Amounts are shown exactly as the agenda or minutes print them. They are not added together: a change order's figure is often the new total contract price, not extra money. "Outcome" is the board's vote as recorded in the minutes; committee agendas have no outcome because committees recommend and the full board decides.

Elton Elementary School

6 items, Jun 11, 2024 to Sep 19, 2024 · Elton Elementary School, Elton High School · Named contractor: Back Set

Elton Elementary School: board items
MeetingTypeItemAmounts namedOutcome
Sep 19, 2024
Regular meeting
Change order Grant permission to accept Change Order No. 4 on the JDPSB – Elton Elementary
Full text

A.12. Grant permission to accept Change Order No. 4 on the JDPSB – Elton Elementary School Project. Description: Change Order #4 – Extend the time for construction and provide labor and equipment required for the following: COR 11 New Asphalt Parking at South of Campus $128,000 COR 17 Additional Under Counter Cabinet at Reception $1,341 COR 18 Additional Room Signs at Existing Classrooms $2,380 COR 19 Wall Protection at Reception and Vestibule $5,521 COR 20 Re-laminate Existing Windowsills (4) $2,146 COR 21 Mini Blinds at Existing Windows (4) $1,229 COR 22 New Doors at Gymnasium $44,529 COR 23 Add Access Control to Back Set of Doors $11,825 COR 25 Additional Library Shelving $1,040 Details: Change Order #4 for $198,011.00 and adding days: 127 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 906,015.00 The Contract Sum prior to this Change Order $3,484,015.00 The Contract Sum will be increased by $ 198,011.00 The new Contract Sum including this Change Order will be $3,682,026.00 The Contract Time will be increased by one-hundred twenty-seven ( 127 ) days The new date of Substantial Completion will be January 9th, 2024 MOT

$128,000
$1,341
$2,380
$5,521
$2,146
$1,229
Not recorded
Sep 17, 2024
Finance/Salary committee
Change order Grant permission to accept Change Order No. 4 on the JDPSB – Elton Elementary School Project.
Full text

12. Grant permission to accept Change Order No. 4 on the JDPSB – Elton Elementary School Project. Description: Change Order #4 – Extend the time for construction and provide labor and equipment required for the following: COR 11 New Asphalt Parking at South of Campus $128,000 COR 17 Additional Under Counter Cabinet at Reception $1,341 COR 18 Additional Room Signs at Existing Classrooms $2,380 COR 19 Wall Protection at Reception and Vestibule $5,521 COR 20 Re-laminate Existing Windowsills (4) $2,146 COR 21 Mini Blinds at Existing Windows (4) $1,229 COR 22 New Doors at Gymnasium $44,529 COR 23 Add Access Control to Back Set of Doors $11,825 COR 25 Additional Library Shelving $1,040 Details: Change Order #4 for $198,011.00 and adding days: 127 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 906,015.00 The Contract Sum prior to this Change Order $3,484,015.00 The Contract Sum will be increased by $ 198,011.00 The new Contract Sum including this Change Order will be $3,682,026.00 The Contract Time will be increased by one-hundred twenty-seven ( 127 ) days The new date of Substantial Completion will be January 9th, 2024 MOTIO

$128,000
$1,341
$2,380
$5,521
$2,146
$1,229
Committee item
Jul 18, 2024
Regular meeting
Change order Grant permission to accept Change Order No. 3 on the JDPSB –
Full text

A.4. Grant permission to accept Change Order No. 3 on the JDPSB – Elton Elementary School Project. Description: Change Order #3 – K&J Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #4 – Secure Vestibule and Hallway Doors at Elton High School - $60,881 COR #8 – CREDIT for Roofing (Canopy) and Electrical Work – ($50,329) COR #9 – Additional work for new Slab Parking Lot - $48,308 Details: Change Order #3 for $58,860.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 847,155.00 The Contract Sum prior to this Change Order $3,425,155.00 The Contract Sum will be increased by $ 58,860.00 The new Contract Sum including this Change Order will be $3,484,015.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be September 4th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$60,881
$50,329
$48,308
$58,860.00
$2,578,000.00
$847,155.00
Not recorded
Jul 16, 2024
Finance/Salary committee
Change order Grant permission to accept Change Order No. 3 on the JDPSB – Elton
Full text

4. Grant permission to accept Change Order No. 3 on the JDPSB – Elton Elementary School Project. Description: Change Order #3 – K&J Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #4 – Secure Vestibule and Hallway Doors at Elton High School - $60,881 COR #8 – CREDIT for Roofing (Canopy) and Electrical Work – ($50,329) COR #9 – Additional work for new Slab Parking Lot - $48,308 Details: Change Order #3 for $58,860.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 847,155.00 The Contract Sum prior to this Change Order $3,425,155.00 The Contract Sum will be increased by $ 58,860.00 The new Contract Sum including this Change Order will be $3,484,015.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be September 4th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$60,881
$50,329
$48,308
$58,860.00
$2,578,000.00
$847,155.00
Committee item
Jun 13, 2024
Regular meeting
Change order Grant permission to accept Change Order No. 2 on the JDPSB -
Full text

C.3. Grant permission to accept Change Order No. 2 on the JDPSB - Elton Elementary School Project. Change Order #2 for $147,758.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 699,397.00 The Contract Sum prior to this Change Order $3,277,397.00 The Contract Sum will be increased by $ 147,758.00 The new Contract Sum including this Change Order will be $3,425,155.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be September 4, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$147,758.00
$2,578,000.00
$699,397.00
$3,277,397.00
$3,425,155.00
Not recorded
Jun 11, 2024
Building committee
Change order Grant permission to accept Change Order No. 2 on the JDPSB -
Full text

3. Grant permission to accept Change Order No. 2 on the JDPSB - Elton Elementary School Project. Change Order #2 for $147,758.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,578,000.00 The net change by previously orders $ 699,397.00 The Contract Sum prior to this Change Order $3,277,397.00 The Contract Sum will be increased by $ 147,758.00 The new Contract Sum including this Change Order will be $3,425,155.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be September 4, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$147,758.00
$2,578,000.00
$699,397.00
$3,277,397.00
$3,425,155.00
Committee item

Elton Elementary Cafeteria Renovation

4 items, Jul 16, 2024 to Sep 19, 2024 · Elton Elementary School

Elton Elementary Cafeteria Renovation: board items
MeetingTypeItemAmounts namedOutcome
Sep 19, 2024
Regular meeting
Change order Grant permission to accept Change Order No. 2 on the JDPSB – Elton Elementary
Full text

A.11. Grant permission to accept Change Order No. 2 on the JDPSB – Elton Elementary Cafeteria Renovation Project. Description: Change Order #2 – Extend the time for construction by 35 days for a new Substantial Completion date of September 30th. Details: Change Order #2 for $0.00 and adding days: 35 days Bid Changes as follows: The Original Contract Sum was $360,000.00 The net change by previously orders $ 50,329.00 The Contract Sum prior to this Change Order $410,329.00 The Contract Sum will be increased by $ 0.00 The new Contract Sum including this Change Order will be Unchanged. The Contract Time will be increased by zero ( 35) days The new date of Substantial Completion will be September 30th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$0.00
$360,000.00
$50,329.00
$410,329.00
Not recorded
Sep 17, 2024
Finance/Salary committee
Change order Grant permission to accept Change Order No. 2 on the JDPSB – Elton Elementary Cafeteria
Full text

11. Grant permission to accept Change Order No. 2 on the JDPSB – Elton Elementary Cafeteria Renovation Project. Description: Change Order #2 – Extend the time for construction by 35 days for a new Substantial Completion date of September 30th. Details: Change Order #2 for $0.00 and adding days: 35 days Bid Changes as follows: The Original Contract Sum was $360,000.00 The net change by previously orders $ 50,329.00 The Contract Sum prior to this Change Order $410,329.00 The Contract Sum will be increased by $ 0.00 The new Contract Sum including this Change Order will be Unchanged. The Contract Time will be increased by zero ( 35) days The new date of Substantial Completion will be September 30th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$0.00
$360,000.00
$50,329.00
$410,329.00
Committee item
Jul 18, 2024
Regular meeting
Change order Grant permission to accept Change Order No. 1 on the JDPSB –
Full text

A.5. Grant permission to accept Change Order No. 1 on the JDPSB – Elton Elementary Cafeteria Renovation Project. Description: Change Order #1 – K&J Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) - COR #1 – Additional Roofing (Canopy) and Electrical Work. Details: Change Order #1 for $50,329.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $360,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $360,000.00 The Contract Sum will be increased by $ 50,329.00 The new Contract Sum including this Change Order will be $410,329.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be August 26th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$50,329.00
$360,000.00
$0.00
$410,329.00
Not recorded
Jul 16, 2024
Finance/Salary committee
Change order Grant permission to accept Change Order No. 1 on the JDPSB – Elton
Full text

5. Grant permission to accept Change Order No. 1 on the JDPSB – Elton Elementary Cafeteria Renovation Project. Description: Change Order #1 – K&J Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) - COR #1 – Additional Roofing (Canopy) and Electrical Work. Details: Change Order #1 for $50,329.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $360,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $360,000.00 The Contract Sum will be increased by $ 50,329.00 The new Contract Sum including this Change Order will be $410,329.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be August 26th, 2024 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$50,329.00
$360,000.00
$0.00
$410,329.00
Committee item

Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work

3 items, May 7, 2024 to May 9, 2024 · Elton Elementary School

Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work: board items
MeetingTypeItemAmounts namedOutcome
May 9, 2024
Regular meeting
Change order Accept Change Order No. 1 on the Jefferson Davis Parish
Full text

C.2. Accept Change Order No. 1 on the Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work Project in the amount of $699,397.00 as follows. Change Order #1 Consists of the Following: Change Order Request #1 – Interior modifications of the existing Elton classroom building. 1. Conversion of a classroom to a Library with all associated shelving and technology. 2. Conversion of a classroom to a teachers lounge.

$699,397.00 Not recorded
May 7, 2024
Finance/Salary committee
Change order Accept Change Order No. 1 on the Jefferson Davis Parish School Board Elton
Full text

8. Accept Change Order No. 1 on the Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work Project in the amount of $699,397.00. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$699,397.00 Committee item
May 7, 2024
Building committee
Change order Award of bid on EES Cafeteria Project. Bids to be opened on
Full text

1. Award of bid on EES Cafeteria Project. Bids to be opened on Tuesday, May 7, 2024 at 2:00 P.M. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE 8. Accept Change Order No. 1 on the Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work Project in the amount of $699,397.00. MOTIONBY: SECONDEDBY: ADDENDUM 1. Accept Change Order No. 1 on the Jefferson Davis Parish School Board Elton Demolition/Additional Summer Work Project in the amount of $699,397.00 as follows. Change Order #1 Consists of the Following: Change Order Request #1 – Interior modifications of the existing Elton classroom building. 1. Conversion of a classroom to a Library with all associated shelving and technology.

$699,397.00 Committee item

Other construction and facility items

151 items, Jul 17, 2018 to Nov 19, 2026 · Elton Elementary School, Elton High School, Fenton Elementary School, Hathaway High School, Jennings Elementary School, Jennings High School, Lacassine High School, Lake Arthur Elementary School, Lake Arthur High School, Welsh Elementary School, Welsh High School, Welsh-Roanoke Junior High School · Named contractors: Acme Refrigeration; Annex Bldg; Butcher Distributors; CSS; Champeaux; Dale Leger; Detel Computer Solutions; Dugas Builders; Dupuis Construction; Dyna-Play; EA Builders; Efficient Air Systems; Glenn Vanicor Builders; Gunter Construction; K & J Development; Kenner; M.D. Descant; MorCore Roofing; Murphy Cormier; Pat Williams Construction; Prince Fence; Quill; Solar Supply; T-Mobile; Taylor Power Systems; Trahan Construction; Trouth Air Conditioning

Other construction and facility items: board items
MeetingTypeItemAmounts namedOutcome
Nov 19, 2026
Regular meeting
Bid HHS FENCE PROJECT
Full text

1.3. HHS FENCE PROJECT Consideration to accept the bid of $10,592.83 from Prince Fence, LLC to secure the west perimeter of the HHS school campus near the west playground area. Other bids received from Amko Fence & Steel $10,900.00 and A-1 American Fencing, Inc. $15,670.00. To be funded by a Safety grant awarded to school. Motion: Second: Public Discussion: Board Discussion: Vote:

$10,592.83
$10,900.00
$15,670.00
Not recorded
Nov 19, 2026
Regular meeting
Change order Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project.
Full text

