000.00
$6,500.00
$8,320.00
$32,591.00
$29,172.00
$34,238.00
Committee item

Other construction and facility items 11 items naming this school (of 151 in the project), Apr 23, 2020 to Apr 18, 2024 · M.D. Descant; Detel Computer Solutions; Trahan Construction

Other construction and facility items: board items
MeetingTypeItemAmounts namedOutcome
Apr 18, 2024
Regular meeting
Bid Accept the lowest bid from Trahan Construction for Jennings
Full text

C.2. Accept the lowest bid from Trahan Construction for Jennings Elementary Improvements in the amount of $241,000.00. Other bids received from James H. Fontenot Construction ($267,000.00) and K & J Development ($265,000.00). To be paid from Ward II Construction and/or Ward II Contingency. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$241,000.00
$267,000.00
$265,000.00
Not recorded
Apr 16, 2024
Building committee
Bid Award of Jennings Elementary Improvements. Bids received
Full text

2. Award of Jennings Elementary Improvements. Bids received electronically on April 16th, 2024, at 2:00 P.M. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Dec 15, 2022
Regular meeting
Bid A resolution approving the acceptance of the bid for the purchase of One Million
Full text

6. A resolution approving the acceptance of the bid for the purchase of One Million Four Hundred Seventy-Five Thousand Dollars ($1,475,000) of General Obligation School Bonds, Series 2023, of School District No. 5 of the Parish of Jefferson Davis, State of Louisiana; and providing for other matters in connection therewith. MOTION BY: SECONDED BY: Consideration of a motion to amend as follows: RESOLUTION A resolution approving the acceptance of the bid of Robert W. Baird & Co., Inc. for the purchase of One Million Four Hundred Seventy-Five Thousand Dollars ($1,475,000) of General Obligation School Bonds, Series 2023, of School District No. 5 of the Parish of Jefferson Davis, State of Louisiana; and providing for other matters in connection therewith. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE Motion on Original Motion as amended: MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE ARC BORD BOUL BRUC CAP DEES DOB DOISE LEGER PERRY SEG SING TRAHAN *** ADDENDUM TO NEW BUSINESS 1. Consideration of a motion to grant permission to amend the 2022-23 School calendar to designate Monday, January 2, 2023 as a public holiday and that all locations will be closed in observance of

$1,475,000
$301
Not recorded
Sep 15, 2022
Regular meeting
Approval Approve the addition of the sidewalk for the south stairwell door
Full text

A.10. Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$9,000 Not recorded
Sep 15, 2022
Regular meeting
Approval Approve the addition of a Slimline structure for Staff covering at
Full text

A.9. Approve the addition of a Slimline structure for Staff covering at Jennings Elementary at a cost not to exceed $24,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,000 Not recorded
Sep 13, 2022
Finance/Salary committee
Approval Approve the addition of the sidewalk for the south stairwell door to the
Full text

10. Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$9,000 Committee item
Sep 13, 2022
Finance/Salary committee
Approval Approve the addition of a Slimline structure for Staff covering at Jennings
Full text

9. Approve the addition of a Slimline structure for Staff covering at Jennings Elementary at a cost not to exceed $24,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,000 Committee item
Jul 16, 2020
Regular meeting
Bid Bids were opened on June 23, 2020 for the construction of the new
Full text

A.3. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Grant permission to accept the bid of Trahan Construction, LLC of $22,085,000.00. Other bids received from M.D. Descant, LLC $23,758,000.00, Pat Williams Construction, LLC $22,400,000.00, Ratcliff Construction, LLC $23,137,000.00, Rudick Company, Inc. $25,500,000.00 and Southern Constructors, LLC $24,300,000.00 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$23,758,000.00
$22,400,000.00
$23,137,000.00
$25,500,000.00
$24,300,000.00
Not recorded
Jul 14, 2020
Finance/Salary committee
Bid Bids were opened on June 23, 2020 for the construction of the new Jennings
Full text

3. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Grant permission to accept the bid of Trahan Construction, LLC of $22,085,000.00. Other bids received from M.D. Descant, LLC $23,758,000.00, Pat Williams Construction, LLC $22,400,000.00, Ratcliff Construction, LLC $23,137,000.00, Rudick Company, Inc. $25,500,000.00 and Southern Constructors, LLC $24,300,000.00 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$23,758,000.00
$22,400,000.00
$23,137,000.00
$25,500,000.00
$24,300,000.00
Committee item
Apr 23, 2020
Regular meeting
Bid Bid packets for the construction of the new Jennings Elementary campus will
Full text

2. Bid packets for the construction of the new Jennings Elementary campus will be released for bid in the month of May with the current target date of May 8th.