1.2. Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project. Consideration to accept Change Order No. 2 on the Welsh Bond Improvements – Phase 2 – WHS & WAR project. Description: Change Order #2 – K&J Development of SWLA will provide labor and equipment required for the following (refer to attached backup for additional information) COR #4 – Running of new fiber by Conterra. $20,176, Add 0 Days. COR #5- Provide power to Annex Bldg for HVAC & Lights at N. $20.386, Add 0 Days. COR #18 – Wiring for 6 cameras, & door release buttons. $3,229.00, Add 0 Days. Details: Change Order #2 for $43,791.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,408,000.00 The net change by previous orders was $536,415.00 The Contract Sum prior to this Change Order was $2,944,415.00 The Contract Sum will be increased by $43,791.00 The new Contract Sum including this Change Order will be $2,988,206.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be February 20, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$20,176
$20.38
$3,229.00
$43,791.00
$2,408,000.00
$536,415.00
Not recorded
Nov 19, 2026
Regular meeting
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1.1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 — Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41 — Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previous orders was $834,462.00 The Contract Sum prior to this Change Order was $5,533,462.00 The Contract Sum will be increased by $67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Not recorded
Nov 17, 2026
Finance committee
Bid HHS FENCE PROJECT
Full text

3. HHS FENCE PROJECT Consideration to accept the bid of $10,592.83 from Prince Fence, LLC to secure the west perimeter of the HHS school campus near the west playground area. Other bids received from Amko Fence & Steel $10,900.00 and A-1 American Fencing, Inc. $15,670.00. To be funded by a Safety grant awarded to school. Motion: Second: Public Discussion: Board Discussion: Vote:

$10,592.83
$10,900.00
$15,670.00
Committee item
Nov 17, 2026
Finance committee
Change order Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project.
Full text

2. Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project. Consideration to accept Change Order No. 2 on the Welsh Bond Improvements – Phase 2 – WHS & WAR project. Description: Change Order #2 – K&J Development of SWLA will provide labor and equipment required for the following (refer to attached backup for additional information) COR #4 – Running of new fiber by Conterra. $20,176, Add 0 Days. COR #5- Provide power to Annex Bldg for HVAC & Lights at N. $20.386, Add 0 Days. COR #18 – Wiring for 6 cameras, & door release buttons. $3,229.00, Add 0 Days. Details: Change Order #2 for $43,791.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,408,000.00 The net change by previously orders $ 536,415.00 The Contract Sum prior to this Change Order $2,944,415.00 The Contract Sum will be increased by $ 43,791.00 The new Contract Sum including this Change Order will be $2,988,206.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be February 20, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$20,176
$20.38
$3,229.00
$43,791.00
$2,408,000.00
$536,415.00
Committee item
Nov 17, 2026
Finance committee
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 - Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41- Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 834,462.00 The Contract Sum prior to this Change Order $5,533,462.00 The Contract Sum will be increased by $ 67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Committee item
Nov 17, 2026
Finance committee
Bid HHS FENCE PROJECT
Full text

1.3. HHS FENCE PROJECT Consideration to accept the bid of $10,592.83 from Prince Fence, LLC to secure the west perimeter of the HHS school campus near the west playground area. Other bids received from Amko Fence & Steel $10,900.00 and A-1 American Fencing, Inc. $15,670.00. To be funded by a Safety grant awarded to school. Motion: Second: Public Discussion: Board Discussion: Vote:

$10,592.83
$10,900.00
$15,670.00
Committee item
Nov 17, 2026
Finance committee
Change order Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project.
Full text

1.2. Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase 2 Project. Consideration to accept Change Order No. 2 on the Welsh Bond Improvements – Phase 2 – WHS & WAR project. Description: Change Order #2 – K&J Development of SWLA will provide labor and equipment required for the following (refer to attached backup for additional information) COR #4 – Running of new fiber by Conterra. $20,176, Add 0 Days. COR #5- Provide power to Annex Bldg for HVAC & Lights at N. $20.386, Add 0 Days. COR #18 – Wiring for 6 cameras, & door release buttons. $3,229.00, Add 0 Days. Details: Change Order #2 for $43,791.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,408,000.00 The net change by previously orders $ 536,415.00 The Contract Sum prior to this Change Order $2,944,415.00 The Contract Sum will be increased by $ 43,791.00 The new Contract Sum including this Change Order will be $2,988,206.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be February 20, 2027 Motion: Second: Public Discussion: Board Discussion: Vote:

$20,176
$20.38
$3,229.00
$43,791.00
$2,408,000.00
$536,415.00
Committee item
Nov 17, 2026
Finance committee
Change order Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project.
Full text

1.1. Change Order No. 3 on the JDPSB – Welsh Bond Improvements – Phase 1 Project. Consideration to accept Change Order No. 3 on the Welsh Bond Improvements – Phase 1 - Welsh Upper Elementary School project. Description: Change Order #3 – Trahan Construction will provide labor and equipment required for the following: (refer to attached backup for additional information) COR #40 – Fence at Front of WES. $50,744, Add 30 Days. COR #41- Contract Time Extension. $0.00, Add 100 Days. COR #43 – 2nd Grade Annex East Door Upgrade. $16,390.00, Add 30 Days. Details: Change Order #3 for $67,134.00 and adding days: 160 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 834,462.00 The Contract Sum prior to this Change Order $5,533,462.00 The Contract Sum will be increased by $ 67,134.00 The new Contract Sum including this Change Order will be $5,600,596.00 The Contract Time will be increased by one hundred sixty ( 160 ) days The new date of Substantial Completion will be May 1, 2027 Motion: Second: Public Discussion: 1 Board Discussion: Vote:

$50,744
$0.00
$16,390.00
$67,134.00
$4,699,000.00
$834,462.00
Committee item
Oct 15, 2026
Regular meeting
Update Steve Hotard - Construction Project Updates
Full text

2. Steve Hotard - Construction Project Updates

— Not recorded
Sep 17, 2026
Regular meeting
Quote JWCE purchase of AC system for gymnasium
Full text

A.4. JWCE purchase of AC system for gymnasium e Grant permission to JWCE to purchase a 10 ton Trane air conditioning unit system for the gym from Butcher Distributors, Inc. AC at a cost of $14,233.00 (direct replacement). Other quotes receive from Young's AC $15,900.00 (direct replacement), Solar Air 10 ton York unit $13,143.04 (would require sheet metal work) and Acme refrigeration 10 ton Rheem $10,684.34(would require sheet metal work). Sheet metal work to adapt unit would be more than the savings of the cheaper units. All prices do not include installation. To be paid from the General Fund. Motion: Second: Public Discussion: Board Discussion: Vote:

$14,233.00
$15,900.00
$13,143.04
$10,684.34
Approved
unanimously approved
Sep 15, 2026
Finance committee
Quote JWCE purchase of AC system for gymnasium
Full text

4. JWCE purchase of AC system for gymnasium Grant permission to JWCE to purchase a 10 ton Trane air conditioning unit system for the gym from Butcher Distributors, Inc. AC at a cost of $14,233.00 (direct replacement). Other quotes receive from Young's AC $15,900.00 (direct replacement), Solar Air 10 ton York unit $13,143.04 (would require sheet metal work) and Acme refrigeration 10 ton Rheem $10,684.34(would require sheet metal work). Sheet metal work to adapt unit would be more than the savings of the cheaper units. All prices do not include installation. To be paid from the General Fund. Motion: Second: Public Discussion: Board Discussion: Vote:

$14,233.00
$15,900.00
$13,143.04
$10,684.34
Committee item
Jul 16, 2026
Regular meeting
Bid Child Nutrition Program 2026-27 Milk and Milk Products bid
Full text

1.I. Child Nutrition Program 2026-27 Milk and Milk Products bid © Consideration to accept the bid for Child Nutrition Program 2026-27 Milk and Milk Products. Bids to be opened on July 16, 2026 at 10:00 am. SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Approved
unanimously approved
May 21, 2026
Regular meeting
Bid Consideration to accept the catalog bid from The Tree House for the
Full text

A.9. Consideration to accept the catalog bid from The Tree House for the 2026-2027 JDPSB Parishwide Computer Printing Supplies bid. The Tree House's bid was discounted ranging from 10%-43% with an average discount of 25.91%. Other bids received: The Office Guy which offered discounts ranging from 10%-30% with an average discount of 20.41% and Repair Depot which did not meet the bid requirements. Sealed bids were opened on Monday, May 18, 2026 @ 10:00 a.m. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
May 21, 2026
Regular meeting
Change order Consideration to grant permission to accept Change Order No. 2 on
Full text

A.7. Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project. Description: Change Order #2 – Trahan Construction will provide labor and equipment required for the following: - COR #10 – Data and Outlet Revisions at Classrooms. $26,35.00 - COR #14 – Additional Exterior Cameras. $13,120.00 - COR #15 – Provide Access Control at WES West Entrance at Circle Drive. $10,069.00 - COR #16 – Provide Wiring to separate existing camera system from overall school network. $6,568.00 - COR #21 – Related to RFP 3 – Demolition of Existing Brown Hall and Associated Build Back including Ramps and Sidewalks. $237,373.00 - COR #22 – Related to RFP 3 – Aluminum Canopy Associated with Build Back Ramps and Sidewalks. $121,893.00 - COR #23 – Related to RFP 3 – Welsh Elementary Secure Vestibule with Access Control & Fortification. $151,221.00 Details: Change Order #2 for $566,596.00 and adding days: 80 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 267,866.00 The Contract Sum prior to this Change Order $4,966,866.00 The Contract Sum will be increased by $ 566,596.00 The new Contrac

$26
$13,120.00
$10,069.00
$6,568.00
$237,373.00
$121,893.00
Not recorded
May 21, 2026
Regular meeting
Change order Consideration to grant permission to accept Change Order No. 1 on the
Full text

A.6. Consideration to grant permission to accept Change Order No. 1 on the JDPSB – Welsh Bond Improvements – Phase II Project. Description: Change Order #1 – K&J Development of SWLA, LLC will provide labor and equipment required for the following: - COR #1 – Provide and Install New Fire Alarms Systems at Welsh High School and Welsh Roanoke Jr. High School. $255,760.00 - COR #2 – Provide Vestibule Fortification Security at Welsh High School and Welsh Roanoke Jr. High School. $15,759.00 - COR #3 – Provide and Install Intercom System at Welsh High School and Welsh Roanoke Jr. High School. $264,896.00 Details: Change Order #1 for $536,415.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,408,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $2,408,000.00 The Contract Sum will be increased by $ 536,415.00 The new Contract Sum including this Change Order will be $2,944,415.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be February 20, 2027 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$255,760.00
$15,759.00
$264,896.00
$536,415.00
$2,408,000.00
$0.00
Not recorded
May 21, 2026
Regular meeting
Bid Consideration of accepting the following Child Nutrition bids on the
Full text

A.2. Consideration of accepting the following Child Nutrition bids on the following small items for the 2026-2027 School Year: Milk and Milk Products: Prairie Farms $340,466 Bread and Bakery Products: Flowers $38,000 Chilled & Frozen Meat Items: Gold Star - Chicken Strips, Whole Muscle, WG Breaded $113.57; Chicken, Grilled, Fillet $45.92; Sandwich, IW Pancake, Sausage and Cheese $159.67; Turkey Medallions $55.07; Turkey Franks $24.44; Tortilla, Beef and Cheese, WG, Bulk $66.23; Sandwich, WG Turkey Ham and Cheese Croissant, IW $104.33; Salisbury Steak $154.33; Low Sodium, Bias Cut, Hickory Smoked Sausage $30.47; Chicken Corn Dog on Stick, Bulk, Lower Fat $46.86; Cheese, American, Shredded, Reduced Fat $68.11; Cheese, American, Sliced, Reduced Fat $52.34; Burrito, Cheese, Egg, and Turkey Sausage, Breakfast, IW, WG $111.23; Breakfast Pizza Squares-WG Turkey Sausage Cheese, IW $63.89; Beef, Ground $111.79; Onion Rings, WG $83.81; Meatball, Beef $126.19 Lacassigne - Breakfast Scrambler $63.90; Sauce, Cheese, RF $86.50; Chicken, Diced Frozen $40.80; Chicken, Fillet, Dill Seasoned, Fully Cooked $91.70 Chilled $ Frozen Fruit Juices, Bakery Items, Vegetables: William George - Bagel, WG, Blu

$340,466
$38,000
$113.57
$45.92
$159.67
$55.07
Not recorded
May 19, 2026
Finance/Salary committee
Bid Consideration to accept the catalog bid from The Tree House for the 2026-2027
Full text

9. Consideration to accept the catalog bid from The Tree House for the 2026-2027 JDPSB Parishwide Computer Printing Supplies bid. The Tree House's bid was discounted ranging from 10%-43% with an average discount of 25.91%. Other bids received: The Office Guy which offered discounts ranging from 10%-30% with an average discount of 20.41% and Repair Depot which did not meet the bid requirements. Sealed bids were opened on Monday, May 18, 2026 @ 10:00 a.m. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
May 19, 2026
Finance/Salary committee
Change order Consideration to grant permission to accept Change Order No. 2 on the JDPSB –
Full text

7. Consideration to grant permission to accept Change Order No. 2 on the JDPSB – Welsh Bond Improvements – Phase I Project. Description: Change Order #2 – Trahan Construction will provide labor and equipment required for the following: - COR #10 – Data and Outlet Revisions at Classrooms. $26,35.00 - COR #14 – Additional Exterior Cameras. $13,120.00 - COR #15 – Provide Access Control at WES West Entrance at Circle Drive. $10,069.00 - COR #16 – Provide Wiring to separate existing camera system from overall school network. $6,568.00 - COR #21 – Related to RFP 3 – Demolition of Existing Brown Hall and Associated Build Back including Ramps and Sidewalks. $237,373.00 - COR #22 – Related to RFP 3 – Aluminum Canopy Associated with Build Back Ramps and Sidewalks. $121,893.00 - COR #23 – Related to RFP 3 – Welsh Elementary Secure Vestibule with Access Control & Fortification. $151,221.00 Details: Change Order #2 for $566,596.00 and adding days: 80 days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 267,866.00 The Contract Sum prior to this Change Order $4,966,866.00 The Contract Sum will be increased by $ 566,596.00 The new Contract

$26
$13,120.00
$10,069.00
$6,568.00
$237,373.00
$121,893.00
Committee item
May 19, 2026
Finance/Salary committee
Change order Consideration to grant permission to accept Change Order No. 1 on the JDPSB –
Full text

6. Consideration to grant permission to accept Change Order No. 1 on the JDPSB – Welsh Bond Improvements – Phase II Project. Description: Change Order #1 – K&J Development of SWLA, LLC will provide labor and equipment required for the following: (refer to attached backup for additional information) - COR #1 – Provide and Install New Fire Alarms Systems at Welsh High School and Welsh Roanoke Jr. High School. $255,760.00 - COR #2 – Provide Vestibule Fortification Security at Welsh High School and Welsh Roanoke Jr. High School. $15,759.00 - COR #3 – Provide and Install Intercom System at Welsh High School and Welsh Roanoke Jr. High School. $264,896.00 Details: Change Order #1 for $536,415.00 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $2,408,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $2,408,000.00 The Contract Sum will be increased by $ 536,415.00 The new Contract Sum including this Change Order will be $2,944,415.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be February 20, 2027 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$255,760.00
$15,759.00
$264,896.00
$536,415.00
$2,408,000.00
$0.00
Committee item
May 19, 2026
Finance/Salary committee
Bid Consideration of accepting the following Child Nutrition bids on the following small
Full text

2. Consideration of accepting the following Child Nutrition bids on the following small items for the 2026-2027 School Year: Milk and Milk Products: Prairie Farms $340,466 Bread and Bakery Products: Flowers $38,000 Chilled & Frozen Meat Items: Gold Star - Chicken Strips, Whole Muscle, WG Breaded $113.57; Chicken, Grilled, Fillet $45.92; Sandwich, IW Pancake, Sausage and Cheese $159.67; Turkey Medallions $55.07; Turkey Franks $24.44; Tortilla, Beef and Cheese, WG, Bulk $66.23; Sandwich, WG Turkey Ham and Cheese Croissant, IW $104.33; Salisbury Steak $154.33; Low Sodium, Bias Cut, Hickory Smoked Sausage $30.47; Chicken Corn Dog on Stick, Bulk, Lower Fat $46.86; Cheese, American, Shredded, Reduced Fat $68.11; Cheese, American, Sliced, Reduced Fat $52.34; Burrito, Cheese, Egg, and Turkey Sausage, Breakfast, IW, WG $111.23; Breakfast Pizza Squares-WG Turkey Sausage Cheese, IW $63.89; Beef, Ground $111.79; Onion Rings, WG $83.81; Meatball, Beef $126.19 Lacassigne - Breakfast Scrambler $63.90; Sauce, Cheese, RF $86.50; Chicken, Diced Frozen $40.80; Chicken, Fillet, Dill Seasoned, Fully Cooked $91.70 Chilled $ Frozen Fruit Juices, Bakery Items, Vegetables: William George - Bagel, WG, Blueb

$340,466
$38,000
$113.57
$45.92
$159.67
$55.07
Committee item
Nov 20, 2025
Regular meeting
Approval Declare the following Child Nutrition Programs Warehouse items as surplus and
Full text

1. Declare the following Child Nutrition Programs Warehouse items as surplus and send to the next available public auction: 1. Hytrol Conveyor (Model BA, Serial Number 175375)

— Approved
unanimously carried
Nov 20, 2025
Regular meeting
Change order Grant permission to accept Change Order No. 1 on the JDPSB
Full text

A.9. Grant permission to accept Change Order No. 1 on the JDPSB – Welsh Bond – Phase 1 – Welsh Upper Elementary. Description: Change Order #1 – Trahan Construction will provide labor, equipment and supervision required for the following: (refer to attached backup for additional information) -COR 4R1 – Change all VCT flooring to LVT. - $95,617.00 -COR #5 – Upgrade entire elementary school campus fire alarm system. $172,249.00 Details: Change Order #1 for $267,866.00 and adding days: Thirty (30) days Bid Changes as follows: The Original Contract Sum was $4,699,000.00. The net change by previously orders: $0.00 The Contract Sum prior to this Change Order: $4,699,000.00 The Contract Sum will be increased by: $267,866.00 The new Contract Sum including this Change Order will be $4,966,866.00. The Contract Time will be increased by thirty (30) days. The new date of Substantial Completion will be September 3, 2026. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE INFORMATION DISCUSSED AT FINANCE: 1. Finance Director Christin LeGros reviewed the 2024-2025 Financial Risk Assessment for the fiscal year 2023-2024. 2. Discussion on the potential sale of the JDPSB's spectrum licenses and p

$95,617.00
$172,249.00
$267,866.00
$4,699,000.00
$0.00
$4,966,866.00
Not recorded
Nov 20, 2025
Regular meeting
Quote Grant permission to JHS to accept the quote from EA Builders
Full text

A.5. Grant permission to JHS to accept the quote from EA Builders for $22,180.00 to replace the chain link softball field outfield fence with a new metal wall that will be moved in from 247 to 205 feet to make the softball field a standard size. Other quotes received from Scout Metal Construction and Supply for $29,303.00 and Gunter Construction, Inc. for $44,608.00. To be paid from Ward II Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,180.00
$29,303.00
$44,608.00
Not recorded
Nov 18, 2025
Finance/Salary committee
Change order Grant permission to accept Change Order No. 1 on the JDPSB – Welsh
Full text

9. Grant permission to accept Change Order No. 1 on the JDPSB – Welsh Bond – Phase 1 – Welsh Upper Elementary. Description: Change Order #1 – Trahan Construction will provide labor, equipment and supervision required for the following: (refer to attached backup for additional information) - COR 4R1 – Change all VCT flooring to LVT. - $95,617.00 - COR #5 – Upgrade entire elementary school campus fire alarm system. $172,249.00 Details: Change Order #1 for $267,866.00 and adding days: Thirty (30) days Bid Changes as follows: The Original Contract Sum was $4,699,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $4,699,000.00 The Contract Sum will be increased by $ 267,866.00 The new Contract Sum including this Change Order will be $4,966,866.00 The Contract Time will be increased by thirty ( 30 ) days The new date of Substantial Completion will be September 3, 2026 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$95,617.00
$172,249.00
$267,866.00
$4,699,000.00
$0.00
$4,966,866.00
Committee item
Nov 18, 2025
Finance/Salary committee
Quote Grant permission to JHS to accept the quote from Gunter Construction for
Full text

6. Grant permission to JHS to accept the quote from Gunter Construction for $168,500.00 to replace the softball and baseball field back stops. The baseball field backstop was blown down during a wind event in the spring and the softball field backstop is not sufficient enough to keep foul balls in the field of play. The project will include demo/cleanup of existing backstops, pour new footings where needed, build new cinder block walls with precast caps, and add a suspending net system on both fields. Other quotes Nets of Texas/Sam Istre Construction for $169,480.00 and Alfred Palma for $183,000.00. To be paid from Ward II Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$168,500.00
$169,480.00
$183,000.00
Committee item
Nov 18, 2025
Finance/Salary committee
Quote Grant permission to JHS to accept the quote from EA Builders for $22,180.00 to
Full text

5. Grant permission to JHS to accept the quote from EA Builders for $22,180.00 to replace the chain link softball field outfield fence with a new metal wall that will be moved in from 247 to 205 feet to make the softball field a standard size. Other quotes received from Scout Metal Construction and Supply for $29,303.00 and Gunter Construction, Inc. for $44,608.00. To be paid from Ward II Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,180.00
$29,303.00
$44,608.00
Committee item
Nov 18, 2025
Finance/Salary committee
Quote Grant permission to JHS to accept the quote from EA Builders for $11,740.00 to
Full text

4. Grant permission to JHS to accept the quote from EA Builders for $11,740.00 to repair 100 feet of baseball field wall that was blown down during a wind event in the spring. Other quotes received from Scout Metal Construction and Supply for $11,800.00, and Gunter Construction, Inc. for $34,600.00. To be paid from Ward II Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$11,740.00
$11,800.00
$34,600.00
Committee item
Oct 14, 2025
Finance/Salary committee
Change order Grant permission to accept Change Order No. 3 on the JDPSB – Jennings
Full text

6. Grant permission to accept Change Order No. 3 on the JDPSB – Jennings Ward II Improvements, Phase 4 – Jerry Simmons Stadium. Description: Change Order #3 – Alfred Palma Construction will provide labor, equipment and supervision required for the following: (refer to attached backup for additional information) - COR #31 – Complete repairs to the stadium, including aluminum seat planks, visitor entrance gate , visitor-field gate, fencing under the press box, revisions to the decorative sidewalk gate and fence near the Field House, and modifications to existing structural steel members as necessary to achieve acceptable headroom clearances beneath the new press box. Details: Change Order #3 for $28,175.72 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $3,046,000.00 The net change by previously orders $ 558,715.28 The Contract Sum prior to this Change Order $3,604,715.28 The Contract Sum will be increased by $ 28,175.72 The new Contract Sum including this Change Order will be $3,632,891.00 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be December 31, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSS

$28,175.72
$3,046,000.00
$558,715.28
$3,604,715.28
$3,632,891.00
Committee item
Aug 19, 2025
Finance/Salary committee
Change order Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish
Full text

12. Grant permission to accept Change Order No. 3 on the Jefferson Davis Parish School Board Hurricane Laura Damages Restoration Program JDPSB- EES, EHS, FES, WES, WHS WRJHS Description: Change Order #3 – Labor Credit for FES Translucent Roofing/Roof Hung Light Fixtures Bid Changes as follows: The Original Contract Sum was $1,799,000.00 The net change by previously orders $- 147,578.00 Contract Sum Prior to this Change Order $1,651,422.00 Contract Sum will be decreased by $ 1,269.00 The new Contract Sum $1,650,153.00 Contract Time will be unchanged Revised Contract Completion Date August 16, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$1,799,000.00
$1,651,422.00
$1,269.00
$1,650,153.00
Committee item
Aug 19, 2025
Finance/Salary committee
Change order Grant permission to accept Change Order No. No. 2on the JDPSB – Jennings
Full text

11. Grant permission to accept Change Order No. No. 2on the JDPSB – Jennings Ward II Improvements – Phase 4 – Jerry Simmons Stadium Improvements Project. Description: Change Order #1 COR #20- Add cameras at nine (9) locations =$37,436.62 COR #22 – Repainting Stadium = $61,955.45 COR #24 – Visitor Side ADA Ramp = $32,820.14 COR #25 – Additional Fencing @ East and North Perimeter = $68,887.50 Details: Change Order #2 for $201,099.71 and adding days: 86 days Bid Changes as follows: The Original Contract Sum was $3,046,000.00 The net change by previously orders $ 357,615.57 The Contract Sum prior to this Change Order $3,403,615.57 The Contract Sum will be increased by $ 201,099.71 The new Contract Sum including this Change Order will be $3,604,715.28 The Contract Time will be increased by eighty-six ( 86 ) days The new date of Substantial Completion will be December 31, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$37,436.62
$61,955.45
$32,820.14
$68,887.50
$201,099.71
$3,046,000.00
Committee item
Jul 15, 2025
Finance/Salary committee
Quote Grant permission to repair the roof at WES. Three quotes were received for
Full text

7. Grant permission to repair the roof at WES. Three quotes were received for Welsh Elementary main building flat roof coating project which included Louisiana Roof Coatings, Bison Coatings & Foams LLC, and Premier Service Team LLC. All three companies have been on site to gather information for quotes. Louisiana Roof Coating quoted $52,400 with a 10-year manufacturer’s warranty for material and labor. Bison Coatings and Foam LLC quoted $28,045.60 with a 20-year manufacturer’s warranty on material and 2-year labor warranty by contractor. Premier Service Team quoted $59,970 with a 12-year labor and material warranty. Due to the lowest quote and longest warranty, we recommend going with Bison Coatings & Foams LLC. To be paid from the General Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$52,400
$28,045.60
$59,970
Committee item
May 8, 2025
Regular meeting
Change order Grant permission to accept Change Order No. 1 on the JDPSB –
Full text