— Not recorded
Apr 23, 2020
Regular meeting
Bid Bid packets for the construction of the new Jennings Elementary campus will be
Full text

2. Bid packets for the construction of the new Jennings Elementary campus will be released for bid in the month of May with the current target date of May 8th.

— Not recorded
All construction projects

Contracts & vendors

From the district's Act 370 reports to the state Treasury. A contract is listed for this school when the report gives the school's site code or when the contract's own description names the school or its community; contracts with no school or community named are listed as district-wide. Not every district contract may be in these reports.

—in contracts for this school only (0 contracts)
$0.00paid under this school's site code, January-June 2026

Shared and district-level contracts are listed below but are not added to this school's total, because the reports do not say what share belongs to each school.

School-specific contracts (0)

No contract in the published reports is for this school alone.

Shared contracts (0)

No contract in the published reports is linked to this school together with other named schools.

District-wide contracts (64)

Filed for the district as a whole, with no school or community named in the description. The 10 largest are shown.

  • Service Agreement District-wide
    FORECOMM SOLUTIONS

    Summer feeding program food boxes

    Contract maximum
    $1,300,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $1,328,177.70 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement District-wide
    SOUTHSIDE AUTOMOTIVE

    Maintenance and Repairs to Bus Fleet - 90 per hour labor, plus parts

    Contract maximum
    $350,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Standard Form of Agreement Between Owner and Architect District-wide
    Champeaux Evans Hotard Architects

    Architectural Services - State Fee Curve - Food Service Warehouse Project

    Contract maximum
    $253,524.00 District-level contract — individual school allocation not reported
    Dates
    Apr 1, 2026 – Dec 1, 2027
    Paid to this vendor
    $432,328.87 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement/Bid Contract District-wide
    Fleet Ritenet

    Fuel for Fleet under a 3 year agreement

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2024 – Jun 30, 2027
    Paid to this vendor
    $126,311.68 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement District-wide
    SYLVAN SPECIAL SYSTEMS

    Maintenance, Repairs and upgrades to security and fire systems

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Service Contract District-wide
    Young's Appliance

    Repairs and Maintenance on AC's throughout the district

    Contract maximum
    $250,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $63,026.30 all work, January-June 2026; the report does not tie payments to a contract
  • Service Agreement/Bid Contract District-wide
    the Tree House

    Ink supply bid winner - all printer ink

    Contract maximum
    $175,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • External Auditor Contract District-wide
    Gary Lambert

    Tax Assessment and Auditing Services for Sales Tax Dept - per hour

    Contract maximum
    $150,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    $122,474.36 all work, January-June 2026; the report does not tie payments to a contract
  • Service Contract District-wide
    MCNEESE STATE UNIVERSITY

    Dual Enrollment for High School Students $300-$360 per course

    Contract maximum
    $130,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)
  • Service Contract District-wide
    BISON COATINGS

    Roof Repairs and Coatings at Multiple Locations across the District

    Contract maximum
    $115,000.00 District-level contract — individual school allocation not reported
    Dates
    Jul 1, 2025 – Jun 30, 2026
    Paid to this vendor
    No payments reported (January-June 2026)

All 64

Source: the district's Act 370 reports to the Louisiana Department of the Treasury (R.S. 17:88.1), reporting periods January-June 2026. Last imported Nov 12, 2026 6:08 PM; Treasury's reporting page last checked Nov 26, 2026 5:53 PM. Treasury's Act 370 page and transparency portal

Contracts & vendors for the whole district

All board items mentioning this schoolBack to top

Agenda items whose text names this school, newest first (the 50 most recent). Each links to its meeting page.

This is not the school board's website

JeffDavisEdu.com is an independent public-information website created, owned and maintained by Brandon Kelley, a candidate for the Jefferson Davis Parish School Board, District 9. It is not operated, funded or endorsed by the Jefferson Davis Parish School Board.

For official school board information, go to www.jeffersondavis.org.

Go to the official website