F.8. Grant permission to accept Change Order No. 1 on the JDPSB – Jennings Ward II Improvements – Phase 4 – Jerry Simmons Stadium Improvements Project. Description: Change Order #1 – Alfred Palma will provide labor and equipment required for the following: (refer to attached backup for additional information) - COR #3 – Upgrade R Panel Roof to Standing Seam Roof. $93,605.24. - COR #7 – Garrison Boring to Entergy Pad Mount Transformer. $9,757.10 - COR #12 – Press box Expansion and Elevation. $248,136.53 - COR #15 – Backflow Relocation. $6,116.70 Details: Change Order #1 for $357,615.57 and adding days: 0 days Bid Changes as follows: The Original Contract Sum was $3,046,000.00 The net change by previously orders $ 0.00 The Contract Sum prior to this Change Order $3,046,000.00 The Contract Sum will be increased by $ 357,615.57 The new Contract Sum including this Change Order will be $3,403,615.57 The Contract Time will be increased by zero ( 0 ) days The new date of Substantial Completion will be October 6, 2025 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE B. Insurance - Blake Petry, Chairman C. Building & Grounds Committee - David Doise, Chairman D. Policy- Russell Walker,

$93,605.24
$9,757.10
$248,136.53
$6,116.70
$357,615.57
$3,046,000.00
Not recorded
Mar 18, 2025
Finance/Salary committee
Change order Grant permission to LHS to accept the following change order:
Full text

8. Grant permission to LHS to accept the following change order: CHANGE ORDER NO.: FOUR (4) Owner: Jefferson Davis Parish School Board Engineer: Meyer & Associates, Inc. Engineer’s Project No.: H1-19026-DA Contractor: Gunter Construction, Inc. Project: Lacassine Athletic Complex (Phase 1) Contract Date: February 20, 2024 Date of Notice to Proceed: March 25, 2024 Date Issued: March 14, 2025 Effective Date of Change Order: March 14, 2025 The Contract is modified as follows upon execution of this Change Order: Description: Add Pay Item 706-02-00300 “Concrete Drive (8" Thick)” at a lump sum of $22,000. An additional 14 contract days were added under this change order to address the additional scope of work. Attachments: 3/14/25 Gunter Estimate No. 023140 Change in Contract Price Change in Contract Times Original Contract Price: Original Contract Times: Substantial Completion: 120 $ 664,554.65 (07-23-2024) Ready for final payment: 165 (09-06-2024) [Increase] from previously approved [Increase] from previously approved Change Orders No. 1 to No. 3: Change Orders No. 1 to No. 3: Substantial Completion: 120 $ 168,921.95 Ready for final payment: 120 Contract Price prior to this Change Order

$22,000
$664,554.65
$168,921.95
$833,476.60
$22,000.00
$855,476.60
Committee item
Feb 24, 2025
Building committee
Approval Consideration of re-naming the JHS Jerry Simmons Stadium to Bulldog
Full text

1. Consideration of re-naming the JHS Jerry Simmons Stadium to Bulldog Stadium. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Feb 18, 2025
Finance/Salary committee
Approval Grant permission to declare an emergency at WES to replace the roof.
Full text

8.5. Grant permission to declare an emergency at WES to replace the roof. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Dec 17, 2024
Ward Ii committee
Approval Approve the expansion and elevation of the press box at Jerry Simmons Stadium
Full text

1. Approve the expansion and elevation of the press box at Jerry Simmons Stadium contingent upon the approval of the City of Jennings variance. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Dec 11, 2024
Ward Ii committee
Approval Stadium Project improvements.
Full text

1. Stadium Project improvements. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Oct 17, 2024
Regular meeting
Approval Gifting Grace Project in Lafayette, Louisiana for donating 125
Full text

C.2. Gifting Grace Project in Lafayette, Louisiana for donating 125 backpacks filled with school supplies. All donations will be used to help students in the Mckinney Vento Homeless program as well as other students in need of assistance. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE 6. Grant permission to JHS to accept the following donations to be used for FFA National Convention. 1. Kevin Berken, BESE member $100.00. 2. Donald Kratzer $100.00.

$100.00 Not recorded
Oct 15, 2024
Finance/Salary committee
Approval Gifting Grace Project in Lafayette, Louisiana for donating 125 backpacks
Full text

6.2. Gifting Grace Project in Lafayette, Louisiana for donating 125 backpacks filled with school supplies. All donations will be used to help students in the Mckinney Vento Homeless program as well as other students in need of assistance. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE 6. Grant permission to JHS to accept the following donations to be used for FFA National Convention. 1. Kevin Berken, BESE member $100.00. 2. Donald Kratzer $100.00.

$100.00 Committee item
Sep 19, 2024
Regular meeting
Bid Grant permission to accept the bid of $ 1,000.00 per cut at 16 cuts for 620
Full text

A.14. Grant permission to accept the bid of $ 1,000.00 per cut at 16 cuts for 620 Florence Street, and 802 W Jefferson Street by Duhon Lawn Care. Other bids were $ 1,200 per cut at 16 cuts K&D Lawn Care, and $1800 per cut at 16 cuts Wilridge Lawn Services LLC. A bid was also solicited from Johns Affordable Lawn Care which we did not receive. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$1,000.00
$1,200
$180
Not recorded
Sep 17, 2024
Finance/Salary committee
Bid Grant permission to accept the bid of $ 1,000.00 per cut at 16 cuts for 620 Florence
Full text

14. Grant permission to accept the bid of $ 1,000.00 per cut at 16 cuts for 620 Florence Street, and 802 W Jefferson Street by Duhon Lawn Care. Other bids were $ 1,200 per cut at 16 cuts K&D Lawn Care, and $1800 per cut at 16 cuts Wilridge Lawn Services LLC. A bid was also solicited from Johns Affordable Lawn Care which we did not receive. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$1,000.00
$1,200
$180
Committee item
Jul 18, 2024
Regular meeting
Bid Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over
Full text

A.12. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the three-year Gasoline & Diesel Off Site Fueling System contract for the three-year period beginning July 1, 2024 and ending June 30, 2027, as recommended by the Director of Finance. Sealed bids were opened on Monday, July 15, 2024 @ 2:00 p.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. Fuselier Canal provided an Elton only bid of $.7 per gallon margin over the OPIS (LakeCharles) terminal price. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Not recorded
Jul 18, 2024
Regular meeting
Bid Accept the catalog bid from The Tree House for the 2024-2025
Full text

A.10. Accept the catalog bid from The Tree House for the 2024-2025 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost. The other bids received were from Quill, and Howard Technology. Sealed bids were opened on Monday, July 15, 2024 @ 10:00 a.m. Sealed bids were opened on Monday, July 15, 2024 @ 10:00 a.m. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Not recorded
Jul 16, 2024
Finance/Salary committee
Bid Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the
Full text

12. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the three-year Gasoline & Diesel Off Site Fueling System contract for the three-year period beginning July 1, 2024 and ending June 30, 2027, as recommended by the Director of Finance. Sealed bids were opened on Monday, July 15, 2024 @ 2:00 p.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. Fuselier Canal provided an Elton only bid of $.7 per gallon margin over the OPIS (LakeCharles) terminal price. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Jul 16, 2024
Finance/Salary committee
Bid Accept the catalog bid from The Tree House for the 2024-2025 JDPSB
Full text

10. Accept the catalog bid from The Tree House for the 2024-2025 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost. The other bids received were from Quill, and Howard Technology. Sealed bids were opened on Monday, July 15, 2024 @ 10:00 a.m. Sealed bids were opened on Monday, July 15, 2024 @ 10:00 a.m. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
May 9, 2024
Regular meeting
Bid Award bid on EES Cafeteria Project to K & J Development of
Full text

C.1. Award bid on EES Cafeteria Project to K & J Development of SWLA, Inc. in the amount of $360,000.00. Bids were opened on Tuesday, May 7, 2024 at 2:00 P.M. Other bids received from L & L Erectors ($417,000.00), ARL Construction ($425,000.00), Garden City Construction Co, Inc. ($431,600.00), JAI Construction, LLC ($466,544.00) and C. Morvant Construction, Inc. ($548,000.00) and MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$360,000.00
$417,000.00
$425,000.00
$431,600.00
$466,544.00
$548,000.00
Not recorded
May 9, 2024
Regular meeting
Bid Grant permission to the Child Nutrition Program to accept the bids on the
Full text

A.7. Grant permission to the Child Nutrition Program to accept the bids on the following small items for the 2024-2025 School Year: Dry Goods: Cajun Wholesale - Spice, Salt Free, Cajun Seasoning, Spicy $103.80; Forecomm - Grape and Cranberry Raspberry Juice $9.15, Mustard, Prepared $7.99, Salsa $43.80, Chips, Crispy, Rounds, RF WG $43.20, Sauce, Enchilada $38.99, Chips, RF, Spicy Sweet Chili Flavored Tortilla Chips $30.20, chips, Onion Flavored $43.20, Seasoning Mix Taco $4.95, Spice, Pepper, Black $7.30, Spice, Pepper, Red $4.95, Spice, cumin $6.56, Red Beans, Canned $35.60, Frosted Tarts - Frosted Strawberry (Low Fat) $42.22, Frosted Tarts - Frosted Fudge (Low Fat) $42.22, Peas, english $36.40, Onion, Granulated $4.95, Mayonnaise, Light, Ind $19.30, chicken Broth $40.60, Dressing Ranch Ind $14.84, Condiments, Syrup cups, Ind 1.5 oz $16.77, Carrots, Sliced $28.90, Green Beans $29.30, Baking Powder $11.61, Shelf Stable Food Boxes $46.20; Supreme Rice - White Rice $11.00; William George - Oranges, Mandarin canned $40.80, Pineapple Tidbits $38.40, Pears, Halves $35.40, Pears, Diced $31.20, Peaches, Diced $32.40, Lemon Juice, Reconstituted $34.51, Yeast $ 77.32, Baking Soda $29.38, Se

$103.80
$9.15
$7.99
$43.80
$43.20
$38.99
Not recorded
May 7, 2024
Finance/Salary committee
Bid Grant permission to the Child Nutrition Program to accept the bids on the
Full text

9. Grant permission to the Child Nutrition Program to accept the bids on the following small items for the 2024-2025 School Year: Dry Goods: Cajun Wholesale - Spice, Salt Free, Cajun Seasoning, Spicy $103.80; Forecomm - Grape and Cranberry Raspberry Juice $9.15, Mustard, Prepared $7.99, Salsa $43.80, Chips, Crispy, Rounds, RF WG $43.20, Sauce, Enchilada $38.99, Chips, RF, Spicy Sweet Chili Flavored Tortilla Chips $30.20, chips, Onion Flavored $43.20, Seasoning Mix Taco $4.95, Spice, Pepper, Black $7.30, Spice, Pepper, Red $4.95, Spice, cumin $6.56, Red Beans, Canned $35.60, Frosted Tarts - Frosted Strawberry (Low Fat) $42.22, Frosted Tarts - Frosted Fudge (Low Fat) $42.22, Peas, english $36.40, Onion, Granulated $4.95, Mayonnaise, Light, Ind $19.30, chicken Broth $40.60, Dressing Ranch Ind $14.84, Condiments, Syrup cups, Ind 1.5 oz $16.77, Carrots, Sliced $28.90, Green Beans $29.30, Baking Powder $11.61, Shelf Stable Food Boxes $46.20; Supreme Rice - White Rice $11.00; William George - Oranges, Mandarin canned $40.80, Pineapple Tidbits $38.40, Pears, Halves $35.40, Pears, Diced $31.20, Peaches, Diced $32.40, Lemon Juice, Reconstituted $34.51, Yeast $ 77.32, Baking Soda $29.38, Seas

$103.80
$9.15
$7.99
$43.80
$43.20
$38.99
Committee item
May 7, 2024
Finance/Salary committee
Bid Award of bid on EES Cafeteria Project. Bids to be opened on Tuesday, May
Full text

7. Award of bid on EES Cafeteria Project. Bids to be opened on Tuesday, May 7, 2024 at 2:00 P.M. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Apr 18, 2024
Regular meeting
Bid Accept the lowest bid from Trahan Construction for Jennings
Full text

C.2. Accept the lowest bid from Trahan Construction for Jennings Elementary Improvements in the amount of $241,000.00. Other bids received from James H. Fontenot Construction ($267,000.00) and K & J Development ($265,000.00). To be paid from Ward II Construction and/or Ward II Contingency. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$241,000.00
$267,000.00
$265,000.00
Not recorded
Apr 18, 2024
Regular meeting
Bid Accept the lowest bid from Murphy Cormier, GC in the amount
Full text

C.1. Accept the lowest bid from Murphy Cormier, GC in the amount of $249,250.00 for HHS Sewer Treatment Plant. Other bids received from Morvant Construction ($267,802.00) and Seth Priola Construction ($318,000.00). To be paid from ESSER III funding. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$249,250.00
$267,802.00
$318,000.00
Not recorded
Apr 16, 2024
Building committee
Bid Award of Jennings Elementary Improvements. Bids received
Full text

2. Award of Jennings Elementary Improvements. Bids received electronically on April 16th, 2024, at 2:00 P.M. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Apr 16, 2024
Building committee
Bid Award of bid on HHS Sewer Treatment Plant. Bids opened on
Full text

1. Award of bid on HHS Sewer Treatment Plant. Bids opened on Tuesday, April 16th, 2024, at 2:00 P.M. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Jan 25, 2024
Regular meeting
Bid Grant permission to Superintendent Hall and Architect, Steve Hotard,
Full text

A.3. Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek bids for the sewer project at Hathaway High School. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Not recorded
Jan 23, 2024
Finance/Salary committee
Bid Accept the lowest base bid from Gunter Construction in the amount of
Full text

10. Accept the lowest base bid from Gunter Construction in the amount of $664,554.65 for Phase l of the Lacassine Athletic Complex, Baseball and Softball fields. Other bids received were from Triton Construction @ $790,456.50, LA Truck and Tractor @ $1,002,962.25, and Trahan Construction @ $739,370.44. To be paid using a combination of funds: Community Donations, Act 397 Funds and SD #8 Contingency funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$664,554.65
$790,456.50
$1,002,962.25
$739,370.44
Committee item
Jan 23, 2024
Finance/Salary committee
Bid Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek
Full text

3. Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek bids for the sewer project at Hathaway High School. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Jan 23, 2024
Finance/Salary committee
Bid Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek
Full text

2. Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek bids for the renovations and upgrades to Elton Elementary's cafeteria. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Jan 23, 2024
Finance/Salary committee
Bid Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek
Full text

2.3. Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek bids for the sewer project at Hathaway High School. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Jan 23, 2024
Finance/Salary committee
Bid Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek
Full text

2.2. Grant permission to Superintendent Hall and Architect, Steve Hotard, to seek bids for the renovations and upgrades to Elton Elementary's cafeteria. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
Nov 16, 2023
Regular meeting
Change order Grant permission to accept Change Order No. 2 on the JDPSB - Fenton
Full text

5. Grant permission to accept Change Order No. 2 on the JDPSB - Fenton Elementary School Renovations Change Order #1 for additional days required due to unexpected soil conditions encountered. Bid Changes as follows: The Original Contract Sum was $1,385,000.00 The net change by previous orders $ 29,733.00 The Contract Sum prior to this Change Order $1,414,733.00 The new Contract Sum including this Changer Order $1,414,733.00 The Contract Time will be increased by Thirty days (30) days The new date of Substantial Completion will be Friday, October 27, 2023 MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$1,385,000.00
$29,733.00
$1,414,733.00
Approved
unanimously carried
Oct 19, 2023
Regular meeting
Approval Payo Construction $ 100.00
Full text

A.12. Payo Construction $ 100.00

$100.00 Not recorded
Oct 17, 2023
Finance/Salary committee
Approval Payo Construction $ 100.00
Full text

12. Payo Construction $ 100.00

$100.00 Committee item
Jul 20, 2023
Regular meeting
Approval Declare the following Tech Center/Warehouse items as surplus and send to the
Full text

6. Declare the following Tech Center/Warehouse items as surplus and send to the next available public auction: 1 small ice machine 36 large aluminum walkways 18 small aluminum walkways 9 aluminum stairs 1 window unit (AC) 2 electric plumbing snakes with extra drum 2 lawn mower decks 2 exmark zero turn mowers 2 large power boxes 1 small power box 1 box blade 2 walk in cooler fans 1 standalone water cooler 1 wall mounted water cooler MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Approved
unanimously carried
Jul 20, 2023
Regular meeting
Quote Grant permission to WHS to replace/purchase 2 - 5 ton rooftop A/C
Full text

A.6. Grant permission to WHS to replace/purchase 2 - 5 ton rooftop A/C units on the Welsh Cafeteria at a cost of $16,240.00 (materials and installation) from Young’s Appliance Repair. Other quotes received from Efficient Air Systems, LLC $18,820.00 and L and R Air Conditioning, LLC $19,420.00. To be paid from CSD #1 Contingency Funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$16,240.00
$18,820.00
$19,420.00
Not recorded
Jul 18, 2023
Finance/Salary committee
Quote Grant permission to WHS to replace/purchase 2 - 5 ton rooftop A/C units on the
Full text

6. Grant permission to WHS to replace/purchase 2 - 5 ton rooftop A/C units on the Welsh Cafeteria at a cost of $16,240.00 (materials and installation) from Young’s Appliance Repair. Other quotes received from Efficient Air Systems, LLC $18,820.00 and L and R Air Conditioning, LLC $19,420.00. To be paid from CSD #1 Contingency Funds. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$16,240.00
$18,820.00
$19,420.00
Committee item
Jun 13, 2023
Finance/Salary committee
Bid Accept the catalog bid from The Tree House, Inc. for the 2023-2024 JDPSB
Full text

8. Accept the catalog bid from The Tree House, Inc. for the 2023-2024 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost. The only other bid received was from Quill. Sealed bids were opened on Friday, June 9, 2023 @ 10:00 a.m. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Committee item
May 11, 2023
Regular meeting
Approval Declare the following items at the Tech Center/Maintenance Warehouse as
Full text

2. Declare the following items at the Tech Center/Maintenance Warehouse as surplus and send to the next available pubic auction: A. 12 AC units/ air handlers/ mini splits/ window units (beyond repair) B. 1 hot water heater C. 1 ice ben D. 8 water fountains E. 27 lights taken down and replaced by LED lights. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Not recorded
May 11, 2023
Regular meeting
Approval Declare the following items at the Tech Center/Maintenance Warehouse as
Full text

2. Declare the following items at the Tech Center/Maintenance Warehouse as surplus and send to the next available public auction: A. 12 AC units/ air handlers/ mini splits/ window units (beyond repair) B. 1 hot water heater C. 1 ice bin D. 8 water fountains E. 27 lights taken down and replaced by LED lights. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

— Approved
unanimously carried
Apr 18, 2023
Finance/Salary committee
Bid Accept the lowest bid from Pat Williams Construction, LLC for the Renovations of
Full text

9. Accept the lowest bid from Pat Williams Construction, LLC for the Renovations of Fenton Elementary at a cost of $1,385,000.00. Other bids received were from ARL Construction @ $1,735,000.00, Trahan Construction @ $1,472,000.00, and Russell J Stutes Construction @ $1,575,000.00. MOTIONBY: SECONDEDBY: PUBLICCOMMENT DISCUSSION VOTE

$1,385,000.00
$1,735,000.00
$1,472,000.00
$1,575,000.00
Committee item
Mar 16, 2023
Regular meeting
Approval Name Porche May Architects + Domain Architecture as the Architect
Full text

C.2. Name Porche May Architects + Domain Architecture as the Architect Firm to oversee all FEMA work related to Hurricanes Laura and Delta. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Mar 14, 2023
Building committee
Approval Evaluations of Architect packages received by the Jefferson Davis Parish School
Full text

1. Evaluations of Architect packages received by the Jefferson Davis Parish School Board for the work needed for damages due to Hurricanes Laura and Delta. Evaluations will be submitted to Superintendent John Hall and Finance Director,Christin LeGros for recommendation to the full Board on Thursday.

— Committee item
Dec 15, 2022
Regular meeting
Bid A resolution approving the acceptance of the bid for the purchase of One Million
Full text

6. A resolution approving the acceptance of the bid for the purchase of One Million Four Hundred Seventy-Five Thousand Dollars ($1,475,000) of General Obligation School Bonds, Series 2023, of School District No. 5 of the Parish of Jefferson Davis, State of Louisiana; and providing for other matters in connection therewith. MOTION BY: SECONDED BY: Consideration of a motion to amend as follows: RESOLUTION A resolution approving the acceptance of the bid of Robert W. Baird & Co., Inc. for the purchase of One Million Four Hundred Seventy-Five Thousand Dollars ($1,475,000) of General Obligation School Bonds, Series 2023, of School District No. 5 of the Parish of Jefferson Davis, State of Louisiana; and providing for other matters in connection therewith. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE Motion on Original Motion as amended: MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE ARC BORD BOUL BRUC CAP DEES DOB DOISE LEGER PERRY SEG SING TRAHAN *** ADDENDUM TO NEW BUSINESS 1. Consideration of a motion to grant permission to amend the 2022-23 School calendar to designate Monday, January 2, 2023 as a public holiday and that all locations will be closed in observance of

$1,475,000
$301
Not recorded
Dec 15, 2022
Regular meeting
Quote Grant permission to LAHS to purchase a new 10 ton rooftop package
Full text

C.1. Grant permission to LAHS to purchase a new 10 ton rooftop package unit for the Main Gym at a cost of $14,360.00 from Young’s A/C. Price includes labor and materials to install. Other quotes were received from Trouth Air Conditioning ($21,919.00). Another quote solicited from Calcasieu Mechanical but not received. To be paid from Maintenance #1. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$14,360.00
$21,919.00
Not recorded
Sep 15, 2022
Regular meeting
Approval Approve the addition of the sidewalk for the south stairwell door
Full text

A.10. Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$9,000 Not recorded
Sep 15, 2022
Regular meeting
Approval Approve the addition of a Slimline structure for Staff covering at
Full text

A.9. Approve the addition of a Slimline structure for Staff covering at Jennings Elementary at a cost not to exceed $24,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,000 Not recorded
Sep 15, 2022
Regular meeting
Bid Accept the bid of The Tree House, Inc. for the 22-23 JDPSB
Full text

A.3. Accept the bid of The Tree House, Inc. for the 22-23 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost of $3,119.34 based on a sample of top purchased items from the 21-22 year, as recommended by the Director of Finance. Other bids received from CSS ($3,444.52) and Quill.com ($4,195.77). Sealed sealed bids were opened at 10 a.m. on Friday, September 9, 2022. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$3,119.34
$3,444.52
$4,195.77
Not recorded
Sep 13, 2022
Finance/Salary committee
Approval Approve the addition of the sidewalk for the south stairwell door to the
Full text

10. Approve the addition of the sidewalk for the south stairwell door to the dumpster at Jennings Elementary at a cost not to exceed $9,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$9,000 Committee item
Sep 13, 2022
Finance/Salary committee
Approval Approve the addition of a Slimline structure for Staff covering at Jennings
Full text

9. Approve the addition of a Slimline structure for Staff covering at Jennings Elementary at a cost not to exceed $24,000. To be paid by Ward II Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,000 Committee item
Sep 13, 2022
Finance/Salary committee
Bid Accept the best bid for the 2022-2023 Parish-wide Computer Supplies contract
Full text

3. Accept the best bid for the 2022-2023 Parish-wide Computer Supplies contract beginning immediately following acceptance and ending June 30, 2023 from sealed bids opened at 10 a.m. on Friday, September 9, 2022, as requested by the Director of Finance. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Sep 13, 2022
16th Section committee
Bid Grant permission to advertise for bids for 16th Section land on a cash rent
Full text

1. Grant permission to advertise for bids for 16th Section land on a cash rent basis. Term of this lease beginning on January 1, 2023 and ending on December 31, 2027, with rents payable on March 1st of each year. At the end of the primary term, Lessee would be granted the option to renew lease for five calendar years. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Aug 16, 2022
Finance/Salary committee
Quote Grant permission to LAES to approve the quote from Dugas Builders for
Full text

3. Grant permission to LAES to approve the quote from Dugas Builders for $76,000.00 to replace 2750 feet of existing chain link fence and upgrade to a 6 foot fence. Other quote received from Bravo ($77,050.00). Other quotes sought from Nash Fence & Supplies and Patriot Fence in Lake Charles but not received. To be paid from District 1 Maintenance. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$76,000.00
$77,050.00
Committee item
Jun 16, 2022
Regular meeting
Bid Grant permission to the Child Nutrition Program to bid small equipment.
Full text

6. Grant permission to the Child Nutrition Program to bid small equipment. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION

— Approved
unanimously carried
Jun 14, 2022
Finance/Salary committee
Bid Accept the best bid for the 22-25 JDPSB Parish-wide Garbage Collection and
Full text

14. Accept the best bid for the 22-25 JDPSB Parish-wide Garbage Collection and Disposal Bid (three year contract) as recommended by the Director of Finance. Sealed bids to be opened on June 14, 2022, at 10:00 a.m., as recommended by the Director of Finance. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Jun 14, 2022
Finance/Salary committee
Bid Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS
Full text

13. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the two-year Gasoline & Diesel Offsite Fueling System contract for the two-year period beginning July 1, 2022 and ending June 30, 2024, as recommended by the Director of Finance. Sealed bids were opened on Thursday, June 2, 2022 @ 2:00 p.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. Fuselier Canal provided an Elton only bid of $.7 per gallon margin over the OPIS (LakeCharles) terminal price. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
May 12, 2022
Regular meeting
Bid Grant permission to pay for Professional Fees (Architect, Drafting,
Full text

L.20. Grant permission to pay for Professional Fees (Architect, Drafting, Engineer's) of $27,865 to be paid to Champeaux, Evans and Hotard for architectural services for the New Elton Elementary School (Re-Bid). To be paid from Dist # 22 construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$27,865 Not recorded
May 12, 2022
Regular meeting
Approval C. Morvant Construction - $25.00
Full text

J. C. Morvant Construction - $25.00

$25.00 Not recorded
May 10, 2022
Finance/Salary committee
Bid Grant permission to pay for Professional Fees (Architect, Drafting, Engineer's) of
Full text

20. Grant permission to pay for Professional Fees (Architect, Drafting, Engineer's) of $27,865 to be paid to Champeaux, Evans and Hotard for architectural services for the New Elton Elementary School (Re-Bid). To be paid from Dist # 22 construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$27,865 Committee item
Apr 7, 2022
Regular meeting
Bid The Elton Elementary construction project has a budget and
Full text

A.7. The Elton Elementary construction project has a budget and projected cost of 3.8 million dollars. The following bids were received by the school board on March 15, 2022. Trahan Construction $5,145,000 Pat Williams Construction $5,152,000 M.D. Descant $5,233,000 With all bids coming in above budget and projected cost we would ask that the committee motion to reject all bids received and reconvene at a later date to determine when to rebid the project. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,145,000
$5,152,000
$5,233,000
Not recorded
Apr 5, 2022
Finance/Salary committee
Bid The Elton Elementary construction project has a budget and projected cost of
Full text

A.7. The Elton Elementary construction project has a budget and projected cost of 3.8 million dollars. The following bids were received by the school board on March 15, 2022. Trahan Construction $5,145,000 Pat Williams Construction $5,152,000 M.D. Descant $5,233,000 With all bids coming in above budget and projected cost we would ask that the committee motion to reject all bids received and reconvene at a later date to determine when to rebid the project. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,145,000
$5,152,000
$5,233,000
Committee item
Mar 15, 2022
Finance/Salary committee
Bid Grant permission to EES to accept the best bid from bids open on Tuesday,
Full text

9. Grant permission to EES to accept the best bid from bids open on Tuesday, March 15, 2022 at 2:00 p.m. To be paid from District #22 Construction. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Feb 17, 2022
Regular meeting
Quote Grant permission to proceed with accepting the roof quote from
Full text

A.14. Grant permission to proceed with accepting the roof quote from Dale Leger in the amount of $15,900.00 to replace, repair and inspect the cafeteria roof at Hathaway High School. Other quotes from David Duplechain ($15,990.00) and Morcore Roofing ($16,635.00). To be paid from Natural Disaster Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$15,900.00
$15,990.00
$16,635.00
Not recorded
Feb 17, 2022
Regular meeting
Bid Grant permission to the Superintendent to have the Architect of
Full text

A.8. Grant permission to the Superintendent to have the Architect of record commence pre-bid work to include but not limited to planning, construction drawing, advertisements for bid and pre-bid meetings on roof repairs/renovations for all Jefferson Davis School Buildings. To be paid from the Natural Disaster Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Feb 17, 2022
Regular meeting
Bid Grant permission to the Superintendent to have the Architect of
Full text

A.7. Grant permission to the Superintendent to have the Architect of record commence pre-bid work to include but not limited to planning, construction drawing, advertisements for bid and pre-bid meetings on Hathaway High School renovation for restrooms to be paid from District #3 Maintenance Fund Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Feb 15, 2022
Finance/Salary committee
Bid Grant permission to the Superintendent to have Safeworks and/or Architect of
Full text

9. Grant permission to the Superintendent to have Safeworks and/or Architect of record commence pre-bid/RFP work to include but not limited to planning, construction drawing, advertisements for bid and pre-bid meetings on Air Quality / Environmental work for all Jefferson Davis School Buildings. To be paid from the Natural Disaster Fund and or CEA with State Treasury up to $500,000 if state approves. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$500,000 Committee item
Feb 15, 2022
Finance/Salary committee
Bid Grant permission to the Superintendent to have the Architect of record
Full text

8. Grant permission to the Superintendent to have the Architect of record commence pre-bid work to include but not limited to planning, construction drawing, advertisements for bid and pre-bid meetings on roof repairs/renovations for all Jefferson Davis School Buildings. To be paid from the Natural Disaster Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Feb 15, 2022
Finance/Salary committee
Bid Grant permission to the Superintendent to have the Architect of record
Full text

7. Grant permission to the Superintendent to have the Architect of record commence pre-bid work to include but not limited to planning, construction drawing, advertisements for bid and pre-bid meetings on Hathaway High School renovation for restrooms to be paid from District #3 Maintenance Fund Contingency. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Aug 19, 2021
Regular meeting
Quote Grant permission to WHS to purchase for the football stadium a
Full text

A.9. Grant permission to WHS to purchase for the football stadium a bleacher unit, 10-row x 27” non-elevated with a net seating capacity of 144 at a cost of $25,899.00 from Hahn Enterprises. Other quotes received from Dyna-Play ($28,240.00) and Kyle Recreation ($29,267.00). To be paid from CSD Contingency #1 funds. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$25,899.00
$28,240.00
$29,267.00
Not recorded
Aug 17, 2021
Finance/Salary committee
Quote Grant permission to WHS to purchase for the football stadium a bleacher unit,
Full text

9. Grant permission to WHS to purchase for the football stadium a bleacher unit, 10-row x 27” non-elevated with a net seating capacity of 144 at a cost of $25,899.00 from Hahn Enterprises. Other quotes received from Dyna-Play ($28,240.00) and Kyle Recreation ($29,267.00). To be paid from CSD Contingency #1 funds. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$25,899.00
$28,240.00
$29,267.00
Committee item
Jun 15, 2021
Finance/Salary committee
Bid Accept the best catalog bid for the 21-22 JDPSB Parishwide Computer Printing
Full text

16. Accept the best catalog bid for the 21-22 JDPSB Parishwide Computer Printing Supplies bid, from bids opened on Wednesday, June 9,2021 @ 10:00 a.m. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Jun 15, 2021
Finance/Salary committee
Bid Approve the following bids for Duplicator & Janitorial Paper Products from the
Full text

14. Approve the following bids for Duplicator & Janitorial Paper Products from the 21-22 school year from sealed bids opened at 10 am, Friday, June 4, 2021, as recommended by the Director of Finance: Copier/Duplicator Paper: Economical Janitorial & Paper Supplies, $26.25 per case. No other bids received. 2 -Ply Bathroom Tissue: Economical Janitorial & Paper Supplies, $27.36 per case. Other bids received - K & J Janitorial Supplies, LLC - $32.89 per case. Non-Perforated Roll Towels: Economical Janitorial & Paper Supplies, $14.04 per case. Other bids received - K & J Janitorial Supplies, LLC - $16.02 per case. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$26.25
$27.36
$32.89
$14.04
$16.02
Committee item
May 6, 2021
Regular meeting
Bid The Elton Elementary construction project has a budget of 4 million
Full text

2.3. The Elton Elementary construction project has a budget of 4 million dollars. The following bids were received by the school board on May 5, 2021. Trahan Construction $5,946,000 with alternative 1 at 153,000 M.D. Descant $5,924,000 with alternative 1 at 120,000 Miller and Associates $5,987,000 alternative 1 at 149,500 Tutor Construction $5,961,000 alternative 1 at 173,000 Motion to reject all bids and rebid the project at a later date when construction materials costs have reduced themselves from post hurricane and pandemic price increases and a larger labor pool is available. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,946,000
$5,924,000
$5,987,000
$5,961,000
Approved
unanimously carried
May 6, 2021
Regular meeting
Bid Grant permission to the Child Nutrition Program to bid out Small
Full text

I.3. Grant permission to the Child Nutrition Program to bid out Small Wares items for the 2021-2022 school year. 2021-2022 Child Nutrition Program Procurement Notice for Small Equipment The following calendar identifies the general items to be bid, the date, and the time of the bid opening for the 2021-2022 School Year for the Jefferson Davis Parish School Board Child Nutrition Program. The bid will be opened for reading only at the Food Service Warehouse located at 1627 Wilbert D. Rochelle Avenue in Jennings, LA at 10:00 am on the specified bid opening day. The public is invited to attend. Invitations to bid, instructions, and specifications for any bids listed below may be obtained from the Child Nutrition Program located at the above address or by contacting the office at (337) 824-1969. ITEMS TO BE PROCURED Small Equipment BIDS TO VENDORS - May 11, 2021 PURCHASING PERIOD - School Year BID OPENING May 27, 2021 BID AWARD June 17, 2021 The Jefferson Davis Parish School Board Child Nutrition Program is funded 51% with federal funds for a total of approximately $2.1 million per year. Publication Dates: May 7 and 9, 2021. This was adopted by the Jefferson Davis Parish School Board at

$2 Not recorded
May 6, 2021
Regular meeting
Bid The Elton Elementary construction project has a budget of 4 million
Full text

3. The Elton Elementary construction project has a budget of 4 million dollars. The following bids were received by the school board on May 5, 2021. Trahan Construction $5,946,000 with alternative 1 at 153,000 M.D. Descant $5,924,000 with alternative 1 at 120,000 Miller and Associates $5,987,000 alternative 1 at 149,500 Tutor Construction $5,961,000 alternative 1 at 173,000 Motion to reject all bids and rebid the project at a later date when construction materials costs have reduced themselves from post hurricane and pandemic price increases and a larger labor pool is available. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,946,000
$5,924,000
$5,987,000
$5,961,000
Not recorded
May 4, 2021
Food Service committee
Bid Grant permission to the Child Nutrition Program to bid out Small Wares items
Full text

3. Grant permission to the Child Nutrition Program to bid out Small Wares items for the 2021-2022 school year. 2021-2022 Child Nutrition Program Procurement Notice for Small Equipment The following calendar identifies the general items to be bid, the date, and the time of the bid opening for the 2021-2022 School Year for the Jefferson Davis Parish School Board Child Nutrition Program. The bid will be opened for reading only at the Food Service Warehouse located at 1627 Wilbert D. Rochelle Avenue in Jennings, LA at 10:00 am on the specified bid opening day. The public is invited to attend. Invitations to bid, instructions, and specifications for any bids listed below may be obtained from the Child Nutrition Program located at the above address or by contacting the office at (337) 824-1969. ITEMS TO BE PROCURED BID TO VENDORS PURCHASING PERIOD BID OPENING BID AWARD Small Equipment May 11, 2021 School Year May 27, 2021 June 17, 2021 The Jefferson Davis Parish School Board Child Nutrition Program is funded 51% with federal funds for a total of approximately $2.1 million per year. Publication Dates: May 7 and 9, 2021. This was adopted by the Jefferson Davis Parish School Board at the Ma

$2 Committee item
May 4, 2021
Food Service committee
Bid Grant permission to the Child Nutrition Program to approve the following Bids for
Full text

2. Grant permission to the Child Nutrition Program to approve the following Bids for The Child Nutrition Program would like the board to approve the following Bids for 2021-2022 SY: Bread: Flower’s $29,200 Milk: $225,733.56 Chilled and Frozen Fruit Juices, Bakery Items, and Vegetables: Pon Foods: Ciabatta Bread, $23.28; Belgian Waffles, Vanilla $34.77; Belgian Waffles Strawberry $34.77; Belgian Waffles Blueberry $34.77; Muffins, Orange Dream $22.71; Muffins, Blueberry $20.18; Panini Bread $24.23; Muffins, Chocolate Chip $17.93; Potatoes, Crispy Cubes $35.68; French Toast Sticks $38.34; Mini Cinnamon Roll $14.65; Mini Pancakes Banana $24.88; Mini Pancakes Maple $24.91; Mini Pancakes Blueberry $24.86; Sour Cream $16.18; Creole Seasoning Blend – Frozen $27.00; Biscuit, Baked Easy Split 2oz $25.64; Baked Potato Soup $55.24 Lamn Foods: Belgian Waffles $36.00; Breakfast Buns $27.20; Texas Toast $21.65; Banana Square $14.05; Crumb Square $14.05; Mini Powdered Donuts $33.30; Corn Bread Mini Loaf $17.17 Diamond: Corn on Cob $23.88 Lacassagne: Hard Boiled and Peeled Eggs $19.85 Paper and Cleaning: Staples: Detergent, Pods $29.99; Pot and Pan Detergent $71.50 Interboro Packaging Corporation:

$29,200
$225,733.56
$23.28
$34.77
$22.71
$20.18
Committee item
Nov 19, 2020
Regular meeting
Bid Grant permission to the Child Nutrition Program to solicit bids for
Full text

4. Grant permission to the Child Nutrition Program to solicit bids for a 40' refrigerated container for use at the Food Service Warehouse. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Oct 15, 2020
Regular meeting
Bid BIDS AND QUOTATIONS File: DJED
Full text

D.3. BIDS AND QUOTATIONS File: DJED ​ Effective: July 1,2020 The contract limit for public works has been raised once again, this time from $150,000 to $250,000, as reflected in the Bids and Quotations policy. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$150,000
$250,000
Not recorded
Oct 13, 2020
Policy committee
Bid BIDS AND QUOTATIONS File: DJED
Full text

A.3. BIDS AND QUOTATIONS File: DJED ​ Effective: July 1,2020 The contract limit for public works has been raised once again, this time from $150,000 to $250,000, as reflected in the Bids and Quotations policy. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$150,000
$250,000
Committee item
Jul 16, 2020
Regular meeting
Bid Bids were opened on June 23, 2020 for the construction of the new
Full text

A.3. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Grant permission to accept the bid of Trahan Construction, LLC of $22,085,000.00. Other bids received from M.D. Descant, LLC $23,758,000.00, Pat Williams Construction, LLC $22,400,000.00, Ratcliff Construction, LLC $23,137,000.00, Rudick Company, Inc. $25,500,000.00 and Southern Constructors, LLC $24,300,000.00 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$23,758,000.00
$22,400,000.00
$23,137,000.00
$25,500,000.00
$24,300,000.00
Not recorded
Jul 14, 2020
Finance/Salary committee
Bid Bids were opened on June 23, 2020 for the construction of the new Jennings
Full text

3. Bids were opened on June 23, 2020 for the construction of the new Jennings Elementary. Grant permission to accept the bid of Trahan Construction, LLC of $22,085,000.00. Other bids received from M.D. Descant, LLC $23,758,000.00, Pat Williams Construction, LLC $22,400,000.00, Ratcliff Construction, LLC $23,137,000.00, Rudick Company, Inc. $25,500,000.00 and Southern Constructors, LLC $24,300,000.00 MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$22,085,000.00
$23,758,000.00
$22,400,000.00
$23,137,000.00
$25,500,000.00
$24,300,000.00
Committee item
Jun 18, 2020
Regular meeting
Approval Name Champeuax, Evans & Hotard - Lake Charles, Louisiana, as architect of
Full text

2. Name Champeuax, Evans & Hotard - Lake Charles, Louisiana, as architect of record for the Jefferson Davis Parish School Board, for a two year term effective 07/01/2020 to 06/30/22. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Jun 18, 2020
Regular meeting
Bid Accept the bid of Ross Bus Sales, Inc. for the purchase of a used 2017
Full text

A.8. Accept the bid of Ross Bus Sales, Inc. for the purchase of a used 2017 Ford activity bus with a 3.7L V6 275hp engine with 48,000 miles for the bid price of $43,500.00 for parish wide use as per sealed bids opened Monday, June 1, 2020 at 2 pm as recommended by the Supervisor of Transportation and the Director of Finance. No other bids were received. To be paid from the GF 2020-21 budget. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$43,500.00 Not recorded
Jun 18, 2020
Regular meeting
Bid Accept the catalog bid of The Tree House, Inc. for the 2021 JDPSB
Full text

A.7. Accept the catalog bid of The Tree House, Inc. for the 2021 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost of $3,803.18 as recommended by the Director of Finance. Other bid received was Quill for $4,123.76. Sealed bids were opened on Wednesday, May 27, 2020 @ 2:00 p.m. A Sealed bid was also received School Specialty, Inc. that stated they were unable to respond to the bid specifications. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$3,803.18
$4,123.76
Not recorded
Jun 18, 2020
Regular meeting
Bid Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the
Full text

A.5. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the two-year Gasoline & Diesel Offsite Fueling System contract for the two-year period beginning July 1, 2020 and ending June 30, 2022, as recommended by the Director of Finance. Sealed bids were opened on Wednesday, May 27, 2020 @ 10:00 a.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Not recorded
Jun 16, 2020
Finance/Salary committee
Bid Accept the bid of Ross Bus Sales, Inc. for the purchase of a used 2017 Ford
Full text

8. Accept the bid of Ross Bus Sales, Inc. for the purchase of a used 2017 Ford activity bus with a 3.7L V6 275hp engine with 48,000 miles for the bid price of $48,000.00 for parish wide use as per sealed bids opened Monday, June 1, 2020 at 2 pm as recommended by the Supervisor of Transportation and the Director of Finance. No other bids were received. To be paid from the GF 2020-21 budget. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$48,000.00 Committee item
Jun 16, 2020
Finance/Salary committee
Bid Accept the catalog bid of The Tree House, Inc. for the 2021 JDPSB Parishwide
Full text

7. Accept the catalog bid of The Tree House, Inc. for the 2021 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost of $3,803.18 as recommended by the Director of Finance. Other bid received was Quill for $4,123.76. Sealed bids were opened on Wednesday, May 27, 2020 @ 2:00 p.m. A Sealed bid was also received School Specialty, Inc. that stated they were unable to respond to the bid specifications. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$3,803.18
$4,123.76
Committee item
Jun 16, 2020
Finance/Salary committee
Bid Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS
Full text

5. Accept the bid of Fleet Rite/Shop Rite of $.10 per gallon margin over the OPIS (Lake Charles) terminal price for the two-year Gasoline & Diesel Offsite Fueling System contract for the two-year period beginning July 1, 2020 and ending June 30, 2022, as recommended by the Director of Finance. Sealed bids were opened on Wednesday, May 27, 2020 @ 10:00 a.m., and no other Parish-wide bids were received. Under the terms of the bid, Fuselier Canal will be allowed to provide fuel for the buses used in the Elton area routes only because they agreed in writing to provide fuel to JDPSB vehicles under terms equal to or better than the winning parish-wide bid. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
May 21, 2020
Regular meeting
Bid Approve the following bids for Duplicator & Janitorial Paper Products
Full text

A.1. Approve the following bids for Duplicator & Janitorial Paper Products from the 20-21 school year from sealed bids opened at 10 am, Wednesday, May 13, 2020, as recommended by the Director of Finance: 1. Copier/Duplicator Paper: Economical Janitorial & Paper Supplies, $23.80 per case. Other bids received: Contract Paper Group, $25.05 per case and Veritiv, $25.90 per case.

$23.80
$25.05
$25.90
Not recorded
May 19, 2020
Finance/Salary committee
Bid Accept the best quotes for the 2020-2021 School Food Service Needs. Bids
Full text

6. Accept the best quotes for the 2020-2021 School Food Service Needs. Bids ​ opened on April 9 and April 23, 2020 at 10:00 a.m.:`\ 1Milk: ​ ​ Oak Farms Dairy $199,535.76 Bread: ​ Flower’s Bakery $29,200.00 Frozen/Chilled Bakery: ​ Diamond: French Toast $37.62; Cinnamon Rolls $14.08 Lamm: Hard Boiled and Peeled Eggs $28; Crumb Square $13.30; Banana Square $13.30; Onion Rings $52.80 Lacassigne: Biscuit $25.75 Ponn: Orange Dream Muffins $21.83; Blueberry Muffins $20.05; Chocolate Chip Muffins $17.49; Donut Holes $26.92; Crispy Cubes $$35.68; Breakfast buns $26.59; Baked Potato Soup $54.69; Texas Toast $21.42; Sour Cream $16.83; Seasoning Blend $24.08; Corn Bread $16.38; Maple, Banana, and Blueberry Mini Pancakes $24.68 Paper and Cleaning: ​ Interboro: Bun Pan Rack Cover $10.24; Bun Pan Bag $11.24 Economical: Moist Foam Soap $43.88; Detergent for Washing Machines $74.95; Oven Cleaner $19.97; Power Dissolver $44.62; SS Polish/Cleaner $26.34; Quat Sanitizer $56.91; Floor Cleaner $63.43; All Purpose Cleaner $92.07; Styrofoam Trays w/ Cover $10.19; Aluminum Tays w/ Lids $43.25; Plastic Wrap $10.50; Red Plaid Food Trays $13.50; Large SS Sponge $3.32; Disposable 5 Compartment Plates $22; 1o

$199,535.76
$29,200.00
$37.62
$14.08
$28
$13.30
Committee item
May 19, 2020
Finance/Salary committee
Bid Approve the following bids for Duplicator & Janitorial Paper Products from the
Full text

1. Approve the following bids for Duplicator & Janitorial Paper Products from the 20-21 school year from sealed bids opened at 10 am, Wednesday, May 13, 2020, as recommended by the Director of Finance: MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Apr 23, 2020
Regular meeting
Bid Bid packets for the construction of the new Jennings Elementary campus will
Full text

2. Bid packets for the construction of the new Jennings Elementary campus will be released for bid in the month of May with the current target date of May 8th.

— Not recorded
Apr 23, 2020
Regular meeting
Bid Bid packets for the construction of the new Jennings Elementary campus will be
Full text

2. Bid packets for the construction of the new Jennings Elementary campus will be released for bid in the month of May with the current target date of May 8th.

— Not recorded
Mar 19, 2020
Special meeting
Bid A resolution accepting the bid of _________________________, of
Full text

2. A resolution accepting the bid of _________________________, of _______________________, for the purchase of Four Million Dollars ($4,000,000) of General Obligation School Bonds, Series 2020, of School District No. 22 of the Parishes of Jefferson Davis and Allen, State of Louisiana. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$4,000,000 Approved
unanimously carried
Mar 19, 2020
Special meeting
Bid A resolution providing for the tabulation of the electronic bids received for
Full text

1. A resolution providing for the tabulation of the electronic bids received for the purchase of Four Million Dollars ($4,000,000) of General Obligation School Bonds, Series 2020, of School District No. 22 of the Parishes of Jefferson Davis and Allen, State of Louisiana, approving the Official Notice of Bond Sale and Official Statement in connection therewith, and authorizing the President and the Secretary of the Parish School Board to sign copies thereof as evidence of the approval thereof. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$4,000,000 Approved
unanimously carried
Feb 20, 2020
Regular meeting
Quote Accept the best quote of $6,517.33 from Glenn Vanicor Builders, LLC for
Full text

A.9. Accept the best quote of $6,517.33 from Glenn Vanicor Builders, LLC for labor and material to update the front main entrance of the School Board Office. Other quotes received from Dupuis Construction ($6,770.00) and David Duplichan ($7,300.00). MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$6,517.33
$6,770.00
$7,300.00
Not recorded
Feb 18, 2020
Finance/Salary committee
Quote Accept the best quote of $6,517.33 from Glenn Vanicor Builders, LLC for labor
Full text

9. Accept the best quote of $6,517.33 from Glenn Vanicor Builders, LLC for labor and material to update the front main entrance of the School Board Office. Other quotes received from Dupuis Construction ($6,770.00) and David Duplichan ($7,300.00). MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$6,517.33
$6,770.00
$7,300.00
Committee item
Nov 21, 2019
Regular meeting
Quote Accept the quote of $24,400.00 from MorCore Roofing, LLC to
Full text

A.5. Accept the quote of $24,400.00 from MorCore Roofing, LLC to replace the roof at Educational Media Center. Other quotes received from Dale Leger ($29,320.00), Glenn Vanicor Builders, LLC ($31,200.00) and Dupuis Construction ($39,908.00). To be paid from General Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,400.00
$29,320.00
$31,200.00
$39,908.00
Not recorded
Nov 19, 2019
Finance/Salary committee
Quote Accept the quote of $24,400.00 from MorCore Roofing, LLC to replace the roof at
Full text

5. Accept the quote of $24,400.00 from MorCore Roofing, LLC to replace the roof at Educational Media Center. Other quotes received from Dale Leger ($29,320.00), Glenn Vanicor Builders, LLC ($31,200.00) and Dupuis Construction ($39,908.00). To be paid from General Fund. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$24,400.00
$29,320.00
$31,200.00
$39,908.00
Committee item
Sep 19, 2019
Regular meeting
Bid Grant permission to accept the bid of $22,073.00 from Dupuis
Full text

A.5. Grant permission to accept the bid of $22,073.00 from Dupuis Construction for the following improvements at Central Office: A. Interior - Materials and labor to prime and paint Board Room $2,400.00.

$22,073.00
$2,400.00
Not recorded
Jul 18, 2019
Regular meeting
Approval Dupuis Construction $ 500.00
Full text

B. Dupuis Construction $ 500.00

$500.00 Not recorded
Jul 9, 2019
Ward Ii committee
Bid Whether or not to have a Design, Bid, Build process or Construction Manager
Full text

2. Whether or not to have a Design, Bid, Build process or Construction Manager At Risk (C-Mar) Process in the building of the new Elementary School in ​ Jennings.

— Committee item
Jun 20, 2019
Regular meeting
Quote Grant permission to LAHS to purchase a new 10 ton roof top package unit
Full text

A.18. Grant permission to LAHS to purchase a new 10 ton roof top package unit for gym at a cost of $5,533.65 from Johnson Supply. This unit matches other units on gym and will be installed by Maintenance Department. Other quote received from Acme Refrigeration ($5,979.24). To be paid from Maintenance #1 2018-19 budget. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,533.65
$5,979.24
Not recorded
Jun 20, 2019
Regular meeting
Quote Grant permission to LAHS to purchase a new 10 ton roof top package unit
Full text

18. Grant permission to LAHS to purchase a new 10 ton roof top package unit for gym at a cost of $5,533.65 from Johnson Supply. This unit matches other units on gym and will be installed by Maintenance Department. Other quote received from Acme Refrigeration ($5,979.24). To be paid from Maintenance #1 2018-19 budget. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,533.65
$5,979.24
Not recorded
Jun 20, 2019
Regular meeting
Bid Accept the bid of Waste Management, Inc. for the 19-22 JDPSB
Full text

A.15. Accept the bid of Waste Management, Inc. for the 19-22 JDPSB Parishwide Garbage Collection and Disposal Bid for a total base cost of the three year contract of $206,414.00 from sealed bids opened June 5, 2019, as recommended by the Director of Finance. The contract term will run from July 1, 2019 through June 30, 2022, and it includes garbage pickup at all School Board locations. Other sealed bids received were from BFI/Republic Services for $210,230.16 and Deep South Containers for $326,724.48. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$206,414.00
$210,230.16
$326,724.48
Not recorded
Jun 20, 2019
Regular meeting
Bid Accept the catalog bid of The Tree House, Inc. for the 19‑20 JDPSB
Full text

A.14. Accept the catalog bid of The Tree House, Inc. for the 19‑20 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost of $3,825.35 as recommended by the Director of Finance. Other bids received were from The Office Pal,offering a net cost of $4,016.46, Quill for $4,714.25. and Advantage Imaging Supply for $4,828.89. Sealed bids were also received from ITD Print Solutions and School Specialty, Inc.that were not responsive to the bid specifications. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$3,825.35
$4,016.46
$4,714.25
$4,828.89
Not recorded
Jun 20, 2019
Regular meeting
Bid Accept the bid of Waste Management, Inc. for the 19-22 JDPSB
Full text

15. Accept the bid of Waste Management, Inc. for the 19-22 JDPSB Parishwide Garbage Collection and Disposal Bid for a total base cost of the three year contract of $206,414.00 from sealed bids opened June 5, 2019, as recommended by the Director of Finance. The contract term will run from July 1, 2019 through June 30, 2022, and it includes garbage pickup at all School Board locations. Other sealed bids received were from BFI/Republic Services for $210,230.16 and Deep South Containers for $326,724.48. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$206,414.00
$210,230.16
$326,724.48
Not recorded
Jun 20, 2019
Regular meeting
Bid Accept the catalog bid of The Tree House, Inc. for the 19‑20 JDPSB
Full text

14. Accept the catalog bid of The Tree House, Inc. for the 19‑20 JDPSB Parishwide Computer Printing Supplies bid, who offered discount percentages that resulted in the lowest net cost of $3,825.35 as recommended by the Director of Finance. Other bids received were from The Office Pal,offering a net cost of $4,016.46, Quill for $4,714.25. and Advantage Imaging Supply for $4,828.89. Sealed bids were also received from ITD Print Solutions and School Specialty, Inc.that were not responsive to the bid specifications. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$3,825.35
$4,016.46
$4,714.25
$4,828.89
Not recorded
May 9, 2019
Regular meeting
Bid Accept the best quotes for the 2019-2020 School Food Service Needs. Bids
Full text

A.6. Accept the best quotes for the 2019-2020 School Food Service Needs. Bids ​ opened April 4th and April 29th (due to the weather closure on April 18th). Milk/Milk Products: Borden’s $214,590.98; Bread: Bimbo $21,240.00; Paper: Economical: Brown ​ ​ ​ ​ ​ Bag $12.19; Sandwich Bag $9.99; Bun Bag $12.80; Styrofoam Bowls $13.66; Broom $4.29; Bun Pan Rack Cover $10.89; 12 oz cups $21.61; Cutlery Kit $11.02; Shallow 4oz $20.17; Deep 4oz $21.69; 8 oz Deep $26.45; Foil Sheets $8.90; Foil $32.56; Freezee Cups $18.80; Mop Handle $2.82; Lids for 12 oz $20.29; Lids for 4 oz $11.95; Liner for Bun Pans $28.90; Hinged 8 sided Containers $51.63; Paper Towels $15.85; 5 Compartment Plate $22.00; Resealable Bags $11.55; Scouring Pad $1.79; Scouring Pad Nylon Mes $1.78; Pot Holders $8.90; Puppet Mitts $17.05; Hinged Plates $50.15; Stainless Steel Sponge $3.34/dz; Tray, Styrofoam w/ cover $10.14; Aluminum Tray with lids $43.39; Plastic Wrap $10.65; Neutral Floor Cleaner $76.39; Sanitizer $56.91; Floor Cleaner $63.43; All Purpose Cleaner $72.07; Dawn $70.92; Bleach $12.63; Stainless Steel Polish $26.38; Oven Cleaner $20.83; Power Dissolver $44.65; Cleaner $55.27; Soap $48.25; All American Poly: Garba

$214,590.98
$21,240.00
$12.19
$9.99
$12.80
$13.66
Not recorded
May 9, 2019
Regular meeting
Bid Accept the bid of Cummins Sales & Service, Lake Charles of $35,290 for the
Full text

A.2. Accept the bid of Cummins Sales & Service, Lake Charles of $35,290 for the School Food Service Generator sealed bid opened at 2 pm on Monday, May 6, 2019, as recommended by the Director of Finance. Other bids received were from Taylor Power Systems, $41,660 and KDM Sales, $42962. Delivery will occur within 10 to 12 weeks after the award of the bid. MOTION BY TO AMEND: SECONDED BY TO PUBLIC COMMENT DISCUSSION VOTE AMEND:

$35,290
$41,660
$429
Not recorded
May 9, 2019
Regular meeting
Bid Approve the following bids for Duplicator & Janitorial Paper Products from the
Full text

A.1. Approve the following bids for Duplicator & Janitorial Paper Products from the 19-20 school year from sealed bids opened at 10 am, Tuesday, May 7, 2019, as recommended by the Director of Finance: Copier/Duplicator Paper: Contract Paper Group, $27.59 per case. Other bids received - Economical Janitorial & Paper Supplies, $27.97 per case; Veritiv, $28.90 per case. (Note: A volume discount is being offered in the School Board agrees to buy 200 more cases of copier paper, which would make the order a "full truck-load." The 840 case price would be $27.35 per case. This offer was not considered in the award of the bid, but may be selected at the discretion of the School Board.) 2-Ply Bathroom Tissue: Veritiv, $27.46 per case. Other bids received - Contract paper Group, $57.73 per case; and Economical Janitorial & Paper Supplies, $30.60 per case. Non-Perforated Roll Towels: Economical Janitorial & Paper Supplies, $13.80 per case. Other bids received - Contract Paper Group, $36.42 per case; Veritiv, $14.42 per case. MOTION BY TO AMEND: SECONDED BY TO PUBLIC COMMENT DISCUSSION VOTE AMEND:

$27.59
$27.97
$28.90
$27.35
$27.46
$57.73
Not recorded
May 7, 2019
Finance/Salary committee
Bid Accept the best quotes for the 2019-2020 School Food Service Needs. Bids
Full text

6. Accept the best quotes for the 2019-2020 School Food Service Needs. Bids ​ opened April 4th and April 29th (due to the weather closure on April 18th).. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
May 7, 2019
Finance/Salary committee
Bid Accept the bid results from the 19-20 Duplicator and Janitorial Paper Products
Full text

1. Accept the bid results from the 19-20 Duplicator and Janitorial Paper Products Bids opened May 7, 2019 at 2:00 p.m. as recommended by the Director of Finance. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Feb 21, 2019
Regular meeting
Bid No bids were received for the sale and removal of the structures on either the
Full text

5. No bids were received for the sale and removal of the structures on either the Bourque or Blanchard Blanchard properties located adjacent to Hathaway High ​ School. This is the second failed attempt to have the structures removed at the buyer's expense.

— Not recorded
Jan 17, 2019
Regular meeting
Bid Sealed bids for the removal of the two Hathaway property surplus structures
Full text

3. Sealed bids for the removal of the two Hathaway property surplus structures have been re-advertised, with bids being due at 10 am on Wednesday, February 13, 2019.

— Not recorded
Sep 20, 2018
Regular meeting
Bid Approve the bid of AMKO Fence Company from Kenner, LA in the amount of
Full text

A.11. Approve the bid of AMKO Fence Company from Kenner, LA in the amount of $41,085.00 for the 2018 LHS Fencing Project from sealed bids opened at 10 am on September 12, 2018. Other bids received were from A-1 American Fence Company, $77,280.00, U. S. Fence & Gate Company, $77,350.00, Rafter C. Construction, $78,000.00, and Hercules Fence Company, $79,949.00. (Note: AMKO Fence was contacted and informed of the discrepancy in the bid amounts. By state law, they were given 48 hours to provide written notice of their decision to withdraw their bid, or until Friday, September 14, 2018 at noon.) MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$41,085.00
$77,280.00
$77,350.00
$78,000.00
$79,949.00
Not recorded
Sep 18, 2018
Finance/Salary committee
Bid Approve the bid of AMKO Fence Company from Kenner, LA in the amount of
Full text

11. Approve the bid of AMKO Fence Company from Kenner, LA in the amount of $41,085.00 for the 2018 LHS Fencing Project from sealed bids opened at 10 am on September 12, 2018. Other bids received were from A-1 American Fence Company, $77,280.00, U. S. Fence & Gate Company, $77,350.00, Rafter C. Construction, $78,000.00, and Hercules Fence Company, $79,949.00. (Note: AMKO Fence was contacted and informed of the discrepancy in the bid amounts. By state law, they were given 48 hours to provide written notice of their decision to withdraw their bid, or until Friday, September 14, 2018 at noon.) MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE 2. An emergency was declared and permission was granted to Welsh-Roanoke Jr. High to purchase and replace a 37 gal 200K BTU Nat Gas Comm Water Heater at a cost of $5,976.47 from Southern Pipe. Other quotes from Home Depot $7,014.60 and Grangers $7,057.84. To be paid from Welsh CSD #1. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE INFORMATION: 1. LAHS was granted permission in July, 2018 to purchase a new ten ton roof top package for a cost of $5,110.75 from Johnson Supply. Time frame quote had already elapsed when quoted and the unit

$41,085.00
$77,280.00
$77,350.00
$78,000.00
$79,949.00
$5,976.47
Committee item
Jul 19, 2018
Regular meeting
Bid Accept the lowest and best bid for the purchase of a used activity bus for
Full text

A.17. Accept the lowest and best bid for the purchase of a used activity bus for Jennings High School with payment to come from the 18-19 School District #2 (Jennings) Maintenance Fund contingency budget. Sealed bids were opened on July 17th at 10 am. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE Page 3

— Not recorded
Jul 19, 2018
Regular meeting
Quote Grant permission to LAHS to purchase a new 10 ton rooftop package
Full text

A.10. Grant permission to LAHS to purchase a new 10 ton rooftop package unit at a cost of $5,110.76 from Johnson Supply. This unit supplies air conditioning and heat to the Main Gym. Other quotes received from Solar Supply ($5,855.56) and Cooling and Heating Supply ($6,987.00). To be paid from Maintenance #1 2018-19 funds. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE Page 2

$5,110.76
$5,855.56
$6,987.00
Not recorded
Jul 17, 2018
Finance/Salary committee
Bid Accept the lowest and best bid for the purchase of a used activity bus for
Full text

18. Accept the lowest and best bid for the purchase of a used activity bus for Jennings High School with payment to come from the 18-19 School District #2 (Jennings) Maintenance Fund contingency budget. Sealed bids were opened on July 17th at 10 am. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

— Committee item
Jul 17, 2018
Finance/Salary committee
Quote Grant permission to LAHS to purchase a new 10 ton roof top package unit at
Full text

10. Grant permission to LAHS to purchase a new 10 ton roof top package unit at a cost of $5,110.76 from Johnson Supply. This unit supplies air conditioning and heat to the Main Gym. Other quotes received from Solar Supply ($5,855.56) and Cooling and Heating Supply ($6,987.00). To be paid from Maintenance #1 2018-19 funds. MOTION BY: SECONDED BY: PUBLIC COMMENT DISCUSSION VOTE

$5,110.76
$5,855.56
$6,987.00
Committee item

Items are collected automatically from agenda items whose titles name construction work, and grouped by the project name in their text. A misgrouped or missing item can be reported through the site contact once it is set up.

This is not the school board's website

JeffDavisEdu.com is an independent public-information website created, owned and maintained by Brandon Kelley, a candidate for the Jefferson Davis Parish School Board, District 9. It is not operated, funded or endorsed by the Jefferson Davis Parish School Board.

For official school board information, go to www.jeffersondavis.org.

Go to the official website